NEW WELL & WATER SYSTEM IMPROVEMENTS PROJECT

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The New Well and Water System Improvements Project in Tehama County, California, focuses on replacing the Norcal Water Works system well, storage tank, and distribution pipeline. This initiative is driven by the need to address ongoing source and storage capacity issues, aging and leaking infrastructure, and the failure of a previous well that was improperly constructed. The project aims to restore safe and reliable drinking water and improve long-term management of the system, which has been under a boil water notice since March 2020. The work is categorized as exempt under CEQA Guidelines Section 15302(c) as it involves the replacement or reconstruction of existing facilities without increasing system capacity or service connections. The scope of work includes the installation of a 30,000-gallon storage tank, approximately 900 linear feet of six-inch water main, and the replacement of about 20 residential water service laterals. Additionally, the project requires the installation of booster pumps, electrical components, chlorination injection systems, and fencing around the storage tank yard. Performance will take place north of the City of Los Molinos, specifically on Assessor Parcel Numbers 047-230-020 and 047-120-035, as well as along Riverview Avenue and 4th Avenue. The project must be completed within one year from the date it is received by the Division of Drinking Water for review and must adhere to California standards regarding setbacks from structures and contamination sources. Funding is provided through the administrative costs of the Division of Drinking Water.

General Info

Tehama County project replacing Norcal Water Works infrastructure for safe drinking water by 2026.

Agency

California → Tehama County

Place of Performance

Riverview Avenue and 4th Avenue, CA, 96055

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Tehama County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Tehama County
Office AddressN/A

Full Description

Show more
The proposed Project involves the replacement of an existing Norcal Water Works system well, storage tank, and distribution pipeline to address ongoing source and storage capacity issues as well as aging and leaking distribution infrastructure. The Project would support the managerial consolidation of a water system that currently lacks adequate oversight. The system was put on a boil water notice in March 2020; in June 2024, attempted repairs revealed that the well was improperly constructed and rehab was infeasible. Replacing the well and other system infrastructure is necessary to restore safe, reliable drinking water and to facilitate improved long-term management of the water system.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont in North Carolina involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station. Key infrastructure work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The scope further encompasses the installation of mechanical and electrical systems, including pumps, a generator, and odor control equipment, along with gravity sewers, manholes, stormwater facilities, and site restoration. The project has an estimated value of 16,690,000 dollars and a substantial completion timeline of 560 calendar days. This solicitation, identified as SRP-W-134-0290, is a unit price contract awarded to the responsible bidder submitting the lowest responsive bid. Bidders must provide a completed EJCDC C-410 Bid Form, a bid bond, and evidence of authority to sign, while also demonstrating good faith efforts toward MWBE goals. The contract requires performance and payment bonds and adherence to strict technical standards, including AWWA Specification C-600 for pipelines and NEMA standards for motors. Payment is processed via monthly applications for payment, with funds becoming due 30 days after presentation to the owner. The project is set aside for small businesses, including certified veteran-owned, women-owned, and HUBZone small businesses.
Don Moorhead Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, associated supports, valves, and piping appurtenances. Additionally, the project requires the installation and operation of a temporary 11 MGD pumped bypass, the rehabilitation of reactor mixers and aerators, and the rerouting of sump pump discharge lines. Electrical and instrumentation work includes the installation of new or improved instrumentation, the rehabilitation and replacement of motor control center components, and modifications to existing sluice gates alongside the installation of new slide gates. The project also involves excavation, trench work, and surveying of key points around the reactors. This is a union project, and all subcontractors must utilize union labor. Potential subcontractors must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, providing their bond rate at the time of the bid for reimbursement. Quotes are due by November 17, 2026, with the final bid date set for November 18, 2026. This opportunity is set aside for small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone firms.
Garney Pacific, Inc.

POSTED

about 6 hours ago

DEADLINE

in 21 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS