NEW WELL & WATER SYSTEM IMPROVEMENTS PROJECT

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The New Well and Water System Improvements Project, managed by Tehama County in California, focuses on replacing the existing Norcal Water Works system well, storage tank, and distribution pipeline. This initiative is designed to resolve critical source and storage capacity issues and address aging, leaking infrastructure. The project is essential for restoring safe and reliable drinking water after a boil water notice was issued in March 2020 and subsequent findings in June 2024 determined that the original well was improperly constructed and could not be rehabilitated. Beyond the physical infrastructure upgrades, the project aims to support the managerial consolidation of the water system to ensure adequate oversight and improved long-term management. The forecast for this project is listed for September 1, 2026, with performance taking place in California. Tia Branton serves as the primary point of contact for this effort.

General Info

Tehama County project replacing Norcal Water Works infrastructure for safe drinking water by 2026.

Agency

California → Tehama County

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Riverview Avenue and 4th Avenue, CA, 96055

Set-Aside

NONE

Documents

(1)

NOE Norcal waterworks

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Tehama County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Tehama County
Office AddressN/A

Full Description

Show more
The proposed Project involves the replacement of an existing Norcal Water Works system well, storage tank, and distribution pipeline to address ongoing source and storage capacity issues as well as aging and leaking distribution infrastructure. The Project would support the managerial consolidation of a water system that currently lacks adequate oversight. The system was put on a boil water notice in March 2020; in June 2024, attempted repairs revealed that the well was improperly constructed and rehab was infeasible. Replacing the well and other system infrastructure is necessary to restore safe, reliable drinking water and to facilitate improved long-term management of the water system.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
JCSD Intervalley Pipeline Project in CA
Solicitation # jcsd-intervalley-pipeline-project-ca
The JCSD Intervalley Pipeline Project in Fontana, California, involves the demolition, furnishing, installation, testing, and operationalization of approximately 3.3 miles of 42-inch cement mortar lined and coated steel potable water transmission pipeline. The scope of work includes the installation of associated appurtenances such as trenchless crossings, air release valves, blowoff assemblies, valves, fittings, and connections to existing water facilities. Additional requirements encompass the construction of flow control facility components, site improvements, pavement removal and restoration, traffic control, utility coordination, and the final disinfection, startup, and commissioning of the system. Managed by Garney Pacific, Inc. for the Jurupa Community Services District, this solicitation seeks subcontractor and supplier quotes by September 18, 2026, at 2:00 PM PT. The project is open to various set-asides, including Small Business, Small Disadvantaged Business, Women-Owned Small Business, HUBZone, DBE, and DVB enterprises. All subcontractors must utilize union labor and be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company, with bond premiums reimbursable by Garney. Requested trade scopes include trenchless construction, steel pipe welding, electrical and instrumentation, cathodic protection, and various restoration and hauling services.