This Solicitation opportunity from California was posted on April 15, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The Newell Road Bridge Replacement Project in California involves the removal of a historic 114-year-old bridge spanning San Francisquito Creek, connecting Woodland Avenue in East Palo Alto and Newell Road in Palo Alto. The existing structure, approximately 22 feet wide and 80 feet long, will be replaced with a new bridge measuring about 42.6 feet by 80 feet. The scope of work includes designing and installing creek protection measures, dewatering plans, demolishing the existing concrete structures, and installing new Caltrans-standard reinforced concrete structures such as bridge abutments, floodwalls, and retaining walls. The project also entails raising the approaches by four feet, relocating utility appurtenances like water lines, hydrants, valves, and manholes, and implementing permanent creek protections, water line relocations, tree removal, and new planting. Work within the creek is restricted to a seasonal window from June 15 to October 15, with the entire project scheduled for completion within 1.5 years. The project is funded through the Highway Bridge Program, with strict adherence to Caltrans standards, and has an estimated cost of $12 million.
The contract, issued by the California Public Works-Engineering Division, is a solicitation posted on April 15, 2025, with a response deadline of May 13, 2025. It is designated under NAICS code 238110, indicating a specialty trade contractor classification. The primary point of contact is Nanette O'Brien, reachable via email or phone. The project emphasizes comprehensive planning, environmental compliance, and coordination of various construction activities to ensure the safe and efficient replacement of the historic bridge while minimizing environmental impact and maintaining public safety. The detailed scope and funding structure reflect a significant infrastructure investment aimed at improving transportation safety and resilience in the region.
DOCX, High priority: read this first2 pages · bid-bond
HighAI Summary for Bid Bond Form for City of Palo Alto Project: This Bid Bond form is a guarantee document for contractors submitting bids to the City of Palo Alto. It ensures the contractor will honor their bid and execute the contract if awarded. The bond amount is ten percent (10%) of the maximum bid proposal. The document outlines the obligations of the contractor and surety, conditions under which the bond is null and void, and provisions for changes or extensions. It includes spaces for contractor, surety, and project details, signatures, and legal affirmations. The form is intended to comply with statutory requirements and protect the owner from bid default risks.
PDF
PDF, High priority: read this firstbid-form
HighAI Summary for Bid Form IFB194068 Newell Road Bridge Replacement Project: This document is the Bid Form for the Newell Road Bridge Replacement Project under Invitation for Bids (IFB) Number 194068 issued by the City of Palo Alto. It includes a declaration by the bidder regarding the bid's authenticity and non-collusion, and confirms the bidder's agreement to provide all necessary materials, equipment, labor, and services as specified. The form lists estimated quantities and unit prices for various bid items such as construction surveys, lead compliance plan, traffic control systems, storm water pollution prevention, excavation, planting, and other construction-related tasks. The quantities are approximate and subject to adjustment based on actual work performed. The document is essential for submitting a formal bid response to the IFB.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for Construction Contract for City of Palo Alto Project: This Construction Contract document, identified as Contract No. XXXX, is between the City of Palo Alto and a Contractor for a specified project. It includes detailed sections such as recitals, definitions, project description, contract documents list, contractor duties, time of completion, compensation, indemnification, insurance, default and termination provisions, and compliance requirements. The document incorporates various related contract documents by reference, including change orders, bidding addenda, general conditions, project plans, and bonds. It establishes the terms and conditions governing the construction project, contractor obligations, and city rights, ensuring legal and procedural compliance for the execution and completion of the project.
PDF
PDF, High priority: read this firstdbE-commitment
HighAI Summary for Exhibit 15-G Construction Contract DBE Commitment IFB194068: Exhibit 15-G is a Construction Contract DBE Commitment form for the Newell Road Bridge Replacement Project (PE-12011) administered by the City of Palo Alto. The contract DBE goal is 23%. The document includes sections for contractor and local agency to fill in details such as bidder's name, prime certified DBE status, bid amounts, subcontractor details, and DBE participation. It also requires signatures from the contractor's preparer and local agency representative to certify the accuracy of the DBE participation information. The form is essential for documenting DBE commitments and compliance with federal and local requirements for the project identified as BRLS 5100(017).
PDF
PDF, High priority: read this firstexhibit
HighAI Summary for Exhibit 15-H Proposer Contractor Good Faith Efforts IFB194068: Exhibit 15-H outlines the proposer/contractor good faith efforts required to meet or exceed the Disadvantaged Business Enterprise (DBE) contract goal for Federal-aid Project BRLS-5100(017). It details the documentation proposers or bidders must submit within five calendar days from the cost proposal due date or bid opening, including publications, solicitations to DBEs, work items made available to DBEs, rejected DBE firms and reasons, assistance efforts, and contacts with agencies to support DBE participation. This exhibit protects bidder eligibility if DBE goals are not met due to certification or calculation issues.
PDF
PDF, High priority: read this firstifb
HighAI Summary for IFB194068 Exhibit 4 - LAPM Required Forms: This document is Exhibit 4 for IFB194068, containing required forms for the Invitation for Bid. It includes certifications and statements such as Equal Employment Opportunity Certification, Public Contract Code Statements (Sections 10285.1, 10162, 10232), Noncollusion Affidavit, Debarment and Suspension Certification, and Nonlobbying Certification for Federal-Aid Contracts. These forms are part of the proposal and require bidder's signature, certifying compliance with federal and state regulations, non-collusion, and eligibility to participate in the contract. The document is essential for bid submission and compliance verification.
PDF
PDF, High priority: read this firstifb
HighAI Summary for IFB194068 Newell Road Bridge Replacement Project: This Invitation for Bids (IFB) document, IFB194068, dated April 15, 2025, is for the Newell Road Bridge Replacement Project PE-12011 by the City of Palo Alto Public Works-Engineering Department. The project involves removing an old bridge over San Francisquito Creek and constructing a new bridge with Caltrans standard concrete structures, creek protection, utility adjustments, and landscaping. The bid due date is May 13, 2025, with a non-mandatory pre-bid meeting on April 28, 2025. The project is federally funded under the Highway Bridge Program and requires compliance with Caltrans standards and California labor laws. The estimated cost is $12 million, and the contract requires a Class A General Engineering Contractor license. Bids must be submitted electronically through the City's procurement portal.
PDF
PDF, High priority: read this firstifb
HighAI Summary for IFB 194068 Newell Road Bridge Replacement Project Cover Sheet: This document is the cover sheet for the Invitation for Bids (IFB) number 194068 for the Newell Road Bridge Replacement Project (PE-12011). It includes instructions for prospective bidders to complete and submit a Utilities Map Request Form to obtain approval and access to confidential project drawings. The project is associated with Federal Project Number BRLS 5100(017). This cover sheet is part of the public works department engineering division documentation.
PDF
PDF, High priority: read this firstifb
HighAI Summary for IFB 194068 Newell Road Bridge Replacement Project Special Provisions: This document is the Special Provisions section for the Newell Road Bridge Replacement Project under Invitation for Bids (IFB) number 194068, Federal Project BRLS 5100(017). Prepared by Darab Bouzarjomehri of NV5, Inc., it includes detailed contract requirements, technical specifications, and a comprehensive table of contents covering general provisions, construction, earthwork, structures, drainage, traffic control, electrical work, and materials. The document also lists applicable standard plans and a detailed bid item list with quantities and descriptions for various construction and environmental control tasks. This version is the final dated April 14, 2025.
PDF
PDF, High priority: read this firsttechnical-specifications
HighAI Summary for IFB 194068 Newell Road Bridge Replacement Project Technical Specifications: This document contains the technical specifications for the Newell Road Bridge Replacement Project under IFB number 194068, Federal Project Number BRLS 5100(017), issued by the City of Palo Alto Public Works Department Engineering Division. It supplements state technical specifications and includes detailed requirements for public notification, posting, project management, quality control, traffic control, environmental control, site maintenance, and contract closeout procedures. The document outlines specific instructions for advance notice door hangers, 'No Parking - Tow Away' signs, project signs, and coordination with city utilities. It also specifies execution details such as distribution of notifications, posting timelines, and responsibilities for notifying police departments regarding street closures and vehicle towing. The document is essential for contractors to comply with city and federal standards for the project.
PDF
PDF, High priority: read this firstinsurance-requirements
HighAI Summary for Insurance Requirements for Construction Newell Bridge IFB194068: This document outlines the insurance requirements for contractors working on the Newell Bridge construction project under IFB194068 for the City of Palo Alto. It specifies mandatory insurance coverages including worker's compensation, employer's liability, general liability, automobile liability, professional liability, pollution liability, and builders risk, with detailed minimum limits and conditions. The document mandates that the City of Palo Alto be named as an additional insured and requires contractors to provide certificates of insurance and endorsements. It also includes provisions for notice of cancellation, renewal of policies, and compliance conditions. The document is critical for contract award and compliance verification.
DOCX
DOCX, High priority: read this first2 pages · performance-bond
HighAI Summary for Performance Bond for City of Palo Alto Public Improvements: This document is a Contractor's Performance Surety Bond related to a public improvements agreement with the City of Palo Alto, California. It binds the Principal and Surety to ensure faithful performance of the contract, including indemnification and protection of the City against claims arising from the Principal's failure to perform. The bond includes provisions for costs, expenses, attorney's fees, and liquidated damages. It waives certain California Civil Code provisions and allows for changes to the contract without affecting the bond. The document includes signature blocks for the Surety and Principal, and a Certificate of Acknowledgment for notarization, verifying the identity of signatories.
PDF
PDF, High priority: read this firstspecial-provisions
HighAI Summary for Special Provisions IFB 194068 Newell Road Bridge Replacement: This document contains the Special Provisions for IFB No. 194068, titled Newell Road Bridge Replacement Project (PE-12011). It supplements the General Conditions and includes instructions for bidders such as submitting a Utility Map Request Form to obtain confidential project drawings. It references attachments for specifications, construction hours, insurance requirements, and compliance with the Local Assistance Procedures Manual (LAPM) due to federal funding. The document outlines required forms for bid submission, including DBE commitment and good faith efforts, with a DBE target of 23%. It also details insurance modifications and specialized construction restrictions.
PDF
PDF, High priority: read this firstsubcontractor-listing
HighAI Summary for Subcontractor Listing IFB194068 Updated: This document is a Subcontractor Listing form associated with IFB194068. It requires bidders to identify subcontractors performing work exceeding specified thresholds, including their names, business addresses, California contractor license numbers, DIR registration numbers, descriptions of work portions, bid item numbers, and subcontracted percentages. The form emphasizes compliance with Public Contract Code Section 4100 et seq. and prohibits changes after bid opening except by law. The listing must be complete and accurate to avoid bid rejection. The document includes multiple pages with tables for listing up to 29 subcontractors, with instructions to add more pages if necessary.
DOCX
DOCX, Low priority2 pages · payment-bond
LowAI Summary for Payment Surety Bond for City of Palo Alto Agreement: This document is a Contractor's Payment Surety Bond related to an agreement between the City of Palo Alto and a Principal contractor. It secures payment claims under California Civil Code sections for labor and materials supplied in public improvements. The bond amount is at least 100% of the contract value, guaranteeing payment to subcontractors and suppliers. The Surety waives notice of contract changes and agrees to pay reasonable attorney fees if sued. The document includes signature blocks for the Surety and Principal, and a notary acknowledgment section to verify execution.
PDF
PDF, Low priorityother
LowAI Summary for Utility Map Request Form IFB194068: This document is the Utility Map Request Form for the City of Palo Alto Utilities Department, associated with IFB194068. It provides instructions for requesting utility infrastructure information including water, gas, wastewater, electric, or fiber. The form requires requestor contact details, reason for the request, and a signed confidentiality agreement. It includes submission instructions and a confidentiality agreement outlining the handling and restrictions of the shared utility information. The document is intended to facilitate controlled access to sensitive utility maps and data.
Remove a 114-year-old bridge located over San Francisquito Creek spanning between Woodland Avenue (East Palo Alto) and Newell Road (Palo Alto). The existing bridge is approximate 22-ft wide and 80-ft long, and abutments are located within the creek. The proposed bridge is approximately 42.6-ft by 80-ft. Work includes design and install creek protection measure, dewatering plan, demo concrete structures, install new Caltrans standard concrete structures (bridge with reinforced pile abutments, floodwalls and retaining walls), raising the approaches (4-ft – 0) and utility appurtenances (hydrant, valves, cleanouts, laterals, mainlines, manholes, etc.) to grade. Contractor is responsible for the design of retaining walls, complying with environmental permits, preparing plans (traffic control, dewatering, logistics). Additional improvements include permanent creek protection measures, water line relocation, tree removal and new planting. Work within the creek is limited to June 15 – October 15 and all work to be completed within 1.5 years. The project is funded by Highway Bridge Program (HBP), compliance with Caltrans standards and practices is required.The Engineer's Estimate for this Project is $12 million.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award