Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on April 15, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Newell Road Bridge Replacement Project PE-12011

Closed
IFB194068State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238110
New
Federal
Z--Crow Agency Admin Building Concrete Pad
Solicitation # 140A1627Q0111
The Crow Agency Admin Building Concrete Pad project, solicitation 140A1627Q0111, is a firm fixed price construction effort managed by the Bureau of Indian Affairs under the Department of the Interior. This competitive acquisition is a set-aside for Indian Small Business Economic Enterprises (ISBEE) under NAICS code 238110, with a project magnitude of less than 35,000 dollars. The scope of work involves a concrete pad upgrade at the Crow Agency Admin Building, with all work performed according to specified attachments. The period of performance is mandatory and spans ninety calendar days following the issuance of a Notice to Proceed, which is contingent upon the acceptance of required bonding and insurance. Award will be based on the lowest total evaluated price, with the government assessing the lowest priced quote for fairness and reasonableness. Offerors must submit sealed proposals by December 15, 2026, including pricing and the Indian Affairs Indian Economic Enterprise Representation Form. The contract incorporates various FAR clauses regarding construction schedules, inspection, and safety standards, including the Buy American requirement for construction materials. Invoicing must be processed electronically via the Invoice Processing Platform (IPP) and requires approval and acceptance by the Government COR before payment is issued.
Bureau Of Indian Affairs

POSTED

about 4 hours ago

DEADLINE

in 28 days

AI Contract Overview

Show more

The Newell Road Bridge Replacement Project in California involves the removal of a historic 114-year-old bridge spanning San Francisquito Creek, connecting Woodland Avenue in East Palo Alto and Newell Road in Palo Alto. The existing structure, approximately 22 feet wide and 80 feet long, will be replaced with a new bridge measuring about 42.6 feet by 80 feet. The scope of work includes designing and installing creek protection measures, dewatering plans, demolishing the existing concrete structures, and installing new Caltrans-standard reinforced concrete structures such as bridge abutments, floodwalls, and retaining walls. The project also entails raising the approaches by four feet, relocating utility appurtenances like water lines, hydrants, valves, and manholes, and implementing permanent creek protections, water line relocations, tree removal, and new planting. Work within the creek is restricted to a seasonal window from June 15 to October 15, with the entire project scheduled for completion within 1.5 years. The project is funded through the Highway Bridge Program, with strict adherence to Caltrans standards, and has an estimated cost of $12 million. The contract, issued by the California Public Works-Engineering Division, is a solicitation posted on April 15, 2025, with a response deadline of May 13, 2025. It is designated under NAICS code 238110, indicating a specialty trade contractor classification. The primary point of contact is Nanette O'Brien, reachable via email or phone. The project emphasizes comprehensive planning, environmental compliance, and coordination of various construction activities to ensure the safe and efficient replacement of the historic bridge while minimizing environmental impact and maintaining public safety. The detailed scope and funding structure reflect a significant infrastructure investment aimed at improving transportation safety and resilience in the region.

Documents

17
DOCX, High priority: read this first2 pages · bid-bond
High
PDF, High priority: read this firstbid-form
High
PDF, High priority: read this firstcontract-document
High
PDF, High priority: read this firstdbE-commitment
High
PDF, High priority: read this firstexhibit
High
PDF, High priority: read this firstifb
High
PDF, High priority: read this firstifb
High
PDF, High priority: read this firstifb
High
PDF, High priority: read this firstifb
High
PDF, High priority: read this firsttechnical-specifications
High
PDF, High priority: read this firstinsurance-requirements
High
DOCX, High priority: read this first2 pages · performance-bond
High
PDF, High priority: read this firstspecial-provisions
High
PDF, High priority: read this firstsubcontractor-listing
High
DOCX, Low priority2 pages · payment-bond
Low
PDF, Low priorityother
Low
PDF

Read all 17 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • ASO-0953-00 Construction of standalone DME at Paulding Northwest Atlanta Airport (PUJ), Dallas, GAOpen now, due in 43 days
  • 26_1123 – Hanska-MNOpen now, due in 3 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works-Engineering Division
Contacts1 person available
OfficeN/A

Full Description

Show more
Remove a 114-year-old bridge located over San Francisquito Creek spanning between Woodland Avenue (East Palo Alto) and Newell Road (Palo Alto). The existing bridge is approximate 22-ft wide and 80-ft long, and abutments are located within the creek. The proposed bridge is approximately 42.6-ft by 80-ft. Work includes design and install creek protection measure, dewatering plan, demo concrete structures, install new Caltrans standard concrete structures (bridge with reinforced pile abutments, floodwalls and retaining walls), raising the approaches (4-ft – 0) and utility appurtenances (hydrant, valves, cleanouts, laterals, mainlines, manholes, etc.) to grade. Contractor is responsible for the design of retaining walls, complying with environmental permits, preparing plans (traffic control, dewatering, logistics). Additional improvements include permanent creek protection measures, water line relocation, tree removal and new planting. Work within the creek is limited to June 15 – October 15 and all work to be completed within 1.5 years. The project is funded by Highway Bridge Program (HBP), compliance with Caltrans standards and practices is required.The Engineer's Estimate for this Project is $12 million.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS