Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on December 30, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

NEWRF Filter Station - Partial Filter Media Replacement

Closed
IFB- 26 - 044State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction effort for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key station improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also requires the installation of new gravity sewers, manholes, and various site improvements including stormwater facilities, fencing, and paving. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 10, 2026, and must include a bid bond, a completed bid form, and evidence of authority to sign. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and insurance from companies with an A.M. Best rating of A-VII or better. Performance is measured by the Engineer's issuance of a Certificate of Substantial Completion, with technical adherence to AWWA, NEMA, AWS, and ASTM standards. Payment is processed via Applications for Payment and becomes due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 15 hours ago

DEADLINE

in 19 days

AI Contract Overview

Show more

The Northeast Water Reclamation Facility (NEWRF) Filter Station is in the process of phased upgrades to ensure continued treatment efficiency and operational stability. A new, identical filter station is being designed to operate alongside the existing system. Upon its completion and commissioning, the current filter station will be fully refurbished, which includes replacing all filter media and underdrain tile systems. In the meantime, this interim project focuses solely on removing and replacing the top four layers of media in the existing filters to restore their performance without disrupting ongoing operations. The lower gravel and tile components will remain intact and operational until the full rehabilitation work begins after the new station is put into service. The contract titled "NEWRF Filter Station - Partial Filter Media Replacement" was posted on December 30, 2025, with a response deadline of January 22, 2026. It is issued by the Florida Water Resources agency, based in St. Petersburg, Florida. Key contacts for this project include Patrick Linn, Senior Plant Maintenance Coordinator, and Tanner Green, Procurement Analyst. This solicitation aims to restore filter media functionality as a temporary measure ahead of the comprehensive refurbishment of the existing filter station once the new, parallel facility is operational.

General Info

Partial filter media replacement at NEWRF to restore performance before full refurbishment post new station.

Documents

9

City of St. Petersburg Quote Addendum

PDF, High priority: read this firstcontract-document
High

IFB-26-044 NEWRF Filter Station Partial Filter Media Replacement

PDF, High priority: read this first27 pages · ifb
High

MBM-S-100 Filter Media and Gravel Specification

DOC, High priority: read this first4 pages · specifications
High

MBM-S-100 Filter Media and Gravel Specifications

DOC, High priority: read this first4 pages · specifications
High

NEWRF Filter Station Partial Filter Media Replacement Scope of Services

DOCX, High priority: read this first4 pages · sow
High

ANSI/AWWA B100-16 Granular Filter Material Standard

PDF, Low priority56 pages · standard
Low

ANSI/AWWA B100-16 Granular Filter Material Standard

PDF, Low priority56 pages · standard
Low

Bid Tabulation for NEWRF Filter Media Replacement

XLSX, Low priority2 pages · bid-tabulation
Low

As-Built_Drawings.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Water Resources
Contacts2 people available
OfficeSt. Petersburg, FL, 33731, USA
Organization / AgencyFlorida → Water Resources
Office AddressSt. Petersburg, FL, 33731, USA
Contacts
Patrick LinnSenior Plant Maintenance Coordinator
Tanner GreenProcurement Analyst

Interested Companies (25)

EER ServiceORLANDO, FL
ConstructConnectCincinnati, OH
Moss Kelley

See All 25 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The Northeast Water Reclamation Facility (NEWRF) Filter Station is undergoing phased improvements to maintain treatment performance and operational reliability. A new, parallel filter station—designed as a mirror image of the existing system—is currently in design. Once that facility is constructed and placed into service, the existing filter station will be taken offline for full refurbishment, including replacement of all filter media and underdrain tile systems. This interim project is limited to the removal and replacement of the top four layers of media in the existing filters to restore performance while maintaining continuous operations. The lower gravel and tile systems will remain in service and undisturbed until the complete rehabilitation phase begins following commissioning of the new filter station.

More opportunities from Florida → Water Resources

Same awarding agency

NAICS: 327410
SLED
Chemical, Calcium Oxide
Solicitation # IFB-26-344
The City of St. Petersburg is soliciting bids under IFB-26-344 for a qualified vendor to supply and deliver high calcium oxide (lime) to the Cosme Water Treatment Plant in Odessa, Florida. The contract is for an estimated annual usage of 1,800 dry tons, delivered in bulk on an as-needed basis. The vendor is responsible for all labor, equipment, and pumping requirements to fill the city's seven 50-ton storage silos. All provided lime must be high calcium quicklime with a minimum calcium oxide content of 90% and a maximum of 5% insoluble matter, adhering to AWWA Standard B202-25. Each shipment must include a Certificate of Analysis, and all deliveries must comply with OSHA and U.S. Department of Transportation hazardous material regulations. The agreement features an initial three-year term with two optional one-year renewals. Awardees must provide a performance and payment bond equal to 100% of the bid and maintain significant insurance coverage, including $1,000,000 per occurrence for general liability and $1,000,000 for automobile liability. Evaluation factors include a minimum of two years of experience, a reference list of at least three customers, and the ability to provide first-priority service during natural disasters. Bids must be submitted via the OpenGov Procurement portal by October 29, 2026, and must include a bid bond for 5% of the total bid amount.
Lime Manufacturing

POSTED

21 days ago

DEADLINE

in 7 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS