Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Agriculture was posted on July 18, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Nez Perce Clearwater National Forest - Red River Work Center Wastewater Electrical Distribution and Solenoid Valve Project

Closed
1240LU24Q0052Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

23711

Place of Performance

Elk City, ID, 83525, USA

Set-Aside

SBA

Documents

8

Appendix A - Manhole Sealing Drawings

PDF, High priority: read this firstspecifications
High

Clarifications.pdf

PDF, High priority: read this first2 pages · q-and-a
High

Red River Work Center Dump Station Wastewater Electric Distribution and Solenoid Valve

PDF, High priority: read this first47 pages · rfp
High

Red River Work Center Wastewater Electrical Distribution and Solenoid Valve Project Manual

PDF, High priority: read this firstspecifications
High

Red River Work Center Wastewater Electric Distribution and Solenoid Valve Project Drawings

PDF, High priority: read this first9 pages · specifications
High

Solicitation 1240LU24Q0052 Amendment 0001

PDF, High priority: read this firstamendment
High

Solicitation 1240LU24Q0052 - Red River Work Center Wastewater Project

PDF, High priority: read this first3 pages · rfp
High

Wage Determination ID20240051 - Idaho County Heavy Construction

PDF, High priority: read this firstwage-determination
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Combined Synopsis

Notice updated

Response deadline changed from Jul 19, 2024 to Aug 5, 2024. The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Csa Intermountain 9 Usda-Fs
Contacts2 people available
OfficeOgden, UT, 844012310, USA
Office AddressOgden, UT, 844012310, USA
Contacts
Wes Dudley Contracting Officer

Full Description

Show more
Work for this project consists of providing labor and materials for the removal and disposal of the sewer distribution vault piping, installation of new hydraulically controlled solenoid valve manifolds within existing distribution vaults, and installation of new electrical wiring and custom control for valve operation. The work includes but is not limited to furnishing and installation of equipment and providing all labor in the general trades of work: site work, excavation, trenching and backfill, piping laying, electrical equipment installation, epoxy painting, and other related trades. Please read solicitation documents carefully, as well as sign and acknowledge amendment 0001.

More opportunities from Department Of Agriculture → Csa Intermountain 9 Usda-Fs

Same awarding agency

NAICS: 238210
New
Federal
USDA Forest Service - Hebgen Lake District Office Network Cabling and IT Room Improvements
Solicitation # 1240LU26Q0132
Solicitation 1240LU26Q0132 is a total small business set-aside request for quotation issued by the USDA Forest Service for network cabling and IT room improvements at the Hebgen Lake Ranger District office in West Yellowstone, Montana. The project involves upgrading the facility's IT infrastructure through the installation of 51 new Category 6 structured cabling runs for workstations and wireless access points, all home-run to a new data cabinet. Key deliverables include the installation of a fire-rated plywood backboard, a wall-mounted IT cabinet, grounding systems, dedicated 12vac 20amp AC circuits, an Uninterrupted Power Supply (UPS), and a Power Distribution Unit (PDU). The contractor is also responsible for the removal and disposal of obsolete cabling and must ensure all work meets ANSI/TIA-568 standards and local electrical codes. The contract is anticipated as a firm-fixed-price award based on best value, evaluating price, relevant experience, and past performance. The original performance period was scheduled from November 1, 2026, to December 31, 2026, though Amendment 0001 extended the period of performance through January 15, 2027. This acquisition is subject to the Davis-Bacon Act, requiring adherence to prevailing wage rates for Gallatin County, Montana. Award criteria include a review of five relevant contracts completed within the last five years to assess technical quality and timeliness. Inspection and acceptance of the construction will be conducted in accordance with FAR 52.246-12.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

about 10 hours ago

DEADLINE

in about 1 year
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS