Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Nez Perce-Clearwater NFs - Big Creek Bridge, Road No. 311 - M.P. 10.5

Active
12034318R0025Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves the removal of an existing timber bridge and construction of a new steel girder bridge measuring 60 feet in span and 18 feet in usable width. The new structure will feature a timber glue-laminated deck supported by a concrete grade beam foundation. The scope includes structure excavation, installation of riprap and geocell for abutment stabilization, placement of concrete grade beams, erection of the steel girder bridge with timber running planks, backfilling, and installation of glue-laminated curbs. Additionally, improvements extend to embankment and excavation of the roadway approaches, as well as laying new crushed aggregate surfacing. The project site is located in the Red River Ranger District of the Nez Perce-Clearwater National Forests, near Elk City in Idaho County, Idaho. Work is scheduled to begin around July 1, 2019, with completion required by September 30, 2019. All in-stream construction activities are restricted to the period between July 15 and September 30, 2019. The solicitation was posted on July 10, 2018, with final drawings and specifications to be made available shortly thereafter, and award anticipated in late August 2018. Notice to Proceed will be issued in Fall-Winter 2018 to allow for fabrication of bridge components. The contract is a total small business set-aside with an estimated value between $100,000 and $250,000. Bids exceeding $250,000 must include bid bonds. The project was re-posted under a corrected solicitation number to ensure outreach to the appropriate business community, with contact available through the regional office in Missoula, Montana.

General Info

Remove timber bridge, build 60-ft steel girder bridge with timber deck, Idaho site, small business set-aside.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Red River Ranger Station 300 American River Road, ELK CITY, ID, 83525, USA

Set-Aside

SBA

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhasePresolicitation
Posted

Presolicitation

Notice updated

The notice description changed.

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → R1 Regional Office
Contacts1 person available
OfficeMISSOULA, MT, 59804, USA
Office AddressMISSOULA, MT, 59804, USA

Full Description

Show more
The project consists of the removal of an existing timber bridge and the construction of a new 60-0 span by 18-0 useable width steel girder bridge with a timber glulam deck and concrete grade beam foundation. Improvements consist of, but are not limited to: structure excavation, placement of riprap, geocell abutment stabilization, installation of concrete grade beams, furnishing and erecting a new steel girder bridge with timber glue-laminated deck and timber running planks, backfill, installation of glue-laminated curb, embankment and excavation of the roadway approaches, and placing new crushed aggregate surfacing. The project is located in the Red River Ranger District of the Nez Perce-Clearwater National Forests, southwest of Elk City in Idaho County, Idaho (Section 18, Township 26 North, Range 7 East). The Government's estimate for the project is between $100,000 and $250,000. Work on the project site shall commence approximately July 1, 2019, and proceed in accordance with the contractor's approved work schedule and run continuously until the end of the project no later than September 30, 2019. All in-stream work must take place between July 15 and September 30, 2019. The complete solicitation with final drawings and specifications shall be posted to FBO approximately July 11, 2018 with award anticipated in late August. The Notice to Proceed shall be issued in the Fall-Winter of 2018 to facilitate fabrication of bridge parts. Bid bonds are required for offers that exceed $250,000. This project has been set-aside for small businesses. This presolicitation was posted on 6/22/18 to the incorrect US Forest Service FBO location by mistake. The original posting, made under the R-1 Northern Region location, should have been made under the IMAT (Idaho Montana Acquisition Team) location. In order to ensure that the notice and solicitation reach the correct market and pool of vendors, the notice and solicitation have been re-posted under a new solicitation number: 12034318R0027 under the IMAT FBO location. This notice will serve as the 15-day FAR required presolication posting for the procurement.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Alligator Creek Weir Structure Repairs
Solicitation # FWC 26/27-33C
The Florida Fish and Wildlife Conservation Commission issued solicitation FWC 26/27-33C for the concrete rehabilitation of a 70-year-old water control weir structure located at the north prong of Alligator Creek in the Babcock Webb WMA. The scope of work includes short-term repairs such as spall and crack repairs, as well as the restoration of a significantly eroding cold joint, all performed according to specifications by GM Hill Engineering and Chapter 255 of the Florida Statutes. While the agency's estimated budget for the project was 45,000 dollars, the contract was awarded to A Thomas Construction Inc. following a competitive bidding process that included a mandatory pre-bid conference on September 29, 2026, and a bid opening on October 13, 2026. The awarded contract is a lump sum agreement with a total value of 29,890 dollars. Key requirements for the contractor include the provision of 100 percent performance and labor and material payment bonds regardless of the contract value, adherence to Build America, Buy America domestic material preferences, and compliance with Davis-Bacon Act prevailing wage standards for federally funded construction. The agency decision to award the contract was posted on October 15, 2026, initiating a 72-hour protest period pursuant to Chapter 120, Florida Statutes. Final acceptance of the project is contingent upon a Certificate of Substantial Completion and a final inspection approved by the owner.
Florida Fish and Wildlife Conservation Commission

POSTED

about 23 hours ago

DEADLINE

in 4 days
View Details
NAICS: 237990
New
Federal
Sources Sought Wood River Relief Wells Construction
Solicitation # W912P926Z9215
The Department of Defense, through the U.S. Army Corps of Engineers St. Louis District, has issued a Sources Sought Notice under solicitation W912P926Z9215 for the Wood River Relief Wells No. 2 construction project. This notice is intended for market research and informational purposes to identify capable contractors and does not constitute a formal Request for Proposal. The project is located within the Lower Wood River Flood Protection Project in Madison County, Illinois, specifically covering Reach II and Reach III between river miles 195 and 203 on the east bank of the Mississippi River. The scope of work involves the construction of 42 surface discharging Type D relief wells, 13 Type T relief wells placed in manholes with lateral discharge pipes, and six piezometers consisting of three sets of crown and toe piezometers. Additionally, the project requires the installation of a relief well manhole collector system with associated culverts, as well as localized fill placement and channel improvements within Old Wood River Creek. Interested businesses must be registered in the System for Award Management under NAICS Code 237990. To be considered, respondents must submit a capability and experience statement to Logan Kohrmann by 10:00 a.m. CDT on October 28, 2026. Submissions must include the business name, point of contact, business size and category, CAGE or UEI code, and descriptions of up to three similar projects performed as a prime contractor, detailing the percentage of work self-performed versus subcontracted.
W07V Endist St Louis

POSTED

about 23 hours ago

DEADLINE

in 12 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS