Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on May 31, 2018. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Nez Perce-Clearwater NFs - Crooked River Valley Rehabilitation Phase 1

Awarded
12034318R0012Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex located at 28 Bare Cove Park Drive. This fixed-price lump sum project has an estimated construction cost of $1,300,000. The scope of work includes site preparation such as the removal of trees, shrubs, and stumps, re-grading the site, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the contractor is responsible for a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor must coordinate with the Town and the demolition contractor, Pasquazzi Bros, Inc., and is responsible for maintaining construction fencing and erosion control throughout the project duration. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or paved athletic facilities. Bidders must submit their proposals electronically via the OpenGov portal by November 3, 2026, including a 5% bid security and a Statement of Qualifications with at least three similar public project references. Awarded contractors must provide a payment bond equal to 50% of the total project cost and adhere to Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code. The project includes a minimum one-year warranty for labor and a two-year warranty for materials. Final payment is contingent upon the submission of AIA affidavits for the payment of debts and release of liens.
Recreation

POSTED

about 3 hours ago

DEADLINE

in 5 days
NAICS: 237990
New
SLED
Pre-Qualification For Construction Of Park, Recreation & Libraries Parks And Facilities For 2027
Solicitation # 13-202
Solicitation 13-202 is a pre-qualification process issued by the City of Roseville, California, for the construction of park, recreation, and library facilities scheduled for 2027. The objective is to identify qualified contractors with the capacity and experience to execute new park construction and rehabilitation projects. Interested parties must submit their pre-qualification packages via email to the City Clerk’s Office by 3:00 p.m. on November 23, 2026. Submissions are limited to 25 megabytes and must include a signed questionnaire, DIR registration for all contractors and subcontractors, and current workers' compensation certificates of insurance. To achieve pre-qualified status, applicants must meet essential qualifications, including a valid California Contractor's license and specific insurance limits of 1,000,000 dollars per occurrence and 2,000,000 dollars aggregate. Experience requirements mandate the completion of at least six new park construction projects for public agencies within the last three years, with a maximum of three rehabilitation projects allowed toward this total. Financial solvency is verified through third-party credit checks, where a score of 650 or less may lead to disqualification. Evaluation also considers compliance with California apprenticeship laws, Davis-Bacon prevailing wage requirements, and CAL OSHA safety standards.
City of Roseville, Parks, Recreation & Libraries Department (PRL)

POSTED

about 4 hours ago

DEADLINE

in 25 days

General Info

Contract Value

$643,094

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Red River Ranger District 300 American River Road, ELK CITY, ID, 83525, USA

Set-Aside

NONE

Award Issued Date

Documents

12

A-7_Amend1.doc

DOC

A-7AttachmentJ2_Drawings_Pages15_21.pdf

PDF

A-7AttachmentJ2_Drawings_Pages1_7.pdf

PDF

A-7AttachmentJ2_Drawings_Pages8_14.pdf

PDF

A-7AttachmentJ3_TempBridgeDrawings.pdf

PDF

A-7AttachmentJ4CrookedRiver_Tech_Specs_DRAFT5-FINAL.docx

DOCX

A-7AttachmentJ5_SWPPPTemplate.docx

DOCX

A-7AttachmentJ6_AerialPhotos.pdf

PDF

A-7AttachmentJ8_AD3030.pdf

PDF

A-7AttachmentJ9_AD3031.pdf

PDF

A-7RFP.docx

DOCX

SiteTourNotes.docx

DOCX

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline added: May 24, 2018. The notice description changed.

Notice updated

The notice description changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → USDA Forest Service
Contacts1 person available
OfficeCOEUR D ALENE, ID, 83815, USA
Office AddressCOEUR D ALENE, ID, 83815, USA

Full Description

Show more
The objective of the Crooked River Valley Rehabilitation Project is to address the impacts of historical dredge mining on aquatic habitat conditions. The Crooked River Valley Rehabilitation project was designed to be constructed in 4 - 6 Phases with associated work designed as Optional Items. The Phases include building a bypass channel, rebuilding floodplain and river channel, and adding large wood structures. Phase 1 Bypass work was completed in 2016, Phase 2 Bypass work was completed in 2017 and large section of floodplain was treated in 2017 (designed as an Optional Item). The project is being performed on the Red River Ranger District of the Nez Perce Clearwater National Forests in collaboration with the Nez Perce Tribe Watershed Program and funded by Bonneville Power Administration. The project area is located approximately 45 mi east of Grangeville, Idaho. At the junction of Highway 14 and the Crooked River Road (FR 233), travel south for approximately 0.25 mile to the project area. This contract requires completion of Phase 1 of the Crooked River Valley Rehabilitation Project. Phase 1 requires construction of 300 feet of bypass channel, construction of a diversion structure and activating one section of the previously built bypass channel. The contractor shall install a temporary bridge, re-grade approximately 22 acres of floodplain, import fill material from an existing staging area, and construct 4,200 feet of new river channel with pools, riffles and channel features. During channel construction, riverbed fill and stream bank material may need to be sorted or screened to meet gradation specifications if suitable material is not found. The floodplain re-grading will require moving and reshaping approximately 50,200 cubic yards of mine tailings on site and importing approximately 6,200 cubic yards of tailings from the staging area to meet grading requirements and final floodplain slope. Depressions, swales, side channel and wetland features shall also be constructed. Unsuitable floodplain material shall be sorted if necessary to meet proper material gradations. Slash salvaged from the work area and already stockpiled at the staging area will be spread on approximately 10 acres of floodplain to provide roughness. Government lead fish salvage operations will occur in over one mile of river channel and within approximately 20 existing pools. The government estimates that this operation will take approximately 5 days. The Contractor shall assist the government in its fish salvage efforts by reducing flows in the main stem of Crooked River, pumping large pools, and maintaining low turbidity levels. In addition, the contractor shall excavate the plug to the bypass channel and construct a temporary diversion structure to reduce flow in the main channel. The contractor shall perform survey and construction staking incidental to the work items required. The contractor shall furnish all labor, equipment, structures, supervision, transportation, operating supplies (except those designated at Government-furnished), and incidentals necessary to complete the project as required by the contract, plans, and specifications. An additive bid item will be included to solicit prices for the construction of large woody debris structures. Award of this work will be made concurrent with award of the base items of work; the number of structures awarded under this item shall be dependent on the funds available but would not exceed 19 structures. The Government's construction estimate is between $500,000 and $1,000,000. A formal pre-bid tour will be held; details will be provided in the solicitation. It is anticipated that the full solicitation with complete technical specifications and drawings shall be issued in mid-April. Construction work shall commence approximately July 1, 2018; all work shall be completed by October 31, 2018. All in-stream work to dewater the main channel and activate the bypass channel shall be performed after July 15, 2018. Original bid bonds will be required. The acquisition has been set-aside for small businesses. Solicitation was issued 4/24/18 with offers due 5/23/18. The pre-bid tour was held on 5/8/2018. Attendance list and notes have been provided. Solicitation was amended on 5/15/2018. Offerors shall acknowledge this material amendment and use the revised Schedule of Items B-1 for their price proposals. Deadline for receipt of offers was not extended.

More opportunities from Department Of Agriculture → USDA Forest Service

Same awarding agency

NAICS: 621111
New
Federal
Jacobs Creek JCC Medical Services
Solicitation # 1282A727Q0002
Solicitation 1282A727Q0002 is a Request for Quotation issued by the USDA Forest Service for on-site medical services at the Jacobs Creek Job Corps Center in Bristol, Tennessee. This firm-fixed-price contract is 100% set aside for small businesses under NAICS code 621111. The scope of work requires licensed medical professionals, such as Physicians, Nurse Practitioners, or Physician Assistants, to provide basic health services including examinations, assessments, treatment, immunizations, and prescription issuance. Services are typically required one to two days per week, Monday through Friday, from 8 am to 5 pm, totaling 400 hours per year. The contract structure consists of a base year running from January 11, 2027, to January 10, 2028, with four one-year options and a final six-month extension. Award will be based on best value, with technical capability and past performance weighted more heavily than price. To be considered responsive, offerors must submit a completed Quoter’s Questionnaire, current resumes for key personnel, unrestricted medical licenses, DEA registrations, and proof of medical liability insurance of at least 1 million dollars. All services must comply with OSHA, HIPAA, and American Medical Association guidelines. Invoices are to be submitted monthly via the Invoicing Processing Platform. Quotations must be submitted in Word or PDF format to the designated point of contact by 5:00 PM Eastern Time on November 17, 2026.
Offices of Physicians (except Mental Health Specialists)

POSTED

1 day ago

DEADLINE

in 19 days
View Details
NAICS: 237310
New
Federal
GAOA Brainard Lake Recreation Area Deferred Maintenance
Solicitation # 1240LT27Q0004
Solicitation 1240LT27Q0004 is a Request for Quotation issued by the USDA Forest Service for deferred maintenance and accessibility improvements at the Niwot Picnic Trailhead within the Brainard Lake Recreation Area near Ward, Colorado. This project, estimated between $100,000 and $250,000, is a 100% Total Small Business Set-Aside under NAICS 237310. The scope of work includes demolishing existing timber parking barriers and retaining walls, constructing new rock retaining walls and timber steps, creating accessible compacted aggregate trails, renovating and constructing picnic sites, and revegetating disturbed areas. The contractor must commence work within 10 calendar days of the notice to proceed and complete all tasks, including final cleanup, within 120 calendar days. The contract is awarded based on the lowest price technically acceptable criteria, evaluating the offeror's technical approach and past performance on at least three similar projects completed within the last three years. Required submissions include a signed SF1442, a priced Schedule of Items, a technical proposal, and bid guarantees. Key compliance requirements include adherence to Davis-Bacon wage determinations, OSHA safety regulations, and MUTCD standards for signage. Performance and payment bonds are required, and the contractor must submit a company-approved accident prevention plan and evidence of insurance before beginning on-site work. Inspection and final acceptance are governed by FAR 52.246-12.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in about 2 months
View Details
NAICS: 238990
New
Federal
GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF
Solicitation # 1240BH26R0013
Solicitation 1240BH26R0013 is a request for proposals issued by the USDA Forest Service for the rehabilitation of the Blanchard Springs Caverns Tunnel in the Ozark-St. Francis National Forest, Arkansas. This project is a 100% small business set-aside under NAICS 238990 with an estimated magnitude exceeding 10 million dollars. The scope of work encompasses comprehensive infrastructure repairs and safety upgrades for the Dripstone and Discovery Trail, including structural stabilization of tunnel entrances and exits, masonry repairs, and the installation of ground support using rock bolts and shotcrete. Additionally, the contractor will replace air lock and security doors, suspended ceiling systems, lighting and distribution components, safety handrails, and the mine phone system. The contract requires a qualified contractor to begin work within 10 calendar days of the notice to proceed, with a total performance period of 426 calendar days. Award will be based on the best value tradeoff process, evaluating price, technical approach, and past performance, specifically requiring three similar projects completed within the last three years. Key requirements include the use of specialized shotcrete and earthwork contractors with at least five years of experience, adherence to Davis-Bacon prevailing wage rates, and compliance with Buy American and ADA standards. Proposals must be submitted as separate PDF files, including a signed SF1442, a price proposal, a technical proposal, and bid guarantees, with a final submission deadline of October 29, 2026.
All Other Specialty Trade Contractors

POSTED

3 days ago

DEADLINE

in about 1 hour
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS