Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Agriculture was posted on August 2, 2021. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

NezPerce Clearwater NF, Red River Work Center, Wastewater Electrical Distribution

Closed
1240LU21Q0004Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational facility, including the installation of pumps, a generator, odor control equipment, new gravity sewers, and manholes, while managing by-pass pumping, testing, and commissioning. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 12, 2026, and must be submitted using the EJCDC C-410 Bid Form. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and proof of insurance. Technical standards include AWWA Specification C-600 for pipelines, NEMA MG1 for motors, and AWS D1.2 for aluminum welding. Project administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with terms set at 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 10 hours ago

DEADLINE

in 20 days

General Info

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

Elk City, ID, 83525, USA

Set-Aside

SBA

Documents

6

RedRiverWastewaterConstruction_RFQ_21Q0004.docx

DOCX

Red+River+Wastewater+Electronic+Distribution_Solenoid+Valve+Drawings.pdf

PDF

Red+River+Wastewater+ValvesProject+Manual.pdf

PDF

Red+River+Work+Center+Wastewater+Electrical+Distribution+Map.pdf

PDF

SF18_1240LU21Q0004_RRWastewater.pdf

PDF

WageDecisionID20210051_IdahoCounty.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Response Deadline

Deadline has passed

Notice updated

Notice details unchanged. Attachments may have changed.

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Nez Perce-Clearwater Nfs
Contacts2 people available
OfficeGRANGEVILLE, ID, 83530, USA
Office AddressGRANGEVILLE, ID, 83530, USA

Full Description

Show more
Nez Perce Clearwater NF, Red River Work Center Wastewater Electrical Distribution. Project consists of providing labor and materials for the removal and disposal of the distribution vault and meter pit piping, installation of a new magnetic flow meter, installation of new hydraulically controlled solenoid valve manifolds within existing distribution vaults, and Installation of new electrical wiring and custom control for valve operation. The work includes, but is not limited to furnishing and installation of equipment, materials and related appurtenances, and providing all labor in the following general trades of work site work, excavation, trenching and backfill, piping, equipment installation and other related trades to complete the work. Project location from Grangeville, Idaho, located approximately 45 miles east on Hwy 14 to Elk City. Turn right onto the Red River Road NFSR 222 heading south for 10 miles to the Red River Administrative Site. See construction. Project completion September 17, 2021. Estimated price range between $100,000 - $250,000.

More opportunities from Department Of Agriculture → Nez Perce-Clearwater Nfs

Same awarding agency

NAICS: 238160
New
Federal
Fenn Ranger Station roofing replacement
Solicitation # 1240LU26Q0130
Solicitation 1240LU26Q0130 is a firm fixed price contract for the Nez Perce-Clearwater National Forest to replace the cedar shake roofs on the Bunkhouse and Cookhouse at the Fenn Ranger Station in Kooskia, Idaho. This total small business set-aside under NAICS 238160 requires the contractor to provide all labor and materials, including 16-inch No. 1 Red Cedar premium grade shingles, underlayment, and weatherproofing. The project emphasizes maintaining the historical integrity of the structures and requires all roofing materials to be sourced from a single manufacturer for consistency. Old materials must be disposed of off-forest in accordance with state and federal laws. The award will be based on the best value, weighing technical criteria and price approximately equally. Technical evaluation factors include past performance, a proposed schedule, experience in cedar shingle roofing, and the technical approach. The period of performance is ten days after the notice to proceed, with a final delivery date not later than November 15, 2027. Key requirements include a payment bond for 100 percent of the award price, compliance with Davis-Bacon Act wage determinations, and adherence to OSHA safety standards. Quotes must be submitted to the primary point of contact by November 5, 2026, and must include a completed SF 1442, price schedule, past performance questionnaire, and a written technical approach.
Roofing Contractors

POSTED

6 days ago

DEADLINE

in 16 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS