Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on September 21, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Nolte Road Booster Pump Station - WIFIA

Closed
IFB-24-042State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises for labor, materials, and services for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves extensive sewer infrastructure improvements, including the open-cut installation of PVC and Ductile Iron Pipe ranging from 6 to 30 inches in diameter. Key technical requirements include the installation of standard and doghouse manholes, interior drop assemblies, and 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional deliverables include the construction of an outfall and a CSO regulator fit out. Project requirements also encompass critical site management and compliance tasks, such as the implementation and maintenance of a Stormwater Pollution Prevention Plan, geotechnical instrumentation and monitoring, and the maintenance of flows and bypass. General base bid items include mobilization, clearing and grubbing of wooded areas, and seeding and fine grading. Notably, the project requires specific railroad insurance.
Cleary Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 16 days
NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is centered on four major components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. To complete these objectives, the project requires a full suite of materials, labor, and equipment, including specialized services such as jack and bore, cold planing, SWPPP, AC paving, welding, potholing, and preconstruction video. This solicitation is specifically targeted toward SBA certified HUBZone Small Businesses and Disadvantaged Business Enterprises, with a strong emphasis on partnering with certified DBE, MBE, SBE, WBE, SBRA, and LSAF firms. Interested subcontractors must submit their responses by the deadline of November 19, 2026, at 2:00 PM. Primary points of contact for this effort are Destiny Plummer and Nathan Plummer. All work must be performed in strict accordance with the project bid documents and specifications provided by the Inland Empire Utilities Agency.
Norstar Plumbing and Engineering, Inc

POSTED

about 2 hours ago

DEADLINE

in 1 day

AI Contract Overview

Show more

The Tohopekaliga Water Authority (Toho), a Florida-based independent special district, has issued an Invitation for Bids (IFB) for the construction of the Nolte Road Booster Pump Station project, with a project value estimated between 5 million and 10 million dollars. The project encompasses comprehensive construction activities including site demolition, earthwork, erosion control, and site restoration such as paving, fencing, and pavement markings. It also involves extensive utility work, including the installation of a 16-inch ductile iron water main with associated fittings, valves, and testing procedures. The core of the project is the installation of a pump station featuring two horizontal split case booster pumps with a capacity of 2,500 GPM, along with the necessary piping, connections, and backup systems. Electrical work is a significant component, covering the installation of pump control panels, wiring, conduit, variable frequency drives, and site electrical infrastructure such as lighting, grounding, power distribution, and communication systems. The contract aims to ensure a fully operational booster station capable of supporting the water distribution network. Bidders are invited to respond by October 23, 2025, with the solicitation posted on the Bonfire platform, and the project is located within Florida, with the contract size ranging from 5 to 10 million dollars.

Documents

5
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstifb
High
PDF, High priority: read this firstspecifications
High
PDF, Low priorityother
Low
PDF

Read all 5 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 17 days
  • Lift Station No. 85 ReplacementOpen now, due in 28 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Toho Water Authority
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Tohopekaliga Water Authority (“Toho”), an independent special district established pursuant to Chapter 189, Florida Statutes, by special act of the Florida Legislature, hereby issues this Invitation for Bids (“IFB”) from qualified construction firms with the experience to construct a Booster Pump Station project (the “Project”) all-inclusive of the following: A. Demolition: includes all activities related to the removal and clearance of existing structures and debris to prepare the site for the construction of the Project. B. Earthwork and Erosion Control: involves site preparation and earth moving operations for the construction of the project. This includes clearing and grubbing and installation and maintenance of erosion control best management practices. Additionally, earth moving tasks include import and compaction of fill material necessary to establish finished grade. C. Restoration and Site Work: restoration includes concrete pavements, gravel ground cover, and restoration of any impacted pavement markings, curbing, and/or sidewalks. The work also involves installation of chain link fence around the site with double 8-foot-wide swing gates. D. Site Utilities: involves all work related to the installation of 16” DI pipe with mechanical joints, including pipe restraints for the proposed and existing water main, isolation valves, bends, fittings, line stops, bypassing system, 16” wet taps, flushing, disinfection, and testing. E. Pump Station: involves all work related to the installation of the pump station, including two horizontal split case booster pumps (one main and one backup) with a design capacity of 2,500 GPM, suction and discharge piping and connection to the existing water main. F. Pump Station Electrical: involves all work related to pump panels, wiring, general conduit, junctions and VFDs. G. Site Electrical: involves all work related to the electrical distribution, including pole riser, primary service, electrical backboard, main distribution panel, site lighting, grounding, coordination between the power company to provide power to the site, connection to power and controls, generator receptacle and pole bases. As well as installation of conduit and wire for communication systems.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS