Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

NON-federal / Turnover rehab, flooring? painting, doors, garage, fence.Roof?

Open
174172State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Choctaw Nation Housing Authority is seeking bids for the turnover rehabilitation of a approximately 1,500 square foot, 3-bedroom, 2-bathroom brick home located at 16057 Ward Street in Cameron, Oklahoma. The comprehensive scope of work includes installing waterproof floating vinyl plank flooring, repairing drywall to match existing finishes, and replacing three entry doors, one interior door, and the overhead garage door. Additional requirements involve replacing a vinyl chain-link fence, repairing roof leaks, replacing smoke and carbon monoxide detectors, and performing full interior and exterior painting. The contractor is also responsible for pest control, cabinet repairs, pressure washing, and ensuring the home is move-in ready, including the payment of all utilities and deposits from the start of work until completion. All work must meet or exceed the 2019 International Residential Code (IRC). Prospective contractors are required to visit the project site before bidding, as change orders for conditions identifiable during a site visit will not be approved. Bids must be itemized, include a price good date, and be submitted exclusively through the Housing Bid Board. The project is subject to Davis Bacon labor standards for federally funded projects of $2,000 and above, and the Housing Authority will provide preference in the award to Indian organizations and Indian-Owned economic enterprises. There is no specific set-aside status for this solicitation.

General Info

Bids sought for the comprehensive rehabilitation of a home in Cameron, Oklahoma.

Place of Performance

Cameron, OK, 74932, USA

Set-Aside

NONE

Documents

1
PDF, High priority: read this firstrfq
High

Read the document

Due in 14 days

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 14 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 1 solicitation documentRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
  • Buyer contactEmail and phone
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyOklahoma → Choctaw Nation Housing Authority
Contacts3 people available
OfficeN/A

Full Description

Show more
NON-federal / Turnover rehab, flooring? painting, doors, garage, fence.Roof?
Special Instructions: All prospective contractors are required to visit the project site before submitting a bid. Change orders due to conditions that could have been identified during the site visit will not be considered or approved Home is a 3-bed 2 bath, brick home approx. 1500 sq. ft. shingle roof. Slab on grade. Property manager- Leslie James at Sign up to see this detail. Inspector- Phillip Hotella at Sign up to see this detail. All work done must meet or exceed 2019 IRC. All applicable licenses apply. It is highly recommended contractor view job before biding. Contractor is responsible for all line locates and permits required Contractor will be responsible for cleanup and removal of all waste and repair yard back to mowing condition. Property Manager will select any/all colors used for the job. Contractor is responsible for all measurements, and count of materials needed.
Flooring: Remove existing floor covering throughout home, install new waterproof floating vinyl plank flooring with a minimum 3/16” thick flooring. Pull toilet and install flooring up to the floor flange. Install all new trim required for proper fit and finish. Leslie James will choose color. Remove and reinstall all baseboards.
Drywall: Repair drywall throughout the house; install new ½” drywall, tape, bed, and texture to match the existing finish.
Doors: Remove and replace 3 entry doors. Install 3 pre-hung six-panel insulated metal doors: 2 with peepholes and the one to the garage with spring hinges. Install all trim required for proper fit and finish. Install new combination, keyed-alike hardware, Kwikset or comparable. Caulk and seal inside and out. Paint to match new or existing finishes. Replace 1 damaged interior door. Install new pre-hung interior door matching existing trim and hardware (Kwikset or comparable). Replace all interior door hardware to match existing. Remove and replace the overhead garage door; install a new insulated garage door matching the existing one, including all new track, locks, springs, and a garage door opener. Replace all damaged trim and door seals around the overhead garage door.
Fencing: Replace the missing vinyl chain-link fence with a new 9-gauge fence matching the existing fence on the sides. Replace the wire around the bottom of the fence, including where the existing fence is. Install anchors approx.. 1 ft. apart around the fence. Replace all fence ties around the top of the fence. Replace all missing/damaged posts to be concreted in the ground. Bring in clean topsoil to fill in the holes around the fence and house, and seed all disturbed ground with Rye grass seed.
Special Instructions: Repair the roof leak. Remove the satellite dish and seal around the bracket. Remove and replace all smoke detectors throughout the house; install new smoke/carbon monoxide detectors. Remove and replace all damaged trim and window stools throughout the house; install new ones matching the existing. Replace all damaged gutters and downspouts. Install concrete splash blocks for all downspouts. Remove and replace both toilet seats. Pressure wash the exterior of the home, garage floor, sidewalk, and driveway. Replace the mirrors in the bathrooms; install new ones matching the existing ones. Remove and replace all air registers and the return air grill. Replace all missing window screens. Install new window blinds throughout the house. Install mulch in the flower beds. Remove everything that was left by the previous tenant (shelves on walls). Clean throughout the house, including all windows, ceiling fans, outlets, switches, etc., to be move-in ready when the work is complete. The contractor is responsible for paying all utilities at the home from the start of the work until the final is complete, including all deposits.
Pest Control: Spray the home for bugs before starting the work and after the work is complete.
Cabinets: Replace the missing kitchen cabinet drawers and include new slides. Remove and replace the plywood under the kitchen sink. Sand the kitchen cabinets and repaint; the property manager will choose the color.
Painting: Caulk all cracks in siding, fascia, and around windows. Paint the interior walls, trim, ceiling, and exterior of the home. The property manager will choose all colors.

Similar Contracts

Same NAICS industry code

NAICS: 236118
New
International
Silvera for Seniors - Invitation to Bid - Friendship Manor- Renewal of 3 Suites
Solicitation # SLV-2026-007-A
The Alberta Social Housing Corporation (ASHC) is soliciting bids for the renovation of three suites (113, 218, and 301) at Friendship Manor in Calgary, Alberta. The project requires the work to be completed within a timeframe of 8 to 10 weeks, with the contractor responsible for the proper abatement of asbestos found in drywall compound and flooring. All trade work must comply with applicable codes and bylaws, and specific installations, such as shower slide bars, must be ADA-compliant. The contract term extends from the effective date until twelve months after the completion date, and the contractor is responsible for remedying any defects in materials or workmanship for one year following acceptance. Bidders must be active registered entities under the Business Corporations Act of Alberta and maintain good standing with the Workers' Compensation Board (WCB) of Alberta. Required bid submissions include a work schedule, an OH&S Safety Plan or Certificate of Recognition (COR), and a Certificate of Insurance. For bids exceeding $250,000, a bid bond is mandatory. Additionally, the successful contractor must provide a Performance Bond and a Labour and Material Payment Bond for 50% of the contract price. Payment is structured as a single lump sum without holdback, paid within 28 days of receiving a proper invoice that excludes GST, provided that all work is completed and a WCB letter of clearance is submitted.
Silvera for Seniors

POSTED

about 4 hours ago

DEADLINE

in 21 days
View Details
NAICS: 236118
New
SLED
Request for Proposal (RFP) for the Annual Contract for Minor Home Repair Program
Solicitation # DF1127-03
The City of Beaumont is seeking qualified subrecipients to administer and implement the Minor Home Repair Grant Program, which provides essential home repairs to owner-occupants of single-family housing units within the city limits. This 12-month contract requires subrecipients to demonstrate the capacity to complete at least four projects per quarter, with each eligible household's repairs completed within 30 days of the Grant Agreement execution. Applicants must have experience with federal funding and maintain accounting compliance with 2CFR 200. The program operates as a partnership where the subrecipient manages the program and performs repairs based on a City-approved scope of work, while ensuring all work is performed to code and passes final inspection by the Building Codes Division. Proposals are evaluated based on mandatory requirements, capability and expertise (60 points), and proposed methodology (40 points). Key compliance standards include the Davis-Bacon Act for prevailing wages, Build America Buy America domestic content preferences, and income eligibility calculated using the Part 5 method at 80% AMI. Reimbursement is issued upon the submission of a single invoice for completed projects, supported by proof of expenditure, owner acceptance, building permits, lien releases, and photo evidence. All submissions must be filed electronically via the City's e-bids platform by December 10, 2026.
City Of Beaumont

POSTED

1 day ago

DEADLINE

in 21 days
View Details

More opportunities from Oklahoma → Choctaw Nation Housing Authority

Same awarding agency

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS