This Solicitation opportunity from Illinois was posted on April 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for Bid 26-015: North Central College Riverwalk Park - 430 S. Washington St.: An invitation for bid (IFB) released on April 7, 2026, for the development of a new park at 430 S. Washington Street. The project involves converting a vacant parcel into a park featuring extended low-flow walkways, ADA-compliant accessibility, landscaping, lighting, irrigation, and public seating. Bids must be submitted electronically via OpenGov by April 29, 2026, at 2:00 pm.
PDF
PDF, High priority: read this first2 pages · safety-orientation-checklist
HighAI Summary for City of Naperville Contractor Safety Orientation Checklist: This document is the City of Naperville Contractor Safety Orientation Checklist. It verifies that the City has provided the contractor with required OSHA-related safety information, including hazardous materials handling, emergency response procedures, and site-specific safety rules. The checklist includes sections on hazardous materials training, contractor responsibilities for hazardous substances, and compliance with OSHA regulations. It also requires the contractor to certify that employees working on the project have been trained accordingly. The document is intended to ensure contractor and subcontractor employee safety on City property and includes spaces for signatures and contact information for both the contractor and City project manager.
PDF
PDF, High priority: read this first9 pages · terms-and-conditions
HighAI Summary for City of Naperville Service Terms and Conditions August 28, 2019: This document outlines the City of Naperville's Service Terms and Conditions revised on August 28, 2019. It applies to all purchases of work by or on behalf of the City, detailing acceptance of contract, amendments, patents, compliance with laws, payment terms, warranties, vendor services, termination, and insurance requirements. Key insurance coverages include Commercial General Liability, Automobile Liability, Workers' Compensation, Employers' Liability, and Errors & Omissions Liability. The document governs contractual obligations, payment procedures, and legal compliance for vendors providing goods and services to the City.
PDF
PDF, High priority: read this first11 pages · work-terms-and-conditions
HighAI Summary for City of Naperville Work Terms and Conditions Effective June 10, 2019: This document outlines the Work Terms and Conditions for contracts with the City of Naperville, effective June 10, 2019. It covers key contractual provisions including tax exemption status, amendment and modification procedures, patent and copyright indemnification, compliance with laws, governing law and venue, payment terms, warranty, scope of work, termination rights, and insurance requirements. The insurance section specifies minimum coverage limits and types required, such as Commercial General Liability and Automobile Liability. The document serves as a binding framework for vendors performing work or services for the City, detailing responsibilities, legal compliance, and administrative processes.
DOCX
DOCX, High priority: read this firstspecial-notice
HighAI Summary for DCEO Grant Language - North Central College Riverwalk Park: Notice of Grant Requirements for the City of Naperville regarding the North Central College Riverwalk Park project, funded by DCEO grants #SD250513 and 15-203125. The document outlines mandatory federal and state compliance terms, including the Davis-Bacon Act, Copeland Anti-Kickback Act, Contract Work Hours and Safety Standards Act, and environmental regulations (Clean Air and Water Acts).
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for North Central College Riverwalk Park Bid Schedule: A detailed bid schedule/price list for the North Central College Riverwalk Park project. The document contains IDOT pay items and special provisions (SP) including unit prices and quantities for earthwork, concrete structures, electrical conduit, landscaping, and site furnishings.
XLSX
XLSX, High priority: read this firstspecifications
HighAI Summary for North Central College Riverwalk Park - Engineer's Opinion of Probable Construction Cost: This document is an Engineer's Opinion of Probable Construction Cost for the North Central College Riverwalk Park project for the City of Naperville. It contains a detailed bid schedule featuring IDOT pay items and special provisions (SP), including quantities and units for earthwork, concrete structures, electrical conduit, landscaping, and site improvements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for North Central College Riverwalk Park - Plans (Job No. W25201.00): Technical plan set issued for bid on March 25, 2026, for the North Central College Riverwalk Park project (Job No. W25201.00). The document includes an index of 31 sheets covering civil engineering (grading, erosion control, utilities), electrical, landscape, and structural layouts, as well as a schedule of quantities and site benchmarks.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for North Central College Riverwalk Park - Special Provisions: Special Provisions for the North Central College Riverwalk Park project in Naperville, Illinois. The document outlines technical specifications for park development, including riverbank stabilization, pedestrian connectivity, and monument sign footings. It includes award criteria, pre-qualification requirements, and compliance mandates for Illinois Department of Commerce & Economic Opportunity (DCEO) grant funding, including Buy American preferences.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for North Central Washington Park Combined FSIR/ROR/RAP: Combined Focused Site Investigation Report, Remedial Objectives Report, and Remedial Action Plan for the North Central Washington Park site in Naperville, IL. Prepared by True North Consultants for the City of Naperville, dated January 14, 2026. The document includes site investigation activities, endangerment assessments, and a proposed remedial approach for soil removal.
PDF
PDF, High priority: read this first11 pages · sow
HighAI Summary for Scope of Work (SOW) Guide Revised 22 December 2025: This document is a Scope of Work (SOW) Guide revised on 22 December 2025. It provides comprehensive guidance on drafting a clear, complete, and legally binding scope of work for procurement projects. The guide covers terminology, word choice, and the importance of clarity and completeness in the SOW. It outlines the basic planning steps, the process for outlining the scope of work, and a recommended seven-part format for writing the SOW, including background, scope, technical references, deliverables, progress elements, transmittal, and notes. The guide emphasizes the need for precise definitions, clear objectives, and detailed task descriptions to ensure accurate contractor proposals and effective contract administration.
DOCX
DOCX, Low priority1 page · insurance-certificate
LowAI Summary for Certificate of Liability Insurance: This document is a Certificate of Liability Insurance issued as a matter of information only. It certifies that the policies of insurance listed have been issued to the insured for the policy period indicated. The certificate includes details about the types of insurance coverage such as general liability, automobile liability, umbrella liability, excess liability, and workers compensation and employers liability. It also contains disclaimers that the certificate does not amend or alter the coverage and does not constitute a contract. The document is a standard ACORD 25 form dated 2010-05.
PDF
PDF, Low priority11 pages · contract-document
LowAI Summary for City of Naperville General Terms and Conditions (Effective Jan 1, 2022): City of Naperville general terms and conditions effective January 1, 2022 for purchases of work under city contracts or purchase orders. The document covers tax exemption, amendments, patent/copyright indemnity, non-waiver, compliance with laws, governing law and venue, payment terms, invoicing requirements, warranty, scope of work, conflict of interest, licensing, termination, and insurance requirements including liability limits. It appears to be standard contractual boilerplate rather than a solicitation or amendment.
DOCX
DOCX, Low priority1 page · other
LowAI Summary for HOLD_ACCEPTANCE_SAMPLE.docx: Unreadable document.
The proposed project is an improvement project to the existing Naperville riverwalk to convert the currently vacant parcel at 430 S. Washington Street into a new park. The project will include connecting the new low flow walk along the south bank of the West Branch of the DuPage River from the Washington Street Bridge to the Moser Covered Bridge, approximately 200 ft to the southeast as well as providing a connection to the Washington Street sidewalk, approximately 125 ft to the west. The extended walkways will be designed with barrier free accessibility in accordance with ADA standards. Public gathering spaces that are interconnected will be provided along with landscaping, including a mixture of trees and shrubs, to enhance the new park. Lighting and irrigation improvements will be provided throughout the project. New benches and seat walls will be provided in critical areas throughout the project for public seating.
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.