Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

Kendall Drive, Western Ave, San Bernardino, CA, 92407

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Bernardino County
Contacts3 people available
OfficeN/A
Office AddressN/A
Contacts
Maryn Mineo-WellsPlanner III
Arlene B ChunEngineering Manager
Avery RobinsonEnvironmental Scientist

Interested Companies (1)

Aspen Environmental GroupAgoura Hills, CA

Full Description

Show more
The San Bernardino County Flood Control District proposes to construct the North San Bernardino Channel Project, which would include the construction of an 8-foot-high reinforced concrete rectangular ultimate channel to replace the existing rural, interim channel and three street crossings/culverts, as well as the relocation of various utilities (primarily at the street crossings). While the final design could incorporate a soft bottom, the impact analysis under CEQA conservatively assumes a hard-bottom channel for a worst-case assessment of environmental impacts until the design is finalized. The existing channel was constructed in the 1950s and intended to be a temporary flood control channel designed to provide flood protection for a 25-year storm event upstream and a 10-year storm event downstream. The proposed improvements aim to increase flood protection to a uniform 100-year storm event protection, enhance protection for areas within the 100-year floodplain, and mitigate flooding risks for nearly 300 structures and over 200,000 residents. The Proposed Project is located within the North San Bernardino Channel (formerly known as Devil Creek Channel) north of Kendall Drive, from Western Avenue to Little Mountain Basin (approximately 1 mile), in primarily the City of San Bernardino, San Bernardino County.

More opportunities from California → San Bernardino County

Same awarding agency

NAICS: 237990
New
SLED
Unit 2 Phase 5-2 Liner Construction Project at the San Timoteo Sanitary Landfill
Solicitation # 20261102014
The Unit 2 Phase 5-2 Liner Construction Project at the San Timoteo Sanitary Landfill is a construction solicitation issued by the San Bernardino County Department of Public Works, Solid Waste Management Division. The scope of work involves the installation of Geosynthetic Clay Liners and underlying geomembranes, as well as the provision, calibration, and commissioning of process sensors, monitoring and control devices, and network systems including PLC programming. The project requires a contractor with a State Contractor A License and demonstrated experience in earthwork, geosynthetic membrane installation, and related infrastructure. Bidders must be registered with EPro and submit a comprehensive bid package including specific yellow page forms, non-collusion declarations, and CARB certifications to avoid being deemed non-responsive. Awarding will be based on the lowest responsible bidder, considering general competency, ability to perform the work, and the proposed delivery schedule. The prime contractor must perform at least 50 percent of the work, and any geosynthetics installation subcontractor must have completed at least three landfill projects of ten acres or more. The contract includes strict quality control requirements, including destructive seam testing for geomembranes and NRTL certification for electrical equipment. Payment is processed monthly based on work completed by the 25th of each month, with progress payments made within 30 days of an undisputed application. The contractor is also required to provide a baseline project schedule within 14 days of commencement and maintain comprehensive insurance and bonding, including performance and payment bonds.
Other Heavy and Civil Engineering Construction

POSTED

2 days ago

DEADLINE

in 8 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS