This Solicitation opportunity from Pennsylvania was posted on April 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Contract #530-26-04 is a solicitation issued by the North Wales Water Authority for the Gwynedale Way to Jarvis Lane Water Main Replacement project in Upper Gwynedd Township, Montgomery County, Pennsylvania. The scope of work involves the installation of approximately 195 linear feet of 8-inch ductile iron water main and 143 linear feet of 30-inch HDPE pipe, including all necessary appurtenances and subsequent vegetative restoration along the utility easement. Technical specifications require adherence to OSHA and PennDOT safety standards, with work scheduled to commence around June 8, 2026.
Bids must be submitted electronically via PennBid by May 8, 2026, at 3:00 PM. Each submission must include a certified check or bid bond equal to 10% of the bid price, and bids cannot be withdrawn for sixty days following the opening. This project is classified as Public Works under the Pennsylvania Prevailing Wage Act, requiring the payment of promulgated minimum wage rates to all workmen. The North Wales Water Authority will evaluate awards based on the best interests of the project, considering compliance, bidder qualifications, and financial ability.
HighAI Summary for 02 - Technical Specifications: Technical specifications for a water main installation project. The scope includes installing approximately 195 linear feet of 8-inch ductile iron water main and 143 linear feet of 30-inch HDPE pipe, along with vegetative restoration. The document details work sequences, safety requirements (OSHA compliance), progress cleaning, and contract considerations including the schedule of values and payment application procedures.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 02 - Technical Specifications: Arsenic Filter Treatment System: Technical specifications for the demolition of an existing arsenic treatment system and the installation of a new arsenic filter treatment system, including piping, testing, and disinfection. The document outlines the scope of work, work sequence, safety requirements (including OSHA and PennDOT compliance), and general contractor responsibilities. Work is scheduled to commence on or around June 8, 2026.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 02 - TECH SPECS: Summary of Work: Technical specifications document detailing the scope of work for the installation of a ductile iron water main and meter vault, including pavement and vegetative restoration. The document outlines work sequences, safety requirements conforming to PennDOT and OSHA standards, and general contractor responsibilities. Work is scheduled to commence on or around June 8, 2026.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 02 - TECHSPECS: Summary of Work: Technical specifications document (Section 01 1100) detailing the scope of work for the procurement of a portable generator. The document outlines requirements for installation, electrical connection to existing systems, grounding, site restoration, and safety compliance (including OSHA and PennDOT standards). Work is scheduled to commence on or about March 2, 2026.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 03 - PLAN SET: Technical plan set containing standard pipe bedding details, thrust block orientations (vertical and horizontal), and specific construction notes regarding stream crossing protections, grubbing restrictions, and environmental mitigation requirements.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for 25-06161 Water Tower Square Tank Painting and Repair - Prevailing Wage Determination: Prevailing wage project rates issued by the Bureau of Labor Law Compliance for the North Wales Water Authority project 'Water Tower Square Tank Painting and Repair' (Serial Number 25-06161) in Montgomery Township. The document, dated June 16, 2025, specifies hourly rates and fringe benefits for various labor classifications, including carpenters, electricians, iron workers, and laborers, with effective dates ranging from 2022 to 2026.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 2 - PFAS Treatment Systems for Well 31 and Well 34: Addendum No. 2 to the bidding documents dated September 2026 for the North Wales Water Authority's PFAS Treatment Systems project. This document provides critical revisions to the project manual, including specific technical changes to sections 01 1200, 03 3000, 04 2113, 04 7300, 07 4600, 08 9119, 26 9600, 40 0523, 43 3276, and 44 4315. It also includes deletions and revisions to landscape and construction drawings, a list of replaced sheets, and the minutes from the Pre-Bid Conference held on September 17, 2026.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 3: Issued October 23, 2026, this addendum modifies the original bidding documents dated September 2026. It includes revisions to the project manual regarding completion timelines (365 to 400 days), technical specifications for plywood roof sheathing, insulation, thermostatic mixing valves, and carbon samples. Additionally, it incorporates a list of PennBid Questions and Responses addressing budgets, apprenticeship requirements, permit fees, and electrical scope.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Contract # 520-26-03: Yorkshire Meadows Arsenic Removal - Addendum No. 1: Addendum No. 1 dated May 2026 for the Yorkshire Meadows Arsenic Removal project (Contract # 520-26-03) for the North Wales Water Authority. This document modifies the original April 2026 bidding documents by replacing Section 43 3100 (Arsenic Removal Equipment) with a revised version. The revised specifications detail the requirements for five factory-built arsenic removal systems, including performance requirements (100 gpm design flow), vessel characteristics, quality assurance, and submittal requirements.
PDF
PDF, High priority: read this firstitb
HighAI Summary for Contract #520-26-03: Yorkshire Meadows Arsenic Removal (G-010): Project manual and invitation to bid for the North Wales Water Authority's Yorkshire Meadows Arsenic Removal project (Contract #520-26-03). The project involves the demolition of an existing system and the installation of a new arsenic filtration system in Solebury Township, Bucks County, PA. The document includes the advertisement for bid, instructions to bidders, and a comprehensive table of contents covering bidding requirements, contract forms, and technical specifications. Bids are due by May 7, 2026, via PennBid.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Contract #520-26-03 - Yorkshire Meadows Arsenic Removal Plans: Index of drawings and cover sheet for the Yorkshire Meadows Arsenic Removal project (Contract #520-26-03) for the North Wales Water Authority in Bucks County, PA. Prepared by Carroll Engineering Corporation, the document lists plans including the Cover Sheet, Education Plan, Site Process Plan, and Section Views.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Contract #521-25-02 Addendum No. 1 - Water Tower Square Tank Painting & Improvements: Addendum No. 1 dated July 1, 2025, for the North Wales Water Authority project (Contract #521-25-02). This document modifies the original June 2025 bidding documents by revising excavation requirements and adding detailed specifications for pipe support repair (Section 03 0353). It also includes a public Q&A section addressing safety equipment, logo application, concrete pier repairs, and project timelines.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Contract #521-25-02: Water Tower Square Tank Painting and Improvements Plans: Technical plans and structural notes for the North Wales Water Authority's Water Tower Square Tank Painting and Improvements project (Contract #521-25-02). The document includes an index of drawings (Site Plan, Tank Improvement Plan, and Structural Details), an Act 287 list of underground users, and specific structural requirements regarding the removal of antenna supports and coordination with cellular equipment owners.
PDF
PDF, High priority: read this firstitb
HighAI Summary for Contract #521-25-02: Water Tower Square Tank Painting & Improvements: Project manual and invitation to bid for the North Wales Water Authority regarding painting and improvements to a 1.5 MG Hydropillar water storage tank in Montgomery County, PA. Dated June 2025, the document includes the advertisement for bid, instructions to bidders, and a detailed table of contents for specifications and contract forms. Bids are due by July 3, 2025, via PennBid.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Contract #530-26-04 Addendum No. One - Gwynedale Way - Jarvis Lane Water Main Replacement: Addendum No. One for the Gwynedale Way - Jarvis Lane Water Main Replacement project (Contract #530-26-04), dated May 2026. This document modifies the original bidding documents by replacing Drawings C-101, C-103, and CJ-502 (revised May 6, 2026) and incorporating PennBid Q&A responses. It includes a specific clarification regarding the anticipated award date of May 20, 2026, and a Notice to Proceed around June 10, 2026.
PDF
PDF, High priority: read this firstifb
HighAI Summary for Contract #530-26-04: Gwynedale Way - Jarvis Lane Water Main Replacement: Project Manual and Invitation for Bid (IFB) issued by the North Wales Water Authority in April 2026 for the installation of approximately 195 linear feet of 8-inch ductile iron water main and 143 linear feet of 30-inch HDPE pipe. The document includes the advertisement for bid, instructions to bidders, and a comprehensive table of contents covering bidding requirements, contract forms, and technical specifications for concrete, earthwork, and utilities. Bids are due via PennBid by May 8, 2026.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Contract #570-25-04 Addendum No. 1 - Montgomery Avenue Warehouse Roof Replacement: Issued August 4, 2025, this addendum modifies the July 2025 bidding documents for the North Wales Water Authority's Montgomery Avenue Warehouse Roof Replacement. It includes revisions to specification section 01 3230 regarding preconstruction recording requirements and provides formal responses to four public Q&A inquiries concerning insurance requirements, required documentation, approved EPDM manufacturers, and preconstruction video requirements.
PDF
PDF, High priority: read this firstifb
HighAI Summary for Contract #570-25-04: Montgomery Avenue Warehouse Roof Replacement: Project manual and invitation for bid (IFB) issued in July 2025 for the North Wales Water Authority. The project involves replacing the roof at the Authority warehouse on Montgomery Avenue. The document includes the advertisement for bid, instructions to bidders, and a comprehensive table of contents covering bidding requirements, contract forms, and technical specifications (including asbestos assessment and EPDM roofing). Bids are due by August 8, 2025, via PennBid.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Contract #570-25-04 - Montgomery Avenue Warehouse Roof Replacement Plan Set: Technical drawing set and index for the North Wales Water Authority Montgomery Avenue Warehouse Roof Replacement (G-016), Contract #570-25-04. Prepared by Carroll Engineering Corporation, the document includes a cover sheet and roof plans (S-101).
PDF
PDF, High priority: read this firstitb
HighAI Summary for Contract #572-25-03: 1560 Easton Road Operations Center Emergency Generator: Project manual and invitation to bid (ITB) issued in January 2026 for the North Wales Water Authority. The project involves the furnishing and installation of a natural gas powered emergency generator, foundation pad, automatic transfer switch, and associated distribution equipment at the 1560 Easton Road Operations Center. The document includes the advertisement for bid, instructions to bidders, and a comprehensive table of contents covering bidding requirements, contract forms, and technical specifications across multiple divisions (Electrical, Concrete, Earthwork, etc.). Bids are due by February 5, 2026, via PennBid.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Contract #572-25-03 - Emergency Generator Plan Set: Technical plan set and specifications for the North Wales Water Authority Operations Center Emergency Generator (G-013) project in Warrington Township, PA. Includes an index of 11 drawings covering electrical, mechanical, and civil/erosion control, as well as an Act 287 list of underground utility users and survey notes from August 2024.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Contract #602-26-02 Addendum No. 1 - Bristol Road & Old New Road Meter Vault: Addendum No. 1 dated May 2026 for the North Wales Water Authority project (Contract #602-26-02). This document modifies the original bidding documents by updating the Table of Contents, adding requirements for a Doylestown Township Road Opening Permit, adding Specification Section 40 7000 (Instrumentation for Process Systems), and adding a Chlorine Residual Analyzer detail to the drawings. It also includes a series of Q&A responses from PennBid regarding PennDOT certifications, SCADA component supply, and project timelines.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Contract #602-26-02: Bristol & Old New Road Meter Vault (E-1105N) Plans: Technical plans and specifications for the North Wales Water Authority Meter Vault (E-1105N) project in Doylestown Township, Bucks County, PA. The document includes an Act 287 underground users list, survey notes from May 2025, utility markers, and detailed engineering specifications for standard pipe bedding, thrust blocks, and concrete compressive strength requirements.
PDF
PDF, High priority: read this firstifb
HighAI Summary for Contract #602-26-02: Bristol Road & Old New Road Meter Vault (E-1105N): Project manual and invitation for bid (IFB) issued by the North Wales Water Authority for the supply and installation of a meter vault, including piping and restoration at Bristol Road and Old New Road in Doylestown Township, PA. The document includes the advertisement for bid, instructions to bidders, and a comprehensive table of contents for technical specifications across multiple divisions (Concrete, Electrical, Earthwork, etc.). Bids are due by May 7, 2026, via PennBid.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Home Depot Tank 1,500,000 Gal Fluted Column Tank Evaluation: An internal and external condition assessment report for the 1,500,000 gallon Home Depot Tank (North Wales Water Authority) performed by Mumford-Bjorkman Associates on January 23, 2024. The report details lead testing results, security status, and the condition of the foundation, protective coatings, and structural components. It recommends a full exterior recoating within one to two years due to heavy weathering and provides specific cleaning and painting guidelines.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for North Wales Water Authority PFAS Treatment Systems - Addendum No. 1: Addendum No. 1 for the North Wales Water Authority PFAS Treatment Systems project (Wells 31 and 34). This document modifies the original September 2026 bidding documents, specifically updating the bid submission process to be conducted online via PennBid with a deadline of October 29, 2026, at 10:00 A.M.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for North Wales Water Authority PFAS Treatment Systems (Contracts #520-26-5, 6, 7): Project manual and advertisement for bid issued in September 2026 for the installation of Granular Activated Carbon adsorption/filtration systems at Well 31 and Well 34. The procurement is split into three contracts: General Construction (#520-26-5), Electrical (#520-26-6), and Mechanical (#520-26-7). The document includes a comprehensive table of contents covering bidding requirements, contract forms, and detailed technical specifications across multiple divisions (Concrete, Metals, Electrical, Process Integration, etc.). Bids are due by October 8, 2026, via PennBid.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for North Wales Water Authority - PFAS Treatment Systems Drawings Set: A set of engineering drawings and specifications prepared by Carroll Engineering Corporation for the North Wales Water Authority. The project involves PFAS treatment systems for Well 31 and Well 34, covering general construction (Contract #520-26-5), electrical (Contract #520-26-6), and mechanical (Contract #520-26-7) works in Upper Dublin Township, Montgomery County, PA. The document includes an index of drawings, site plans, and soil legends.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for PFAS Treatment Systems - Technical Specifications (Contracts #520-26-5, 6, 7): Technical specifications for the construction of PFAS Treatment Systems at Well 31 (G-001) and Well 34 (G-002) for the North Wales Water Authority. The document outlines the scope of work for three separate contracts: General Construction (#520-26-5), Electrical (#520-26-6), and Mechanical (#520-26-7). Key deliverables include Granular Activated Carbon filtration systems, filter buildings, site improvements, and associated infrastructure.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Pricing Section BT-17CJ - N. Abbonizio Contractors, Inc.: A detailed pricing schedule/bid tab for project BT-17CJ, featuring a bid from N. Abbonizio Contractors, Inc. The document lists 18 base bid items including site clearing, ductile iron pipe installation, storm sewer work, and erosion controls, with associated quantities and unit prices.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Supplemental Info - Photos: A supplemental document containing photographic references and annotations for equipment removal and replacement, specifically detailing filters, prefilters, sample taps, booster pumps, and the removal of a former chlorine room and associated ductwork.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Water Tower Square - NWWA Tank Drawing (D-039-****): Technical drawing and profile specifications for the Water Tower Square NWWA Tank, identified as drawing number D-039-**** and CAD file MHP-TANK.DWG.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Water Tower Square Plans (1991-1992): Technical schematic plans and specifications for a 1,500,000 gallon elevated water storage tank, dated 1991 and 1992.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Water Tower Square Tank Site - Technical Specifications: Technical specifications for the repair, demolition, and painting of the Water Tower Square Tank Site in Lansdale, PA. The document outlines the scope of work, including lead-based paint removal, sediment disposal, hydrostatic testing, and site restoration, with an anticipated start date of August 1, 2025.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Well 31 PFAS Treatment Facility Geotechnical Report (C250086.00): Geotechnical Investigation and Engineering Report dated July 17, 2025, for the proposed Well 31 PFAS Treatment Facility in Maple Glen, PA. The document provides subsurface soil stratigraphy, groundwater analysis, and foundation recommendations for a filter building, including specific footing dimensions and allowable net bearing pressure.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Well 34 PFAS Treatment Facility Geotechnical Report: Geotechnical Investigation and Engineering Report dated July 17, 2025, for the proposed Well 34 PFAS Treatment Facility in Maple Glen, PA. Prepared by CMT Services Group for Carroll Engineering Corporation, the document provides subsurface soil stratigraphy, groundwater analysis, and foundation recommendations based on six test borings.
PDF
PDF, Low priorityaward
LowAI Summary for Contract # 520-26-03: Yorkshire Meadows Arsenic Removal Bid Results: Bid opening results dated May 7, 2026, for the Yorkshire Meadows Arsenic Removal (G-010) project, Contract # 520-26-03. The document lists DOLI Construction Corporation as a bidder with a bid price of $374,004.00.
PDF
PDF, Low prioritybid-tabulation
LowAI Summary for Contract 521-25-02: Water Tower Square Tank Painting and Improvements Bid Tabulation: Bid tabulation for the North Wales Water Authority's Water Tower Square Tank Painting and Improvements (G-008), Contract #521-25-02. The document certifies the bids received on July 3, 2025, and lists Dynamic Sandblasting and Painting, LLC as a bidder.
PDF
PDF, Low priorityaward
LowAI Summary for Contract # 572-25-03 - Easton Road Operations Center Emergency Generator Bid Results: Bid opening results dated February 5, 2026, for the North Wales Water Authority's Easton Road Operations Center Emergency Generator (G-013) project. The document lists six bidders and their respective bid prices, with ElectraTech Services, LLC as the lowest bidder at $142,770.00.
PDF
PDF, Low priorityother
LowAI Summary for Eagle Project #25-01-35 - Heavy Metals in Soil Sampling Report: Technical report dated April 16, 2025, prepared by Eagle Industrial Hygiene Associates, Inc. for Carroll Engineering Corporation. The document details the collection and analysis of 16 soil samples for heavy metals (lead, arsenic, cadmium, and chromium) at the Home Depot Water Tank site in Lansdale, PA, conducted on March 18, 2025. Results indicate lead concentrations did not exceed EPA criteria (>5,000 ppm), and soil abatement is not recommended.
PDF
PDF, Low prioritybid-results
LowAI Summary for G-016 Montgomery Avenue Warehouse Roof Replacement Bid Results: Bid tabulation for the Montgomery Avenue Warehouse Roof Replacement (G-016) project, dated August 8, 2025. The document lists 11 bids received, including base bid and alternate costs, with O'Donnell Roofing Co. as the lowest bidder at $311,250.00.
PDF
PDF, Low priorityq-and-a
LowAI Summary for North Wales Water Authority - PFAS Treatment Systems Pre-Bid Meeting Minutes: Meeting minutes from the September 17, 2026, pre-bid conference for the PFAS Treatment Systems project at Well 31 and Well 34. The document outlines project scope, identifies three separate contracts (General Construction #520-26-5, Electrical #520-26-6, and Mechanical #520-26-7), and specifies a bid deadline of October 8, 2026. It includes critical details on bidding requirements, prevailing wage compliance, permit responsibilities, and responses to contractor inquiries regarding piping materials and township permit fees.
PDF
PDF, Low priorityother
LowAI Summary for Report of Analysis #090245 - Eagle Project #090245: A laboratory report dated February 24, 2009, from Eagle Industrial Hygiene Associates, Inc. for Carroll Engineering Corporation. The document provides bulk sample analysis results for asbestos using polarized light microscopy (PLM) on roofing materials from a pump station and warehouse, identifying the presence of chrysotile in specific samples.
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
1 update
PhaseAwarded
Posted
Solicitation
Notice updated
Solicitation number changed from North Wales Water Authority, Montgomery County to 233803. The notice description changed.
Awarded
Contract was awarded
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
Ref. #: North Wales Water Authority, Montgomery County The project consists of the installation of approximately 195 linear feet of 8” ductile iron water main, 143 linear feet of 30” HDPE pipe, all appurtenances, and vegetative restoration along the utility easement that extends from Gwynedale Way to Jarvis Lane in Upper Gwynedd Township, Montgomery County, PA. All documents and details are available at PennBid - https://pennbid.bonfirehub.com/portal/ Each bid must be accompanied by a certified check drawn to the order of North Wales Water Authority, or a Bid Bond in favor of North Wales Water Authority in the amount of 10% of the bid price. Said check or bond shall be subject to the conditions provided in the Instructions to Bidders. The work in connection with this project constitutes a Public Works by a Public Body under Pennsylvania Prevailing Wage Act. Bidders are advised that prevailing minimum wage rates, promulgated by the Pennsylvania Secretary of Labor, must be paid to workmen employed on this project. No bid may be withdrawn within sixty (60) days of the date of the bid opening. The North Wales Water Authority reserves the right to reject any and all bids and to waive any bidding informalities.
More opportunities from Pennsylvania → Montgomery County