Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Award Notice opportunity from Kings Lynn Internal Drainage Board was posted on November 25, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

North Wooton Pump and Pre-Cast Concrete Units Supply

Awarded
International
Solicitation #
2026/S 000-111834

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract, awarded to Aquatic Control Engineering Limited for a total value of 333,820 pounds excluding VAT, covers the design, manufacture, fabrication, and delivery of two high-efficiency pumps and pre-cast concrete units for the North Wootton pumping station replacement project. The scope includes the creation of the pump sump, support, and inlet structure, as well as the provision of necessary testing and documentation for the Health and Safety File and Operations and Maintenance Manual. The pumps are designed to operate across a broad range of flow rates with low maintenance requirements and must implement a Best Achievable Eel Protection solution to ensure the safe passage of fish and eels. The procurement was managed by the Water Management Alliance on behalf of the Kings Lynn Internal Drainage Board, with Turner and Townsend serving as advisors. There is no specified set-aside status for this contract.

General Info

Aquatic Control Engineering will provide pumps and concrete units for 333,820 pounds.

Contract Value

$0

NAICS

N/A

Place of Performance

GBR

Set-Aside

NONE

Award Issued Date

Contract End Date

September 15, 2027

Documents

1
PDF, Low priorityaward
Low

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Solicitation requirements

3 mandatory

13 requirements in 3 areas

  • Technical4 · 3 must
    010

    Design and Documentation Requirements

  • Compliance8 · 0 must
    002

    The contract was awarded to AQUATIC CONTROL ENGINEERING…Optional

  • Evaluation1 · 0 must
    001

    The estimated contract period is from 8 December…Should

  • 10 more requirements, each with its source quote

Read every requirement with its source and proposal context.

Read all 13 requirements

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyKings Lynn Internal Drainage Board
Contacts2 people available
OfficeN/A

Full Description

Show more
This procurement covers the design, manufacture, fabrication, providing, supplying and delivery of two pumps and pre-cast concrete units (PCCU) that form the pump sump, support and inlet structure for the new pumping station for the North Wootton pumping station replacement project. The pumps will have high efficiency, low maintenance requirements and will deliver a broad range of flow rates at their design heads. The pumps will provide safe passage for eels and fish and deliver a Best Achievable Eel Protection (BAEP) solution that reduces the killing and injury of fish, improving downstream passage. The requirement is: The design, manufacture, fabrication, providing, supplying and delivery of pumps for North Wootton pumping station. This includes Design, Testing and providing the required information for the Health and Safety File and Operations and Maintenance Manual. The Water Management Alliance (WMA) will oversee this procurement on behalf of the King's Lynn Internal Drainage Board working with Turner & Townsend as advisors.

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS