Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Homeland Security was posted on August 14, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Northwest District Carpet Replacement

Closed
70Z03326QSEAT0055Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238330
New
SLED
Taylor Center - Bresnan Wood Floor Replacement
Solicitation # SRC-MNSU-2027-000651-RFB
Solicitation SRC-MNSU-2027-000651-RFB is a request for bids from the Minnesota State Colleges and Universities System for the replacement of the wood floor at the Taylor Center Bresnan Arena Court at Minnesota State University, Mankato. The scope of work involves the removal and disposal of existing maple flooring, the installation of 25/32” x 2-1/4” 2nd and better grade maple, and the application of a water-based seal and oil modified gloss finish. The selected vendor will also assist in redesigning graphics and game lines and will be responsible for the final cleaning and protection of the entire arena, including the seating area. Any necessary subfloor repairs will be handled on a time and material basis, requiring the vendor to provide an hourly rate in their bid. The project is scheduled to begin on May 17, 2027, with substantial completion by June 28, 2027, and final completion by July 9, 2027. The contract will be awarded to the lowest priced, qualified bidder who meets all technical requirements, timeline constraints, and terms and conditions. Bidders must submit a lump sum total bid and provide required documentation, including an Affidavit of Non-Collusion, an Affirmative Action declaration, and a Supplier Diversity Form. All submissions must be made electronically through the Minnesota State e-procurement system by the deadline of November 12, 2026. Compliance with prevailing wage standards is mandatory for this project.
Minnesota State Colleges and Universities System

POSTED

1 day ago

DEADLINE

in 23 days
NAICS: 238330
New
Federal
USMC Stair Runner Replacement for Home of the Commandant
Solicitation # M0026427RFI002
The Department of Defense, through the Marine Corps, has issued a sources sought announcement under solicitation M0026427RFI002 to conduct market research for the replacement of the stair runner at the Home of the Commandant in Washington D.C. This project requires a custom, like-for-like replacement for three flights of stairs and associated landings, designed to replicate the existing runner's appearance, color, pattern, and texture to maintain the residence's historic architectural character. The scope of work includes field measurements, the provision of material samples for government approval, fabrication of a professional-quality runner with finished edges, and full installation. The project must be completed by April 16, 2027, with work typically performed Monday through Friday from 7:00 AM to 4:00 PM. This opportunity is designated as a total small business set-aside under NAICS code 238330. Interested vendors must demonstrate experience in custom carpet fabrication and professional installation. Key requirements include the use of protective coverings to safeguard historic woodwork and architectural features, the removal of all contractor-generated debris, and compliance with security and access-control protocols at Marine Barracks Washington. Responses must be submitted to Sergeant Jacob Espinosa by 10:00 AM EST on October 22, 2026, and should include the company name, address, phone number, point of contact, CAGE code, company size status, and ownership nationality.
Commander

POSTED

1 day ago

DEADLINE

in 2 days

AI Contract Overview

Show more

The Department of Homeland Security, through the Coast Guard Northwest District, is soliciting proposals for a firm-fixed-price contract to replace flooring at the Command Center RIC in Seattle, Washington. The project involves the removal of existing materials and the installation of approximately 760 square feet of commercial carpet tile and 160 linear feet of cove baseboard. The estimated period of performance is from August 24, 2026, to September 4, 2026, with a final completion deadline of September 29, 2026. This acquisition is a total set-aside for small businesses under NAICS code 238330. A mandatory site visit was required by August 4, 2026, and strict security protocols are in place for the facility, including required escorts and a prohibition on portable electronic devices. Proposals must be submitted by August 17, 2026, at 3:00 PM PST via email to the Contracting Officer, Michelle Myhra. Submissions must consist of a price proposal on SF 1442 with a detailed cost breakdown and a technical proposal not exceeding two pages that outlines the technical approach and project schedule. Award will be granted based on the Lowest Price Technically Acceptable (LPTA) basis to a responsible quoter registered in the System for Award Management.

General Info

Remove flooring, install 760 sq ft carpet tile and 160 ft cove base at USCG Seattle by Sept 4, 2026, firm-fixed price, small business set-aside.

NAICS

238330 - Flooring Contractors

Place of Performance

Seattle, WA, 98174, USA

Set-Aside

SBA

Documents

8

Construction Terms and Conditions FAR and HSAR Clauses Effective 08/07/2025

PDF, High priority: read this firstterms-and-conditions
High

Contract Clauses for Services - Northwest Carpet Replacement

PDF, High priority: read this firstcontract-clauses
High

Service Wage Rates King County WA

PDF, High priority: read this firstwage-determination
High

SOW Carpet Replacement Northwest District Jackson Federal Building

PDF, High priority: read this firstsow
High

SOW Replacement of Carpet at CGDNW RIC Jackson Federal Building

PDF, High priority: read this firstsow
High

Washington King County Construction Wage Rates WA20260108

PDF, High priority: read this firstwage-determination
High

Question and Answers for Solicitation 70Z03326QSEAT0055

PDF, Low priorityq-and-a
Low

Solicitation 70Z03326QSEAT0055 List of Attendees for Site Visit

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Aug 12, 2026 to Aug 17, 2026. The notice description changed.

Notice updated

Response deadline changed from Aug 17, 2026 to Aug 19, 2026. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Base SEATTLE(00033)
Contacts1 person available
OfficeSEATTLE, WA, 98134, USA
Office AddressSEATTLE, WA, 98134, USA

Full Description

Show more

Amendment to Solicitation 2nd Edit:


The amendment to this soliciation is for the following changes:


Updated section 4.3 "Carpet Tiles" and "Cove Base" to define requirements based on questions.


To extend the deadline for proposals to 08/19/2026 3pm (PST) due to the posting of questions.


To add Construction Wage rates, clauses and provisions


All other requirements remain the same.


Amendment to Solicitation:


The amendment to this soliciation is to extend the deadline for proposals to 08/17/2026 3pm (PST) to allow more time for techincal authority to respond to questions.  All other requirements remain the same.



DESCRIPTION OF REQUIREMENT:


The Contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, and supervision necessary to remove old flooring and baseboards, prepare the sub-surface, and install approximately 760 square feet of new commercial carpet tile and 160 linear feet of new cove base board.  Contractor shall provide Coast Guard Northwest District with carpet samples of appropriate pattern/color that can be selected at time of award.


Place of Performance:


USCG Northwest District Command Center RIC


915 2nd Avenue


35th Floor, Room 3544


Seattle, WA. 98174



Period of Performance:


08/24/2026 – 09/04/2026


This is an estimated period of performance and subject to change closer to award.



Classification:


This acquisition is set aside for small business. The NAICS code is 238330 Flooring Contractors. The contract type will be firm fixed price purchase order.



Site Visit and Location:


A site visit shall be mandatory for all interested offerors.  Each offeror is required to visit the site to be able to provide the government with an accurate and competitive proposal.  All interested offerors must arrive no later than five minutes prior to the start time.  To schedule site visit, provide list of attendees via E-mail to Michelle Myhra at Michelle.M.Myhra2@uscg.mil and copy OS1 Morgan Custer at Morgan.D.Custer@uscg.mil no later than 08/04/2026, 12pm (PST) any offers that request after specified date will not be allowed to attend site visit. There will be no more site visits scheduled after date specified.



Site Visit Date: 08/05/2026


Site Visit Start Time: 1000


Site Visit Escort: OS1 Morgan Custer


Location: USCG Northwest District Command Center RIC 915 2nd Avenue 35th Floor, Room 3544 Seattle, WA. 98174



Special Site Visit Access Requirements:


In accordance with Coast Guard Information Management Program instructions contractors shall follow the requirements to gain access to the area


.


  • Contractors shall be always escorted within the space.
  • All portable electronic devices (PEDS) must be left outside of the Command Center.  The Command Security Officer (CSO) shall be notified of any video or photo requests.
  • Escorts will ensure contractors are signed into the visitor log with date and time annotated.
  • Ensure the Command Center is sanitized of all CNSI (i.e.; SIPRNET, hard copy form, discussion, etc.)


Questions:


E-mail all questions regarding to this solicitation shall be submitted in writing to the Contract Officer Michelle Myhra at Michelle.M.Myhra2@uscg.mil with solicitation RFQ number 70Z03326QSEAT00055 in subject line. Questions regarding the statement of work (SOW) will be forwarded to the units technical authority for an accurate response. All responses will be uploaded for an equal and fair solicitation to all interested vendors. No more questions will be answered after 08/10/26, 3pm (PST).



Proposal submission:


Prohibition on Extraneous Material: Do not submit any unnecessary documents, promotional marketing materials, general company history brochures, or generic cover letters. Quotes must contain only the specific information requested below. Extraneous documents will not be evaluated and may be counted against your page limits.



All quotes shall be required to be on SF 1442 with a detailed breakdown of all costs along that have been requested. Submit quotes to the following E-mail Address Michelle.M.Myhra2@uscg.mil with solicitation RFQ number 70Z03326QSEAT0055 in the subject line. Date of offers is due 08/17/26 at 3pm (PST). All offers that are submitted late (by day and time zone) and quotes that do not include a breakdown of cost will not be considered in award determination.



A complete submission shall consist of the following two parts:


Part 1: Price Proposal


  1. A detailed Price Breakdown for the total firm-fixed-price. The Price Breakdown shall not exceed one (1) page. The breakdown must, at a minimum, separate the costs for the following major tasks:
    • Mobilization and Site Prep
    • Itemization List of Materials
    • Installation by Tasks
    • Labor Rate

Part 2: Technical Proposal
The Technical Proposal shall not contain any pricing information. The Technical Proposal shall not exceed two (2) pages in length. It must provide a clear, concise narrative demonstrating the quoter’s understanding of and ability to meet the requirements of the Statement of Work (SOW). The proposal must include:


  1. Technical Approach: A step-by-step description of how the quoter will perform the work, including inspection, repair, and removal or any and all materials. 
  2. Project Schedule: A high-level timeline illustrating the project's major milestones. The schedule must start from the date of the Notice to Award (NTA) and demonstrate that all work, including demobilization and site cleanup, will be completed within the required Period of Performance, with a completion date of September 29, 2026. Milestones should be shown in terms of days from the NTA.


Award:


The Government will evaluate the Technical Proposal on an Acceptable/Unacceptable basis. The award will be given to the lowest priced, responsible quoter, whose quote conforms to all solicitation requirements and is rated 'Acceptable' technically.  If the lowest priced quote is not found to be technically acceptable, the contracting officer will evaluate the next lowest priced quote, and so on. Quotes determined to be incomplete, unreasonable, or unrealistic will not be considered for award. Under FAR 4.1103 prospective contractor shall be registered in System Award Management (SAM) prior to award. Failure for contractors to be registered in SAM shall result in Contracting Officer proceeding with next successful registered offeror. Website: www.sam.gov



More opportunities from Department Of Homeland Security → Base SEATTLE(00033)

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS