Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Virginia was posted on November 7, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Northwich Water Main Replacement

Closed
IFB26000096State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
The Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project in Oakland, California, is a solicitation issued by Garney Pacific, Inc. for the East Bay Municipal Utility District. The scope of work involves extensive infrastructure rehabilitation, including the repair of covered and open concrete structures, the relining or replacement of small and large diameter steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Additional requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to electrical and instrumentation systems, and the replacement of motor control center components. The project also encompasses the modification of sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This opportunity is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). Key deliverables include lead abatement, metals fabrication, painting, coatings, and FRP reinforcing systems. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company. Quotes are due by November 17, 2026.
Garney Pacific, Inc.

POSTED

about 2 hours ago

DEADLINE

in 13 days

Documents

1
PDF, High priority: read this first7 pages · ifb
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 15 days
  • Lift Station No. 85 ReplacementOpen now, due in 26 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVirginia → Chesterfield County
Contacts1 person available
OfficeN/A

More opportunities from Virginia → Chesterfield County

Same awarding agency

NAICS: 562212
New
SLED
Operation & Maintenance of Closed Landfills, Including Landfill Gas & Leachate
Solicitation # 26000290
Chesterfield County, Virginia, is soliciting proposals for the operation and maintenance of three closed landfills: Bon Air, Chester (Carver Heights), and Northern Area. The scope of work includes the management of landfill gas and leachate collection systems, cap and slope maintenance, methane monitoring, and wastewater sampling. The contractor is required to provide a local Landfill Gas Manager capable of arriving on-site within four hours and must respond to emergency slope, seep, or cap repairs within the same timeframe. Additionally, the contractor must supply and maintain a flare and blower system at the Chester Landfill and submit quarterly inspection and performance reports. The contract features an initial twelve-month term with the option for four successive one-year renewals, subject to annual appropriation by the County and School Board. Award selection is based on a best-value approach where price is considered but not the sole factor; the County may award a single contract or multiple contracts if deemed most feasible. For contracts exceeding $500,000, a 100% performance and payment bond is required. Compliance with Virginia Solid Waste Management Regulations and the specific Post Closure Care Plan for each site is mandatory. Payment is preferred via the ePayables program, and all work is subject to on-site inspection with a target of zero defects and a twelve-month warranty period following final acceptance.
Solid Waste Landfill

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 238120
New
SLED
Midlothian Mines Headstock Replacement
Solicitation # IFB27000129
Chesterfield County is soliciting bids for the Midlothian Mines Headstock Replacement, a project to construct a headstock replica at Midlothian Mines Park. The scope of work includes field verification of existing foundations, removing and welding new steel knife plates, fabricating and erecting a new heavy timber headstock with custom steel connection plates, and installing copper flashing. Additionally, the contractor must refurbish and reinstall existing winder wheels and apply specific wood-preservative treatments. All steel components must be hot-dipped galvanized according to ASTM standards, and timber must be kiln-dried Southern Pine with UC5C pressure preservative treatment. The contract will be awarded to the lowest responsive and responsible bidder based on a lump sum bid. Bids are due by December 17, 2026, and must be submitted via hard copy or the County's eProcurement system. A non-mandatory pre-bid conference is scheduled for November 19, 2026. Bidders must provide a bid bond equal to 5% of the total bid price, and if the bid exceeds $500,000, both performance and payment bonds of 100% of the contract price are required. Payment is typically made within 30 days of receiving an accurate invoice, with a 5% retainage applied to monthly estimates. The project is subject to various regulatory compliances, including federal, state, and local environmental and safety regulations, as well as Equal Employment Opportunity requirements.
Structural Steel and Precast Concrete Contractors

POSTED

5 days ago

DEADLINE

in 29 days
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS