Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on January 16, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Notice Of Request For 2024 Lmig Resurfacing Bids

Closed
PE-77074-NONST-2024-000000004State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

Tattnall County is seeking bids for resurfacing and shoulder grading of approximately 8.77 miles of county roads, including Conners Church Rd., Hillside Church Rd., Cox Rd., Homer Waters Rd., Oak Grove Church Rd., East Hencart Rd., and Dasher Family Ln. The project also involves installing six rumble strips at the intersection of John M. Brewton Rd. and Beards Creek Church Rd. The resurfacing will utilize recycled asphalt concrete (12.5mm Superpave GP 2), with a specified application rate of 165 lbs. per square yard, including bituminous material and lime, and will require a tack coat between the existing and new surfaces. Shoulder grading entails clipping and building shoulders to match the pavement, with additional grassing of four inches on shoulders. Traffic striping will include solid white edge lines, solid/skip double yellow lines, and 24-inch stop bars at intersections, using high-build paint per GDOT standards, with temporary tape striping during the transition phase. The contractor must provide low shoulder and warning signs, material pits for shoulder grading, and certify striping materials and placement. Work is to be completed by October 31, 2024, with a 14-day notice to proceed. Bids are open to qualified contractors who must verify compliance with the federal work authorization program (E-Verify), and provide proof of workers' compensation and liability insurance. The project is managed by the Lamar County Board of Commissioners, Georgia, with Dennis Odom as the primary contact. Tattnall County reserves the right to accept or reject any bids, and all submissions are due by February 28, 2024.

Documents

1
PDF, High priority: read this firstrfb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Solicitation number changed from 77074 TATTNALL PE-77074-NONST-2024-000000004 to PE-77074-NONST-2024-000000004.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Lamar County Board of Commissioners
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
Bids are requested for resurfacing and shoulder grading of approximately 8.77 miles/20 ft. wide of county roads. The installation of 6 rumble strips are also included. The roads include Conners Church Rd., Hillside Church Rd., Cox Rd., Homer Waters Rd., Oak Grove Church Rd., East Hencart Rd., and Dasher Family Ln. The rumble strips are to be installed at the intersection of John M. Brewton Rd. and Beards Creek Church Rd. Resurface all roads with 1½¿/165 lbs. per sq.yd. of Recycled ASPH Conc. 12.5mm Super pave GP 2 only, Incl. Bitum Material & H Lime. Apply tack coat between existing surface and topping. Contractor is required to use a shuttle buggy for resurfacing. No Deep Base Patching is required. Shoulder grading to include clipping shoulders prior to resurfacing and building shoulders to match pavement. Grassing to include 4¿ of shoulders. Stripe with solid white line on edge and solid/skip double yellow line in the center with 24¿ stop bars at each intersection. ¿High Build Paint¿ per GDOT specification ¿652 ¿ Painting Traffic Stripe¿ is to be used for striping. Centerline is to be marked with temporary tape striping between resurfacing and final striping. A certification from the striping contractor verifying material and placement specifications will be required. The contractor is responsible for placing low shoulder and advanced warning signs. The contractor will be responsible for providing material pits for shoulder grading. The contractor will be given a 14 day notice to proceed. All work is to be completed by October 31, 2024. Tattnall County reserves the right to accept or reject any or all bids. Contractor must be authorized to use and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, in accordance with the applicable provisions and deadlines established in O.C.G.A. 13-10-91. Contractor must supply their E-Verify number, workers comp and liability insurance verification with their bid.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS