Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on May 20, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Notice of RFP - Prefabricated Wood frame manufacturers

Closed
BC24-445_Scott_ConstructionInternational

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 321992
New
Federal
54--EO14398 CABIN KITS - GLBA
Solicitation # 140P9726Q0067
The contract solicitation 140P9726Q0067, issued by the Alaska Regional Office of the Department of the Interior, seeks two pre-cut cedar cabin kits totaling approximately 376 square feet each for delivery to Glacier Bay National Park in Alaska. The solicitation is a small business set-aside under NAICS code 321992, with a firm fixed-price contract type anticipated. The vendor must supply all above-grade building materials including structural wood components, roofing, flooring, windows, doors, and fasteners, meeting strict engineering requirements such as a 120 psf roof snow load, 112 mph wind speed exposure, and 40 psf floor live load. All materials must be delivered by February 28, 2027, with fabrication drawings and shop submittals requiring prior approval from the National Park Service. The National Park Service will handle foundational work and on-site construction, while the contractor is responsible for providing one-year warranties on components and incorporating manufacturer warranties for windows and doors. Delivery is expected 180 days after award, with no explicit FOB terms defined. Contract compliance encompasses a broad range of regulatory obligations, including adherence to Buy American and Trade Agreements Act requirements for country of origin labeling and domestic content thresholds, mandatory use of the Invoice Processing Platform for electronic invoicing, and compliance with multiple FAR clauses addressing supply chain security, labor standards, and ethical conduct. Prohibited items include equipment from Kaspersky Lab, ByteDance applications, and covered telecommunications products from specified foreign entities, with additional restrictions on inverted domestic corporations and certain subcontracting practices. The contractor must maintain a code of ethics, protect whistleblower rights, provide accelerated payments to small business subcontractors, and comply with employment verification and minimum wage requirements under Executive Orders. Offerors must submit a complete package via email to Ronald Bunch at ronald_bunch@nps.gov by August 26, 2026, including signed SF-1449, price schedules, cabin drawings, and three examples of previously delivered similar kits with customer references. Evaluation will be based on technical capability, past performance, and fair and reasonable pricing under a best value trade-off basis, with no formal weightings assigned. All representations and certifications must be submitted through the System for Award Management, including valid UEI and CAGE codes, and small business status documentation.
Alaska Regional OFFICE(97000)

POSTED

about 6 hours ago

DEADLINE

in 5 days

AI Contract Overview

Show more

Scott Construction Ltd. is seeking proposals from prefabricated wood-frame manufacturers to provide design-assist services for the Metro Vancouver Housing Corporation’s new housing project at Old Dollarton & Riverside in North Vancouver. The project will consist of a six-story wood-frame residential building built atop a single-level underground parking garage, featuring an estimated 78 to 90 dwelling units, approximately half of which will be family-sized units with two or three bedrooms, and 11% designated as accessible units. As a pilot initiative under the Digitally Accelerated Standardized Housing program supported by CMHC, the project emphasizes advanced construction methodologies including comprehensive BIM modeling, use of a prefabrication configurator, and integration of standardized, off-site fabricated components. Scott Construction intends to enter into a preconstruction agreement with one qualified proponent to support both the design and construction phases, ensuring efficient implementation of prefabrication strategies to enhance speed, quality, and cost-effectiveness. Proposals are due by June 10, 2026, under solicitation number BC24-445_Scott_Construction, with all submissions directed through the specified government procurement portal and coordinated by Metro Vancouver’s primary contracting authority.

General Info

Scott Construction seeks prefabricated wood-frame design-assist proposals for 78-90 unit North Vancouver housing.

Agency

Government of Canada → Greater Vancouver Regional District (Metro Vancouver)

NAICS

321992 - Prefabricated Wood Building ManufacturingView NAICS

Place of Performance

CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Greater Vancouver Regional District (Metro Vancouver)
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Greater Vancouver Regional District (Metro Vancouver)
Office AddressN/A
Contacts
Metro VancouverContracting Authority

Full Description

Show more
PURPOSE Acting as the Construction Manager for the owner, Metro Vancouver Housing Corporation (MVHC), Scott Construction Ltd. (Scott Construction) (SCL) invites Subcontractors to submit a proposal for design-assist services from prefabricated wood-frame manufacturers for the MVHC project at Old Dollarton & Riverside, North Vancouver. The services are described in the Scope of Work section of this RFP. Scott intends to enter into a preconstruction agreement with one proponent. BACKGROUNDThe project is to be a 6-storey wood frame construction building over a single level of underground parking garage. The number of dwelling units are estimated to be 78 - 90 units with a approximately 50% of the dwelling units provided as family units (2bdrm and 3-bdrm) and 11% of the dwelling units provided as accessible units. The project has been identified as an implementation pilot (partial) to support the Digitally Accelerated Standardized Housing (DASH) submission for CMHC’s Housing Supply Challenge. The construction team is expected to support the project during design and construction in implementation of key aspects such as: comprehensive BIM modelling, support for prefabrication configurator, utilizing pre-fabricated components. Further information on DASH can be found at www.acceleratedhousing.ca