Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Pre-Solicitation opportunity from Department Of Defense was posted on July 21, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

NPTU Charleston Fiber Network Testing

Closed
FA441826FIBERFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
SLED
Existing Generators Replacement Aguadilla, PR
Solicitation # 872298
This project involves the complete replacement of two existing power generators at the Aguadilla Detention Facility in Aguadilla, Puerto Rico. The scope of work requires the installation of one 100 kW and one 150 kW Perkins diesel generator, both featuring stainless-steel enclosures to protect against salt air and moisture. The installation includes two new NEMA 3R automatic transfer switches, securing the units to the existing concrete slab with Grade 5 or higher galvanized anchor bolts, and performing comprehensive generator load tests. The project is estimated to have a magnitude between $250,000 and $300,000, with a total period of performance of 270 calendar days from the Notice to Proceed. The contract is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) IDIQ. Award will be based solely on the lowest total evaluated price, provided the offeror demonstrates technical understanding, a sound implementation approach, and a robust safety and quality control program. Key compliance requirements include adherence to the Buy American Act, Davis-Bacon prevailing wage rates per determination PR20260001, and strict security protocols, including PIV card issuance and non-disclosure agreements for personnel. All work must be performed during regular business hours, Monday through Friday, and must comply with NFPA 70, the International Building Code, and NEC Article 445.
Bristol Alliance of Companies

POSTED

about 7 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
SLED
LED Lighting and Occupancy Sensor Upgrades DRAFT
Solicitation # 872291
The LED Lighting and Occupancy Sensor Upgrade project is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) for the Buffalo Federal Detention Facility in Batavia, New York. The project involves providing all engineering, labor, equipment, and materials to upgrade the facility with energy-efficient LED lighting fixtures and occupancy sensors, including the removal and disposal of existing fluorescent fixtures, lamps, and ballasts. The estimated magnitude of the contract is between 2 million and 2.3 million dollars, with a period of performance of 180 calendar days from the notice to proceed. Award will be based solely on the lowest total evaluated price. The contractor is required to adhere to Davis-Bacon Act wage determinations and comply with standards from OSHA, ADA, NFPA, and the International Building Code. Key deliverables include a Quality Control Plan due within 15 days of award, a site survey within 30 days, and a final closeout package consisting of as-built drawings, warranty documentation, and 5 percent attic stock. The contractor must also provide a minimum two-hour training session for facility maintenance personnel and a detailed commissioning report verifying that 100 percent of fixtures and controls were tested. Payment requests must be submitted electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 7 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
SLED
Conex Offices for Forensics Personnel - St. Thomas
Solicitation # 872300
This project involves a Firm-Fixed-Price task order under an 8(a) Multiple Award Construction Contract for the provision and installation of two 40ft steel FLEXTAINER conex offices for forensics personnel at the St. Thomas HSI Facility in the US Virgin Islands. The scope of work includes the construction of 3k PSI reinforced concrete slabs, installation of the units, and equipping each office with two split-system A/C units, R-11 insulation, vinyl flooring, LED lighting, and a steel door with a Cypher lock. Each unit must also include four security windows and a 5-pound ABC fire extinguisher. Electrical connectivity must be established via 2-inch PVC or uPVC conduit to the nearest circuit. The contract has an estimated magnitude between 250,000 and 300,000 dollars, with a period of performance of 364 calendar days from the Notice to Proceed. Award will be based on the lowest total evaluated price, considering technical approach, safety, and quality control plans. Key requirements include compliance with the Buy American Act, adherence to Davis-Bacon prevailing wage rates for the Virgin Islands, and strict security protocols, including the signing of DHS Non-Disclosure Agreements and mandatory cybersecurity training. Contractors must conduct a site survey prior to proposal submission and provide a detailed project schedule within 15 days of the Notice to Proceed. All invoicing must be processed through the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 7 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
IE JCC Fire Alarm Repairs
Solicitation # Inland Empire Fire Alarm Deficiencies (169706,169708,169733,169736 & 16937)
Management & Training Corporation (MTC), operator of the Inland Empire Job Corps Center in San Bernardino, California, is soliciting subcontractor bids for a fixed-price, single lump sum contract to address fire alarm deficiencies. The scope of work includes the installation of manual pull stations, horn/strobe notification appliances, and the replacement of six existing fire alarm bells with new horn/strobe units. All new devices must be integrated into the existing fire alarm system and undergo complete functional testing. The project must be completed within 90 consecutive business days following a written Notice to Proceed, with work beginning within five business days of an agreed-upon start date. Bids are due by 3:00 pm PT on September 16, 2026. Submissions must include the MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, a completed MTC Supplier Packet (W-9, self-certification, and terms acceptance), and proof of insurance. For bids equal to or greater than $25,000, a bid bond guarantee of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds totaling 100% of the contract price. The contract is subject to Construction Wage Rate Requirements (CWRR), requiring compliance with California prevailing wage determinations and the submission of weekly certified payroll. Award will be based on overall best value.
Inland Empire Job Corps

POSTED

about 7 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The 628th Contracting Squadron at Joint Base Charleston, South Carolina, is soliciting bids for a fiber network assessment at the Naval Prototype Training Unit (NPTU) Charleston under solicitation number FA441826FIBER, with responses due by August 5, 2026. This procurement is structured as a firm-fixed-price contract and is set aside entirely for small businesses, with the NAICS code 238210 and a size standard of $19 million in annual receipts. All offerors must be registered in the System for Award Management (SAM) and hold a valid Unique Entity ID to be eligible. The scope of work requires comprehensive fiber optic infrastructure evaluation, including cleaning and inspecting all connector end-faces per IEC 61300-3-35, conducting bi-directional insertion loss testing at 1310 nm and 1550 nm wavelengths in accordance with TIA-568.3-D, and performing OTDR diagnostics on faulty or anomalous strands. Testing will span multiple facility locations including Buildings 2701, 2711, 2314, and 2626, with critical focus on camera and access control fiber runs terminating at Building 2701, Room 153, as well as junction points at North Pier, South Pier, and North Gate. All labeling must comply with TIA-606-C standards, and any non-compliance must be documented and reported. Deliverables include a comprehensive assessment report with executive summary and prioritized remediation recommendations, digital OLTS test results organized by cable run, and archived OTDR trace files, all submitted in PDF and Excel formats. Work must be executed on-site under strict security protocols: contractors must submit advance visit requests five business days prior to arrival, with ten days required for access to controlled areas, and are prohibited from bringing personal electronic devices onto the installation. Daily coordination with the Site Work Controls Officer is mandatory, along with submission of a detailed Plan of Action ten days before work begins, covering safety, energy isolation, and environmental protection. Operations must cease 72 hours before forecasted storms, and emergency incidents require immediate notification to NPTU Security. The facility is governed as a Naval Reactors activity under Executive Order 12344, imposing heightened compliance and safety standards. No contract value has been disclosed, and while the evaluation methodology is unspecified, proposals must align

General Info

Fiber network assessment at NPTU Charleston for small businesses, due August 5, 2026, with strict security and compliance requirements.

Agency

Department Of Defense → FA4418 628 Cons PkView Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

Charleston AFB, SC, 29404, USA

Set-Aside

SBA

Documents

(3)

Fiber Strand Count Infrastructure Cable Data

XLSXother

Contractor Special Conditions for NPTU Charleston Work Site

PDFspecial-notice

Fiber Infrastructure Assessment Statement of Work

DOCXsow

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Presolicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA4418 628 Cons Pk
Contacts2 people available
OfficeJOINT BASE CHARLESTON, SC, 29404-5021, USA
Organization / Agency
Department Of Defense → FA4418 628 Cons Pk
View Agency Profile
Office AddressJOINT BASE CHARLESTON, SC, 29404-5021, USA

Full Description

Show more

The 628th Contracting Squadron at Joint Base Charleston, South Carolina, intends to award a contract for a Fiber Network assessment at NPTU Charleston. The prospective contractor shall provide all management, tools, equipment, and labor necessary to perform cleaning, inspection, and testing in accordance with the attached statement of work. Details on the amount of work to be performed can be found in the Fiber Count Excel document.


This contract action is being considered for a competitive 100 percent set-aside for Small Business concerns.


A firm-fixed priced contract is contemplated.


The applicable NAICS code is 238210 with a small business size standard of $19,000,000.00.


All prospective contractors must be registered in the System for Award Management (SAM) (www.sam.gov) in order to be eligible for award.


More opportunities from Department Of Defense → FA4418 628 Cons Pk

Same awarding agency

NAICS: 236220
Federal
NPTU Ship Store Conversion B2711
Solicitation # DKGV1161806
Solicitation DKGV1161806 is a total small business set-aside for a single firm-fixed-price contract to perform renovations and conversions of rooms 110, 111, and 112 in Building 2711 at the Naval Nuclear Power Training Unit (NPTU), Joint Base Charleston Weapons Station in Goose Creek, South Carolina. The project aims to establish a Ship Store and Uniform Issuance space. The scope of work includes the demolition and removal of rooftop equipment such as Exhaust Fan 203, Exhaust Hood 104, and Make-Up Air Unit 202, as well as electrical modifications, framing new doorways, installing drywall, replacing ceiling tiles, and painting. Key installations include a Corian Lava Rock countertop with a microwave station, a lockable retractable roll-up cage, wire shelving, a new exterior display case, and updated fire sprinkler coverage. The contractor is responsible for providing all labor, materials, and equipment, ensuring compliance with the International Building, Mechanical, and Plumbing Codes, the National Electrical and Fire Codes, Unified Federal Criteria, and Unified Facilities Guide Specifications. Deliverables include warranties, as-built record drawings, and operation and maintenance manuals. Site-specific security requirements are stringent, prohibiting personal electronic devices, cameras, and laptops within the NPTU security enclosure. The anticipated award date is no later than September 30, 2026, with a response deadline of September 16, 2026. All work must adhere to OSHA safety regulations and the Toxic Substances Control Act of 1976, though asbestos and lead surveys are not required for this project.
Commercial and Institutional Building Construction

POSTED

11 days ago

DEADLINE

in 4 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS