This Sources Sought opportunity from Department Of Energy was posted on April 11, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

NREL Flatirons Campus (FC) Water System

Closed
SSN-2023-23045Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
IEUA RMPU Basin Improvements Project Montclair Basin Improvements
Solicitation # ieua-rmpu-basin-improvements-project-montclair-basin-improvements
The IEUA RMPU Basin Improvements Project involves construction improvements at Montclair Basin 2 and 3 in Chino, California. The primary objective is to divert available storm flows from the San Antonio Creek Channel into existing basins to facilitate groundwater recharge. The scope of work is comprehensive, requiring all materials, labor, tools, equipment, and incidentals necessary to furnish, install, commission, and deliver a fully functional system. Key activities include civil and site work such as grading, demolition, saw cutting, cold planing, and trucking, as well as the installation of concrete pipes, concrete structures, and fabricated pipe and fittings. Additional requirements include traffic control, SWPPP implementation, construction surveys, and preconstruction video services. Norstar Plumbing and Engineering, Inc. is acting as the prime contractor and is actively seeking certified DBE, MBE, SBE, and WBE subcontractors and suppliers to support various specialty trades. The project falls under NAICS code 237110. Interested parties must submit their bids by October 29, 2026, at 2:00 PM. Detailed plans and specifications for the project are available through the Inland Empire Utilities Agency bidding portal. Primary points of contact for this solicitation are Nathan Plummer and Destiny Plummer.
Norstar Plumbing and Engineering, Inc

POSTED

about 3 hours ago

DEADLINE

in 5 days
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves critical infrastructure work for the City of Belmont in North Carolina. The scope of work includes the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key station improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also encompasses the installation of new gravity sewers, manholes, and ancillary site improvements such as stormwater facilities, fencing, and a generator. The estimated project value is 16,690,000 dollars. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a performance period of 560 calendar days following the Notice to Proceed. Bidders must meet specific socioeconomic goals, including an EPA MBE goal of 10.9 percent and a combined State of North Carolina MBE/WBE goal of 10 percent. Required submittals include a signed bid form, bid bond, and evidence of authority to sign. The successful contractor must provide performance and payment bonds per EJCDC standards and proof of insurance. Payments are processed monthly via applications for payment submitted to the engineer, with payment due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 17 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from DBE, MBE, WBE, and SBE subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including resurfacing, restoration, and the use of FRP reinforcing systems. Technical requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, pipe supports, valves, and piping appurtenances, as well as the installation and operation of a temporary 11 MGD pumped bypass. Additional tasks encompass the rehabilitation of reactor mixers and aerators, improvements to electrical and instrumentation systems, replacement of motor control center components, modifications to sluice and slide gates, installation of access platforms, rerouting sump pump discharge lines, excavation, trench work, and surveying. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. All subcontractors are strictly required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with Garney reimbursing the bond premium. Quotes, which must include the subcontractor's bond rate and any redlines to standard subcontract forms, are due by November 17, 2026, at 2:00 PM PT, ahead of the November 18, 2026, bid date. Requested supplies and services specifically include lead abatement, rebar, metals fabrication, painting and coatings, electrical and instrumentation, trucking and hauling, and access hatches.
Garney Pacific, Inc.

POSTED

about 3 hours ago

DEADLINE

in 25 days

General Info

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

Arvada, CO, 80007, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Alliance Sustainable Enrgy-Doecontr
Contacts2 people available
OfficeGolden, CO, 80402, USA
Office AddressGolden, CO, 80402, USA
Contacts
Randy Fransua Senior Subcontract Administrator

Full Description

Show more
Introduction: The National Renewable Energy Laboratory (NREL) is the U.S. Department of Energy's primary national laboratory for renewable energy and energy efficiency research and development. NREL develops renewable energy and energy efficiency technologies and practices, advances related to science and engineering, and transfers knowledge and innovations to address the nation's energy and environmental goals. The campus is managed by the Alliance for Sustainable Energy, LLC. The Alliance for Sustainable Energy, LLC (hereinafter called - Alliance) has entered into Contract with the Department of Energy (hereinafter called "DOE"), an agency of the U.S. Government (hereinafter called "Government"), for the management and operation of the National Renewable Energy Laboratory (hereinafter called - NREL). All references to "NREL" in this Sources Sought shall mean the Alliance for Sustainable Energy, LLC. Background The NREL Flatirons Campus (FC) Water System project will provide onsite potable water and fire suppression water facilities to support the planned growth of the research facilities at the site. The scope of the project will be to construct a raw water line, a building containing a potable water treatment system and fire suppression water storage tanks. The project will construct approximately 3 miles of new raw water line from Francis Smart Reservoir across the wildlife refuge north to two 275,00 gallon fire water storage tanks and a water treatment system located on the FC. The project also includes submerged intake pipes and a pump house at Francis Smart Reservoir. Qualification/Submission Requirements: The Subcontractor shall provide examples (Qty.: 3 Min.; 5 Max.) as well as past performance within last 3 years of successfully completed projects in civil and water supply line construction (not-to-exceed 20 pages). NREL is seeking information from the Subcontractor that demonstrates the Subcontractor's capability to manage lower-tier subcontractors with regards to safety, security, schedule, cost and administrative requirements. In addition to the above, the Subcontractor is encouraged to provide project experience working with state or federal agencies. Please provided details on your socio-economic status. Subcontractors within a 90-mile radius to NREL is preferred. Location: Arvada, Colorado 80007.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS