Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Energy was posted on April 16, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

NREL Minor Construction Roofing Repairs

Closed
AGR-2024-24116Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center in Glynco, Georgia, is a single firm fixed price construction effort focused on the comprehensive interior modernization of training facilities. The scope of work includes replacing corridor and classroom flooring with composite modular materials, fully renovating restrooms by replacing vanities and lavatories, and updating interior surfaces with new paint. Technical upgrades involve installing raised flooring and electrical distribution systems, implementing simple dimming controls, replacing lamps, ballasts, and ceiling fans, and replacing variable air volume systems to improve HVAC efficiency. The project also requires the installation of new signage and the correction of plumbing deficiencies. The performance period is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the Notice to Proceed. Award will be determined using a best suited negotiate methodology, evaluating price reasonableness alongside past performance and corporate relevant experience. The successful contractor must provide performance and payment bonds equal to 100 percent of the contract price and adhere to strict regulatory standards, including ADA accessibility guidelines, Buy American requirements, and Davis-Bacon wage determinations. Proposals must be submitted electronically in PDF and Excel formats to the contracting officer by the specified deadline.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 16 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 involves the comprehensive repair and modernization of the Auto Maintenance Facility, Building 575, located at MCB Camp Lejeune, North Carolina. The project scope is divided into two primary exhibit line items: the renovation of Building 575 and the removal and replacement of paving. The renovation includes selective demolition, building envelope and roofing repairs, interior reconfiguration, and the installation of updated HVAC, exhaust extraction, compressed air, and NFPA-compliant fire suppression systems. Additionally, the work encompasses electrical distribution, lighting, low-voltage systems, building automation controls, and site improvements including drainage, water, sanitary, and storm system repairs, as well as hazardous materials abatement. The estimated contract value ranges between 10 million and 25 million dollars. The contract is governed by several federal regulations, including the Davis-Bacon Act, the Buy American Act, and ADA accessibility guidelines. Key administrative requirements include the use of Wide Area Work Flow for monthly invoicing and the submission of a final release and sea transportation certification per DFARS 252.247.7023. Quality assurance is managed through a QC Manager who must certify that all work complies with contract drawings and specifications. Depending on the final proposal value, contractors may be required to provide bid, payment, and performance bonds, with bid bonds set at 20 percent of the proposal amount. Technical standards for the project include MIL-STD-101 for piping identification and IESNA LM-79 and LM-80 for LED lighting testing.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 23, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to DBE Good Faith Effort (GFE) requirements to secure project financing. Bidders must provide proof of posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must demonstrate the utilization of the Small Business Administration (SBA) and the Minority Business Development Agency (MBDA). Failure to include proof of these specific efforts within the bid package will result in the proposal being deemed non-responsive. Documentation of general DBE outreach, such as emails and call logs, may be submitted up to three business days after the bid closing date.
RT CONTRACTOR CORP

POSTED

about 4 hours ago

DEADLINE

in 11 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is seeking pricing for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility, along with an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, standing-seam roofing, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Bids are requested across a wide range of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 4 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge and requires the restoration of the first, second, and third floors to their original condition. The scope of work includes drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring replacement with rubber wall base installation, and electrical repairs along with vanity and cabinet replacement. The total period of performance is 105 days, consisting of 90 days for substantial completion and 15 days for final completion. This is an SBA set-aside opportunity open to Small Businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Award will be based on Best Value, evaluated on a 100-point scale covering price (60), quality (20), past performance (10), and schedule (10). Prospective bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Required documentation includes a detailed cost breakdown, a timeline for substantial completion, a 90-day bid guarantee, a valid Massachusetts Contractor's License, and certification of conformity with local wage rate decisions. The contract is subject to the Davis-Bacon Act, requiring a minimum wage of 13.65 per hour and specific paid sick leave accruals. Contractors must comply with NFPA-101 Life Safety Code, ADA, OSHA, and EPA regulations. Insurance requirements include automobile liability coverage of 200,000 per person and 500,000 per occurrence, with Adams and Associates, Inc. named as an additional insured. Payment terms are Net 30, and the contractor must provide a one-year guarantee of workmanship and applicable manufacturer warranties.
Grafton Job Corps

POSTED

about 4 hours ago

DEADLINE

in 24 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation issued by J & J Contractors, Inc. seeks pricing for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. The project has a duration of 1828 calendar days and involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes comprehensive site work such as clearing, rock excavation, and wetland mitigation, as well as the construction of an Ordnance Operations building, a Truck Inspection area, and a Sentry building. Demolition requirements include the removal of 18 existing magazines and buildings 524 and 393. Technical requirements encompass a wide range of trades, including structural steel, concrete with rigid inclusions and load transfer mats, roofing, electrical utilities, and specialized systems like intrusion detection and lightning protection. The project also requires the installation of overhead cranes, primary and secondary electrical distribution, and various paving and landscaping improvements. This opportunity is set aside for small businesses, including SDB, WOSB, HUBZone, and VOSB certifications. Interested parties must contact the primary point of contact by the response deadline of October 31, 2026, to receive bid invitations and documents.
J & J Contractors, Inc

POSTED

about 4 hours ago

DEADLINE

in 7 days

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Golden, CO, 80401, USA

Set-Aside

NONE

Documents

13

Amendment 1 to RFP-2024-24116: Minor Construction Roofing Repairs

PDF, High priority: read this firstamendment
High

Construction Environment, Safety, & Health Manual (Version 8)

PDF, High priority: read this first121 pages · specifications
High

Exhibit B - Site Locations

XLSX, High priority: read this first30 pages · specifications
High

Exhibit E - Offsite Waste Material Disposition Log

XLSX, High priority: read this first1 page · specifications
High

NREL ESH Risk Evaluation Form

PDF, High priority: read this firstpast-performance
High

NREL Minor Construction Roofing Repairs SOW

PDF, High priority: read this firstsow
High

NREL Subcontractor Quality Assurance Plan Guidance

PDF, High priority: read this firstspecifications
High

NREL Temporary Traffic Control Manual

PDF, High priority: read this firstspecifications
High

RFP AGR-2024-24116: Minor Construction Roofing Repairs – Work Ordering Agreement

PDF, High priority: read this firstrfp
High

RFP AGR-2024-24116 Q&A - Minor Construction Roofing Repairs

PDF, High priority: read this firstq-and-a
High

Wage Determination CO20240023 Rev1

PDF, High priority: read this firstwage-determination
High

Work Ordering Agreement - Construction (AGR-2024-24116)

PDF, High priority: read this firstcontract-document
High

Work Ordering Agreement - Fully Burdened Labor Rate Proposal

XLSX, High priority: read this first3 pages · bid-schedule
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Apr 19, 2024 to Apr 26, 2024. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Alliance Sustainable Enrgy-Doecontr
Contacts1 person available
OfficeGolden, CO, 80402, USA
Office AddressGolden, CO, 80402, USA

Full Description

Show more
NREL is seeking minor construction services (Amended). NREL intends to award up to 1 Work Ordering Agreement under which individual work orders will be issued for construction generally involving roof work and roofing repairs. This will provide a method to complete minor construction work on NREL facilities that range between $2,000 and $100,000 per project in various disciplines in an efficient and cost-effective manner. The scope shall also include minor construction services required to support NRELs mission, research operations and continued facility functionality in accordance with Attachment 1 - Appendix A - Statement of Work; such as: Existing facility modifications, retrofits, additions, changes, alterations, and safety improvements. All construction services scope will be specified in each individual work order. Ancillary services shall be included, as required, for permitting including architectural, civil, structural, mechanical and construction documents as needed to complete the work effort. The use of safe construction methods and materials, equipment, and labor necessary to complete the work effort is required.. The selection of awardee will be based on a Best Value method as described in the attached RFP document. Important Dates (Amended): Proposal Due: 4/26/2024 at 5:00 p.m. Mountain Time (Amendment 1) Technical Questions Due: 4/2/2024 no later than 5:00 p.m. Mountain Time See the attached Amendment 1 for other details.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS