Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Alberta Electric System Operator and EPCOR Distribution and Transmission Inc. are seeking a qualified consultant to conduct a distribution and transmission study to address forecast load growth and distribution deficiencies in the Chappelle area of South-West Edmonton. Because current capacities downstream of the Summerside and Riverview substations are expected to be exceeded within five years, the selected proponent must evaluate various alternatives based on viability, constructability, cost, environmental impact, land use, and associated risks. The final deliverable will be a detailed report featuring comparative metrics to help determine the preferred project alternative. This solicitation, issued by EPCOR Canada under solicitation number 203682, has a response deadline of December 3, 2026. The successful proponent may be granted the first right of refusal for additional services regarding conceptual routing and siting projects during the agreement term. While the owner may negotiate scope, schedule, and pricing with the chosen consultant, they maintain the discretion to seek services from other qualified parties.

General Info

Consultant needed for Chappelle area power study; responses due by December 3, 2026.

Place of Performance

CAN

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyEPCOR Canada
ContactsNo contacts available
OfficeCAN
Organization / AgencyEPCOR Canada
Office AddressCAN
ContactsNo contact information available

Full Description

Show more
The intent of this NRFP is to find a Successful Proponent capable of providing the Work described immediately below. A more detailed description of the Work can be found in Appendix 1 (Information).The Alberta Electric System Operator (“AESO”) and EPCOR Distribution and Transmission Inc. (“EDTI”) are assessing solutions to address forecast distribution deficiency in the Chappelle area of South-West Edmonton. Forecast load growth in the area, presently serviced by EDTI’s distribution system downstream of the Summerside and Riverview substations, is forecast to exceed available capacities over the next 5 years. The successful Proponent (the Consultant) will be required to assess, evaluate and compare the viability, constructability, costs, environment and land use effects, and risks associated with each of the alternatives under consideration. The Consultant is required to produce a report detailing their findings for all the Alternatives, including comparative metrics, which will be used as an input to the AESO’s determination of the preferred alternative for the project.The successful Proponent may be granted the first right of refusal to provide additional services related to conceptual routing and siting projects during the term of the Agreement. The Owner may, at its sole discretion, enter negotiations with the successful Proponent to define the scope, schedule and pricing for the required services. The Owner reserves the right to seek the services from other qualified parties at their sole discretion.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
Western Placerville Interchanges Phase 2.3 - Design & Env RFP Final Complete
Solicitation # 20261113026
The City of Placerville is soliciting proposals from qualified engineering firms for the Western Placerville Interchanges Phase 2.3 Project, specifically focusing on the US 50 Westbound Off-Ramp at Ray Lawyer Drive. The scope of work encompasses the full project lifecycle, from Project Approval and Environmental Document (PA&ED) through Plans, Specifications, and Estimate (PS&E), Right-of-Way Certification, bid support, and design support during construction. Key objectives include constructing a new westbound off-ramp, improving the intersection at Ray Lawyer Drive, and enhancing bicycle and pedestrian facilities. The project is located on the State Highway System, funded by State Transportation Improvement Program (STIP) funds, and will be delivered by the City under Caltrans oversight. The selected consultant must adhere to rigorous Caltrans and City of Placerville standards, including CEQA and NEPA environmental revalidation and the Caltrans Workplan Standards Guide WBS. Payment will be structured as actual cost plus a fixed fee, with progress payments made monthly. To avoid organizational conflicts of interest, the selected firm and its subconsultants are prohibited from providing construction management services. Proposals must be submitted by December 7, 2026, consisting of a technical proposal and a separate sealed cost proposal. Award decisions will be based on a 50/50 weighted split between the written proposal score and an interview score for short-listed firms.
City of Placerville

POSTED

about 2 hours ago

DEADLINE

in 20 days
View Details
NAICS: 541330
New
SLED
RFP27-016 Countywide Bicycle & Pedestrian Master Trails Plan
Solicitation # RFP27-016
The Board of Commissioners of Glynn County, Georgia, is soliciting proposals for a Countywide Bicycle and Pedestrian Master Trails Plan covering the Brunswick Area Transportation Study Metropolitan Planning Area, including St. Simons Island and unincorporated Glynn County. The project involves professional planning, analysis, and public engagement to identify network gaps and develop concept-level recommendations for 10 to 20 priority projects. Key deliverables include a scored ranked segment database, a prioritized network gap inventory, a Priority Projects Technical Memorandum with planning-level cost estimates, and a Policy Audit Matrix. All work must comply with FHWA regulations, 2 CFR Part 200, and environmental standards including the Clean Air Act and Clean Water Act. Proposals are evaluated based on practical merit and price, with a technical ranking performed before fee negotiations. The highest-ranked proposer will negotiate the final scope and fee, which is compared against the County's independent cost estimate. Applicants must provide GDOT prequalification documentation, a SAM.gov unique entity ID, and certifications regarding EEO practices and anti-lobbying. Technical requirements include strict GIS data standards using NAD 1983 State Plane Georgia East and the delivery of Esri file geodatabase feature classes. Proposals must be submitted via the County's eProcurement Portal by December 17, 2026.
Glynn County Board of Commissioners

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541330
New
SLED
Citywide Active Transportation Plan RFP
Solicitation # 2026-11 (ATP)
The City of Tustin is seeking a qualified engineering and planning firm to develop a Citywide Active Transportation Plan (CATP). The project focuses on technical analysis, conceptual designs, and the creation of an implementation strategy, with a specific emphasis on public outreach targeting underserved populations, schools, and vulnerable roadway users. Key deliverables include 30 percent engineering concept plans for the top five ranked infrastructure projects, a comprehensive financial plan, and ADA-accessible electronic copies of all deliverables. The project is funded by the Caltrans Sustainable Transportation Planning Grant Program, with a maximum reimbursable amount of $425,000. Selection is based on a qualifications-based ranking process rather than cost, evaluating staffing, technical approach, public outreach experience, resource allocation, and client references. The successful consultant must comply with state funding requirements, maintain a city business license, and provide professional liability insurance, including tail insurance for five years post-completion. All accounting must conform to GAAP and 2 CFR Part 200, with reimbursement based on actual allowable costs. Proposals must be submitted via OpenGov by January 13, 2027, and must include a non-discrimination certification and a non-collusion affidavit.
Public Works

POSTED

about 15 hours ago

DEADLINE

in about 2 months
View Details

More opportunities from EPCOR Canada

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS