Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on July 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

NRP,FLAT PANEL DISP

Closed
SPRPA125RET87Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The solicitation seeks eight newly manufactured 17-inch flat panel monitors, identified by drawing 3429AS4208 Revision B and NSN 7540-01-152-8070, for use in the IFLOLS MK 13 MOD 1 aircraft launch and recovery system. This item is classified as a Critical Application Item (CAI) and a Critical Safety Item (CSI), requiring the highest level of quality control due to its direct role in flight-critical operations where failure could result in loss of life, aircraft, or shipboard systems. Only companies with prior engineering source approval by Naval Air Systems Command are eligible for award; new offerors must submit a comprehensive source approval package including configuration drawings, process sheets, production documentation, comparative analysis, and inspection methods to demonstrate equivalence to previously approved units. First Article Testing is mandatory unless a waiver is requested with evidence of identical prior production delivered within the last three years from the same facility—offerors must submit two separate pricing proposals: one with First Article compliance and one with waiver. The test requires one uncoated unit to be presented for government observation, with the contractor responsible for all testing costs, documentation per MIL-STD-831 and CDRL requirements, and remediation of any failures. Inspection is 100% for critical characteristics, plating, hardness, and non-destructive testing, with additional 100% mandatory inspection by the Procurement Contracting Officer and DCMA Quality Assurance Representative at the contractor’s facility. All items must be marked per MIL-STD-130, traceable by part, and packaged per MIL-STD-2073. The contracting office is DLA Aviation at Philadelphia, and submissions must be sent electronically to [email hidden] by the extended deadline of July 30, 2026. Offers must include proof of authorized distribution from an approved source, and only newly manufactured parts are acceptable—no refurbished, remanufactured, or repaired components. All records must be maintained for seven years and provided to the ALRE Cognizant Technical Authority. This procurement is issued under emergency authority with a waived synopsis due to urgent national defense needs, and the Buy American Act applies.

General Info

Procurement of 17" flight-critical monitor with strict quality, testing, traceability, and approval requirements.

NAICS

336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing

Place of Performance

PA

Set-Aside

NONE

Documents

1

Tab+17+-+Amendment+Informing+Vendors+Of+New+Drawings.PDF

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

8 updates
PhaseClosed
Posted

Solicitation

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Sep 29, 2025 to Apr 2, 2026. The notice description changed. The point of contact changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Apr 2, 2026 to May 27, 2026. The notice description changed.

Notice updated

Response deadline changed from May 27, 2026 to Jun 2, 2026. The notice description changed.

Notice updated

Response deadline changed from Jun 2, 2026 to Jul 30, 2026. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Pa DLA Aviation At Philadelphia
Contacts1 person available
OfficePHILADELPHIA, PA, 19111-5098, USA
Office AddressPHILADELPHIA, PA, 19111-5098, USA

Full Description

Show more
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|||x|||||| TIME OF DELIVERY (JUNE 1997)|20|0001|4|365|||||||||||||||||| STOP-WORK ORDER (AUG 1989)|1|| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| VALUE ENGINEERING (JUN 2020)|3|||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 MONTHS|45 DAYS AFTER DISCOVERY OF DEFECT||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| LIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND 2025-O0004))|12|336413|1250||||||||||| FACSIMILE PROPOSALS (OCT 1997)|1|IN LIEU OF FAX, EMAIL ELECTRONIC VERSION TO contact@example.gov| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||x| Amendment to extend closing date of this requirement to 30 July 2026. Please furnish a valid quote for QTY 8 to DLA Weapons Support Philadelphia (POC: contact@example.gov) by 30 July 2026. Thank you. In September 2025, drawing 3429AS4208 was revised to revision B. This revision included the addition of the Critical Application Item (CAI). Since this 17" flat panel monitor was introduced as part of the IFLOLS MK 13 MOD 1 production design in 2017, all TDRs for this part have required a First Article Test. Due to the IFLOLS criticality of this flat panel monitor, used for the controls and all settings of the IFLOLS, NAVAIR Lakehurst still requirea First Article Test for this item. Please review and advise status of your offer. This amendment increases CLIN 0001 from 4 each to 8 each. For Critical Safety Items (CSI), DFARS clause 252.209-7010, Identification of Critical Safety Items, is incorporated by reference. For items for which Government inspection and acceptance will be conducted at the source, DLAD clause 46.292, Product Verification Testing, is incorporated by reference. DLAD clauses can be viewed at http://www.dla.mil/Acquisition/Pages/DLAD.aspx. As applicable, DFARS clause 252.242-7005, Contractor Business Systems, is incorporated by reference. THIS SOLICITATION IS BEING ISSUED UNDER EMERGENCY ACQUISITION FLEXIBILITIES AUTHORITY; Synopsis is waived based on urgency (FAR 5.202(a)(2)). All potential offers shall provide newly manufactured spares only. Refurbished, remanufactured, or repaired material will not be acceptable;Offers for such are ineligible for award. Offerors are advised that offers received from sources which are not government-approved sources of supply will be deemed technically unacceptable, and therefore ineligible for award. Any distributors of approved source(s) MUST submit a copy of their authorized distributor letter, on the source's letterhead, to the buyer point of contact indicated on the solicitation via email, at time of proposal submittal. \ 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 PRE-AWARD / POST AWARD REQUIREMENTS: Due to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended. 1.3 The components being acquired under this solicitation have been classified as Flight Critical requiring engineering source approval by the Naval Air Systems Command. Only those companies who have submitted requests for source approval and been approved will be eligible for award under this solicitation. Any company not previously approved may submit a Source Approval Request to the contracting officer, Naval Inventory Control Point, (See Block 10 of the SF33 for name and code). The Source Approval Request shall contain the following documentation and shall be submitted by the closing date of this solicitation: (A) Copy of complete configuration drawings for a similar item(s) which your company has produced within the past three years, including test procedures for which your company (1) has been qualified to manufacture and (2) which is similar, i.e., requires the same materials, manufacturing processes, inspections, tolerances and similar application as the item(s) for which you are seeking approval. (B) Copy of the complete process/operation sheets used to manufacuture the similar item, including but not limited to, detailed shop sketches. These plans must note those operations and processes performed by subcontractors/ vendors. (C) Complete copies of purchase orders, shipping documents, etc. that document delivery of production quantities of the part to the Original Equipment Manufacturer or Military service. Provide the most recent copies of the documents. (D) A detailed comparative analysis of the differences/similarities between the similar part and the part(s) for which you are seeking approval. This analysis should include materials, configuration, tolerances, process requirements, dimensions, castings, forgings, etc. (E) Copy of inspection method sheets used in the manufacturing and at final inspection. These sheets should include actual tolerance, print requirements, inspection devices, sources performing the operation and level of inspection. Critical characteristics should be discernible from all other characteristics. The above requirements are a subset of requirements specified in the ASO Source Approval Information Brochure dated January 1995. The submission of this data subset is contingent upon and in consideration of the submitting contractor meeting all other requirements specified in this solicitation to include a bilateral agreement with MDA which includes availability of complete data, MRB disposition, etc. Any company not having such agreement, but desiring to seek engineering source approval, will be required to submit data meeting all requirements of the ASO/NAVICP Source Approval Brochure. 1.4 Sampling rates (AQLs) indicated below shall be used in accordance with ANSI Z1.4 for Single Sampling and a General Inspection Level of II. 1.5 In addition to the 100% PCO Mandatory, critical and major characteristics, attributes for plating, hardness and non-destructive testing will be inspected one hundred percent. 1.6 Contractor shall develop a system for identification of individual piece parts for traceability purposes. Markings shall not be permanent. 1.7 An AQL of 1.5 will be used for Class 3 threads and dimensions, and geometric feature controls with a tolerance range of .010 or less. 1.8 For minor characteristics, a sampling rate determined by the contractor and subject to QAR approval will be used. 1.9 The material covered in this contract/purchase order will be used in a crucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital shipboard systems or loss of aircraft. Therefore,the material has been designated as Critical material and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS DRAWING DATA=3429AS4108 |30003| B| |C| | | | DRAWING DATA=3429AS4208 |30003| A| |C| | | | 3. REQUIREMENTS - NOT APPLICABLE 4. QUALITY ASSURANCE QUALITY ASSURANCE REQUIREMENTS 1. The contractor shall perform Quality Conformance and Lot Sampling Inspection for all associated features that are present in the drawings and specifications: a. Features/attributes/requirements classified as Critical and Major on the drawing(s) or within the technical specification shall be inspected and shall have the actual dimensions documented 100%; b. Attributes for plating, hardness, and non-destructive testing shall be inspected 100%; c. Class 3 Threads, dimensions, and geometric feature controls with a tolerance range of .010 or less shall be inspected using an AQL of 1.5 and the General Inspection Level II as defined by ANSI Z1.4. d. Minor Characteristics: Sampling shall be inspected using an AQL of 4.0 and the General Inspection Level II as defined by ANSI Z1.4. 2. First Article Testing: The contractor shall conduct First Article testing on this item of ALRE/SE and must address all elements listed below and prepare a First Article Test Report documenting the outcome. Unless otherwise specified, the report and its acceptance shall be per the provisions of the applicable Contract Data Requirements List (CDRL). a. Requirements: i. First Article quantity is one (1); in uncoated condition. ii. The First Article shall be available for Government evaluation per the contract schedule. The Evaluation shall be conducted in the presence of the Government personnel. iii. The contractor shall provide facilities and personnel sufficient to conduct all necessary tests to establish conformance; iv. The contractor shall have available for review all certifications, test reports, in-process inspection documents needed to substantiate product quality; this same documentation shall also be included in the First Article test report; v. The contractor shall, at the time of First Article, have corrected any problem areas deemed significant and documented as deficient by the Government within his/her Quality Assurance system not previously identified during prior evaluations and/or surveys; any problems identified during the conduct of the test will also require correction. b. Testing and evaluation: i. The contractor shall accomplish 100% inspection and/or testing of all critical, major, and minor dimensions and/or requirements identified in the drawings, drawing notes, and process and fabrication specifications. Results shall consist of actual dimensions, measurements, and test outcomes and shall be recorded and included in the First Article test report. c. Acceptance/reject criteria: i. Satisfactorily meeting all requirements cited in the First Article Testing "Requirements" paragraph above and satisfactorily demonstrating 100% conformance to the test and evaluation elements cited in the First Article Testing "Testing and evaluation" paragraph above shall constitute acceptance of the First Article; ii. Failure to meet any of the conditions in the First Article Testing ?Requirements? paragraph above or the First Article Testing ?Testing and evaluation? paragraph above shall be cause for rejection. d. Delivery: i. The accepted First Article exhibit may be delivered and counted along with the contract production quantities providing the item has not been damaged during testing, and has been found to be conforming; ii. The contractor is responsible for preparing the First Article Test Report in accordance with CDRL?s. 3. Production Lot Special Tests: N/A 4. N/A 5. N/A 4.1 Review documentation as provided under DD 1423 requirements. 4.2 The test to be performed under the First Article approval clause (FAR 52.209-3) of the contract are listed below 4.2.1 Dimensional test (special) ;APPLIES; 4.2.2 Requirements of: ;NAWC LAKEHURST; 4.2.3 Form ;APPLIES; 4.2.4 Fit ;N/A; 4.2.5 Function ;N/A; 4.2.6 Compliance with drawing ( ;30003; ) ;3429AS4208; , Revision ;REV A.; and specifications referenced therein. 4.3 In addition to the above tests, the First Article(s) to be inspected hereunder shall also be subjected to those tests which will demonstrate that the article(s) comply with the contract requirements 4.4 The contractor shall be responsible for providing the necessary parts and repair of the First Article Sample(s) during inspection 4.5 The contractor shall notify the PCO, ACO, and QAR fourteen (14) days prior to conducting the First Article test so that the Government may witness such testing. 4.5.1 The QAR shall be present to witness all First Article Testing. 4.5.2 The following additional personnel shall witness the First Article Testing: ;DCMA QAR; 4.6 Disposition of FAT samples 4.6.1 ; ; Sample(s) may be destroyed during testing. 4.6.2 ;APPLIES; Unless otherwise provided for in the contract, sample(s) shall remain at the contractor and may be considered as production items under the contract provided the sample(s) can be refurbished to ready for issue condition and provided the sample(s) have inspection approval of the cognizant DCMC QAR. Sample(s) may be shipped as production items only after all other units required under the contract have been produced and are ready for shipment. 4.7 Test Sample Coating Instructions 4.7.1 Samples are to be unpainted. Corrosive areas are to be coated with a light preservative if required. 4.8 Notice to Government of Testing at the contractors facility. 4.8.1 FAR 52.209-3 applies (A) The contractor shall present ;ONE; ; unit(s) of the following CAGE( ;30003; ; ), Part Number ;3429AS4208-1; ; , Revision ;REV A.; ; as specified in this contract. At least fourteen (14) calendar days before the beginning of the First Article testing, the contractor shall notify the contracting officer, in writing, of the time and location of the testing so that the Government may witness the tests. (B) The contractor shall submit the First Article Test Report within 15 calendar days from the date of testing to: ;P.C.O; ; The contractor shall mark the report "First Article Test Report" and cite the contract number and lot/item number. Review documentation as provided under the DD1423 requirements. (C) Within 45 calendar days after the Government inspects the First Article, the contracting officer shall notify the contractor, in writing, of the approval, conditional approval, or disapproval of the First Article. The notice of approval, conditional approval, or disapproval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the contractor. A notice of disapproval shall cite reasons for disapproval. (D) If the First Article is disapproved, the contractor, upon Government request shall repeat any or all First Article Tests. After each request for additional tests, the contractor shall make any necessary changes, modifications, or repairs to the First Article or select another First Article for testing. All costs related to these tests are to be borne by the contractor, including any and all costs for additional tests following a disapproval. The contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified in paragraph B above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests. (E) If the contractor fails to present any First Article on time, or the contracting officer disapproves any First Article, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause of this contract. (F) Unless otherwise provided in the contract, and if the approved First Article is not consumed or destroyed in testing, the contractor may deliver the approved First Article as part of the contract quantity if it meets all contract requirements for acceptance. (G) If the Government does not act within the time specified in paragraph (C) above the contracting officer, shall, upon timely written request from the contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay. (H) Before First Article Approval, the acquisition of materials or components for, or the commencement of production or, the balance of the contract quantity is at the sole risk of the contractor. Before First Article approval, the costs thereof shall not be allocated to this contract for 1) progress payments, or 2) termination settlements if the contract is terminated for the convenience of the Government. The contractor is responsible for providing operating and maintenance instructions, spare parts, and repair of the First Article during any First Article test. (I) The contractor shall produce both the First Article and the production quantity at the same facility and shall submit a certification to the effect with each First Article. (J) The test report (2 copies) shall be in accordance with MIL-STD-831, unless otherwise specified on the DD1423, and shall be submitted via the cognizant DCMC to NAVSUP, ATTN: (Cite name and code in Block 10.a of the SF33). The DCMC shall provide comments on Form DD1222 (2 copies) which shall be forwarded with the test report. Approval of the test report is the PCO's responsibility. Upon notification of approval, condition approval, the ACO shall execute the DD250 to indicate Government acceptance of the test report. 4.9 Alternate Offers - Waiver of First Article Approval Requirements. (The following provisions supersede any waiver of First Article Approval Requirements terms set forth in clause 52.209-3 or 52.209-4 as appropriate) (A) Unless otherwise specified in the solicitation, NAVSUP WSS reserves the right to waive the First Article Approval Requirements specified herein for offerors who have previously furnished identical production articles accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer. An offeror requesting waiver of First Article Requirements shall submit evidence with its offer establishing that: (I) the last production unit was delivered within three (3) years of the issue date of this solicitation, and (II) the production location to be used for this requirement is the same as used for the previous production run. Additionally, the offeror shall submit a certification, to be executed by the officer or employee for the offer, stating that: (I) the articles to be provided will be produced using the same facilities, processes, sequences of operations and approved subcontractors as those previously delivered and accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer, and (II) the previous production units were manufactured without Material Review Board disposition or waiver/deviation request or rejection of pre-production samples for cause. (NOTE: This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section 1001.) (B) Offerors requesting waiver of First Article Approval Requirements under the provisions of this clause are cautioned to submit two prices for articles required herein - one that is based on compliance with the First Article Approval Requirements and one that is based on a waiver of such requirements. Where an offeror submits only one price and fails to clearly state that the price is based on waiver of the First Article Approval Requirements it will be deemed to be based on compliance with the First Article Approval Requirements (C) In the event of the First Article Approval Requirement is granted, the delivery schedule for the production items shall be reduced by the number of days designated for delivery of First Article Test unit plus the number of calendar days indicated for the government notification of conditional approval or approval. These requirements are specified in the quality assurance section of this solicitation. If the offeror is unable to meet the desired schedule, he shall insert below the alternate delivery schedule he offers to the government. Offeror's Proposed Alternate Delivery Schedule (Based on waiver of First Article Approval Requirements) Within Days: Item No. _____________ Quantity:_______ After Date of Contract:_________ 4.10 . Mandatory Inspection Requirements: 100% Procurement Contracting Officer (PCO) mandatory inspection is required and shall be accomplished at source under the surveillance and final approval of the cognizant DCMAO Quality Assurance Representative (QAR). During production, mandatory inspection is required to be accomplished by the contractor as follows: A. Level of Inspection (LOI). 1. Critical characteristics: 100% inspection shall apply. 2. Major and Minor characteristics: LOI shall be in accordance with a sampling plan acceptable to the QAR. B. Critical characteristics: ;JOSE TORRACA NAWCADLKE QA REP / Tel: (732)-323-4265 E-mail: contact@example.gov; C. Major and Minor characteristics 1. Shall be defined by the contractor subject to QAR concurrence, unless defined on applicable drawings and associated specifications. 4.11 FINAL INSPECTION REQUIREMENT:Due to the critical nature of this item, representatives of the buying office/and the cognizant field activity, NAWC Lakehurst, shall be notified by the successful contractor at least 14 days prior to presentation to the DCM QAR of the items for final inspection so that they may have the option of witnessing the final inspection. The contractor shall notify by email or TELEFAX PCO and NAWC Lakehurst QA ;DCMA QAR; to arrange for the final inspection.The authority of the QAR shall not be abrogated. If the notification is not given to both sites then the QAR shall not accept the units. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE THIS IS AN ALRE CRITICAL APPLICATION ITEM. FOR DRAWING UPDATES, SEE ATTACHED NAWC LKE DRAWING UPDATE SHEET. NAVSUP REFERENCE ONLY: PROCUREMENT TDR (25-10047): REPAIR TDR (25-10062) THE COMPONENTS BEING ACQUIRED UNDER THIS SOLICITATION HAVE BEEN CLASSIFIED AS "CRITICAL" REQUIRING ENGINEERING SOURCE APPROVAL BY NAVAL AIR SYSTEMS COMMAND ONLY THOSE COMPANIES WHO HAVE SUBMITTED AND BEEN APPROVED WILL BE ELIGIBLE FOR AWARD UNDER THIS SOLICITATION. ANY COMPANY MAY SUBMIT A SOURCE APPROVAL REQUESTAS OUTLINED IN THIS SOLICITATION. All records pertaining to ALRE CSI/CAI manufacture and inspection/test shall be provided to the ALRE Cognizant Technical Authority. All records shall be maintained by LKE QA and by the manufacturer for a period of seven years. DATE OF FIRST SUBMISSION=ASREQ 16. REMARKS (DATE OF FIRST SUBMISSION) Concurrently with Final Inspection Data Requirements: a. Copies of all approved requests for variations. b. Monitor requirements per Drawing 3429AS4208. c. Inspection and test data per Drawing 3429AS4208. d. Testing per Drawing 3429AS4208. e. Identification per Drawing 3429AS4208, 3429AS4108. f. Packaging per Drawing 3429AS4208. DATE OF FIRST SUBMISSION=ASREQ 16. REMARKS (DATE OF FIRST SUBMISSION) Concurrently with Final Inspection Data Requirements: a. Copies of all approved requests for variations. b. Monitor requirements per Drawing 3429AS4208. c. Inspection and test data per Drawing 3429AS4208. d. Testing per Drawing 3429AS4208. e. Identification per Drawing 3429AS4208, 3429AS4108. f. Packaging per Drawing 3429AS4208.

More opportunities from Department Of Defense → Pa DLA Aviation At Philadelphia

Same awarding agency

NAICS: 336413
New
Federal
16--CYLINDER,SHOCK STRU
Solicitation # SPRPA126QUC16
DLA Aviation at Philadelphia is soliciting quotations for the procurement of six new, unused shock strut cylinders (NSN 1680-01-600-3327 V2) under a fixed-price, small business set-aside contract. This acquisition is conducted as a commercial item procurement, requiring offerors to provide documentation supporting the commerciality of the components. A critical requirement for award is that all parts must be newly manufactured spares; refurbished, remanufactured, or repaired materials are strictly prohibited. All delivered components must be accompanied by a properly executed FAA Form 8130-3 Authorized Release Certificate to ensure airworthiness and traceability from the original manufacturer. The contract mandates strict quality and technical standards, requiring contractors to maintain a quality control system compliant with AS/EN/JISQ 9100 or equivalent standards such as ISO 9001. Evaluation for award will prioritize past performance over price, utilizing the DoD Supplier Performance Risk System (SPRS) to assess item, price, and supplier risk. Delivery is required within 90 days FOB Destination, with packaging and marking adhering to MIL-STD-129 and MIL-STD-2073. Administrative requirements include the use of Wide Area Workflow (WAWF) for invoicing and receiving reports, and compliance with Buy American and cybersecurity regulations.
Other Aircraft Parts and Auxiliary Equipment Manufacturing

POSTED

about 18 hours ago

DEADLINE

in 6 days
View Details
NAICS: 334417
New
Federal
59--HEAT SINK,ELECTRICA
Solicitation # SPRPA126RZB27
The solicitation invites offers for a 59–Heat Sink, Electrical under solicitation number SPRPA126RZB27, issued by the Department of Defense’s DLA Aviation office in Philadelphia, with a response deadline of August 17, 2026. The contract incorporates numerous clauses related to quality assurance, including compliance with ISO 9001 or equivalent, warranty of supplies for one year post-delivery with a 45-day defect discovery window, and mandatory use of Workflow Pro’s Assist Module for invoice processing. Acquisition procedures require adherence to Buy American Act provisions, including certification requirements, and apply restrictions on recovered material content for EPA-designated products. The contractor must comply with small business subcontracting plans, equal opportunity requirements for veterans and workers with disabilities, and prohibitions tied to security classifications. The government may conduct a reverse auction as part of the evaluation process, and offers will be assessed primarily on price, delivery timeframe, and past performance, with non-cost factors weighted equally to price. The NAICS code is 334417 with a size standard of 1,000 employees, and no drawings are provided. Payment and invoice submission must follow Wide Area Workflow instructions using a combined invoice and receiving report. The contract includes provisions for stop-work orders, limitation of liability for high-value items, and mandatory representations and certifications under new federal deviations effective February 2026. All bids must be submitted through SAM.gov, with the point of contact being Jonathan M. Rivera of the DLA Aviation office in Philadelphia.
Electronic Connector Manufacturing

POSTED

about 18 hours ago

DEADLINE

in 20 days
View Details
NAICS: 336413
New
Federal
WINCH,CARGO P47
Solicitation # SPRPA126QZB62
Solicitation SPRPA1-26-Q-ZB62 is a fixed-price request for quotations issued by DLA Aviation at Philadelphia for the procurement of a Cargo Winch P47, identified by NSN 1680-01-653-3300 V2. The requirement is issued under emergency acquisition flexibilities with a response deadline of September 18, 2026. Delivery is required within 90 days, FOB Destination. To be considered technically acceptable, offerors must be government-approved sources of supply or provide an authorized distributor letter on the manufacturer's letterhead. The part must be acquired from manufacturing sources specified on a source control or selected item drawing per DoD-STD-100. The government intends to make a single award based on the most advantageous offer, prioritizing past performance over price. Evaluation will utilize the DoD Supplier Performance Risk System for quality and risk assessments. The contract mandates strict adherence to MIL-STD-2073 for packaging and MIL-STD-129 for marking, including specific DLR label requirements. Invoicing must be processed electronically via the Wide Area Workflow system using a 2:1 combo report. Key regulatory compliance includes the Buy American Act, NIST SP 800-171 cybersecurity requirements, and various FAR and DFARS clauses regarding labor disputes, child labor, and prohibitions on Chinese military companies. Inspection and acceptance will occur at the origin.
Other Aircraft Parts and Auxiliary Equipment Manufacturing

POSTED

about 18 hours ago

DEADLINE

in 6 days
View Details
NAICS: 333914
New
Federal
PUMP,RECIPROCATING
Solicitation # SPRPA126QYD35
Solicitation SPRPA126QYD35, issued by DLA Aviation at Philadelphia, is a small business set-aside for the procurement of newly manufactured reciprocating pumps. This item is designated as critical material because it is used in shipboard systems for aircraft launch and recovery, where failure could lead to serious injury or loss of life. Consequently, the government requires that all supplies be newly manufactured, as refurbished or repaired materials are ineligible for award. Offerors must be government-approved sources of supply, and distributors must provide an authorized distributor letter on the source's letterhead at the time of proposal submission. The contract is a fixed-price agreement requiring adherence to AS/EN/JISQ 9100 quality standards and NAWCAD Lakehurst drawing 80020 / 653D326-1. Delivery is required within 90 days, with inspection and acceptance occurring at the origin. Packaging must comply with MIL-STD-2073-1 and MIL-STD-129 marking requirements. Award will be made to a single responsible offeror based on the most advantageous combination of price and past performance, with past performance weighted as more important. Evaluation will include risk assessments via the Supplier Performance Risk System regarding item, price, and supplier risk. Invoicing and receiving reports must be processed through Wide Area Workflow.
Measuring, Dispensing, and Other Pumping Equipment Manufacturing

POSTED

about 18 hours ago

DEADLINE

in 6 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS