Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

NRP,FWD RH FITTNG D — 1710016577426 — N0038326QTC80

Active
N0038326QTC80

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract establishes the requirements for the repair, overhaul, and inspection of the NRP, FWD RH FITTNG D (Part Number 1710 016577426) to return the item to a Ready For Issue condition. The contractor is responsible for providing all necessary facilities, labor, materials, and tooling, as the government will not provide manufacturing aids or special test equipment. All work must be performed in accordance with The Boeing Company drawing 8090201867-20 and applicable military standards, including MIL-STD-130 for markings and ISO 9001/SAE AS9100 for quality management. Key operational provisions include specific protocols for items determined to be Beyond Economical Repair, Missing on Induction, or requiring Over and Above Repair, all of which require written concurrence from DCMA and approval from the Procuring Contracting Officer. The contractor must maintain a strict calibration system and a configuration management plan. Additionally, the use of non-new materials or the cannibalization of parts is prohibited without explicit written approval from the PCO. All repairs must be conducted at the identified facility in Seattle, Washington.

General Info

Contract for repair and overhaul of part 1710 016577426 in Seattle, Washington.

Agency

Department Of The Navy → Navsup Weapon Systems SupportView Agency

NAICS

811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and MaintenanceView NAICS

Place of Performance

PHILADELPHIA, PA, 19111-5098, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navsup Weapon Systems Support
ContactsNo contacts available
OfficePHILADELPHIA, PA, 19111-5098, USA
Organization / Agency
Department Of The Navy → Navsup Weapon Systems Support
View Agency Profile
Office AddressPHILADELPHIA, PA, 19111-5098, USA
ContactsNo contact information available

Full Description

Show more
TECHNICAL DATA PACKAGE
Description
TDP VERSION NUMBER 001 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;THE BOEING COMPANY; drawing number ( ;81205; ) ;8090201867-20; , Revision ;Latest; and all details and specifications referenced therein. 1.3 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.4 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled). 3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired). 3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: NRP,FWD RH FITTNG D ;8090201867-20; P/N, ;1710 016577426; NSN, ;Available repair manuals, drawings and specifications per p/n requirements; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. 3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility. 3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the "prime contractor" or the "actual manufacturer" appearing on the drawings and / or specifications or technical data furnished by the Government shall be read as the "Government Designated Agency" 3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test. 3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be BER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO. Any disposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements. 3.4.5 Missing on Induction (MOI). A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs). Contractor replacement of MOI SRAs is not included in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The contractor shall provide all such determinations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The contractor shall not induct and/or repair WRAs with MOI SRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO. Items received by the contractor missing consumable parts are not MOI items. Rather, repair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under this contract. 3.4.6 Replacing Failed or Missing Shop Replaceable Assembly (SRA) when repairinga Weapons Replaceable Assembly (WRA). 3.4.7 A. When the contractor believes one or more SRA(s) within a WRA are either: 3.4.8 Beyond Economic Repair (BER) or Beyond Repair (BR) i. e. the unit is not capable of being repaired because of the extent of physical damage), or Missing on Induction (MOI), the contractor shall obtain written verification from DCMA and advice from the Inventory Manager whether a SRA may be replaced by one or more of the following options: Ship in place from an existing spares or repair contract, if any, MILSTRIP the SRA(s), otherwise be provided direction for obtaining the SRA(s) at no cost to the contractor.The detailed procedures are set forth in Section 6.0 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK. 3.4.9 B.When not otherwise provided for (or precluded) by other terms of this contract, the contractor may seek written authorization to replace failed SRA(s) with Ready For Issue SRA(s). When authorized, the procedures set forth in paragraph 3.0 of Section 6.2 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK shall be followed. 3.4.10 Over and Above Repair (OAR). An item sent to the contractor shall be considered to require over and above (OAR) repair effort if the repair required is not the type of repair that would be anticipated as a result of normal Navy operation of the item and is not included in the contract pricing due to the nature or scope of the repair needed for that particular item. Therefore, repair of OAR items may be subject to equitable adjustment. The Contractor shall obtain written concurrence from DCMA for all units determined by the contractor to require OAR effort. All such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the contractor to the PCO prior to undertaking repair of the item. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. Any ordered disposal shall be performed by the contractor in accordance with all applicable regulations and DCMA disposal procedures and requirements. 3.5 4.0 PARTS AND MATERIALS 3.5.1 General. The contractor is responsible for supplying all parts and material necessary to perform the required repairs under this contract unless parts or material are specifically identified as Government Furnished Material (GFM). All parts and material used in performance of this contract shall be in accordance with the latest approved revision of applicable drawings and specifications and shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein. Authorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization must be approved by the PCO. Cannibalization of units that have not been inducted is not typically authorized and requires specific approval by the PCO. 3.5.2 The contractor shall ensure it has access for the duration of this contract to updated drawings and specifications for parts and material required for repairs performed under this contract. Any change to such parts/material drawings or specifications requires Government approval in accordance with the Configuration Management provisions of this Statement of Work. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which require source approval, unless the contractor is the Design Control Agent (DCA) (i.e. the entity responsible for maintaining the latest configuration data) for the the contract item. If the contractor is the DCA, the contractor may approve approve changes to manufacturing source or manufacturing facility for all parts, including those which require source approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to the drawings, specifications or manufacturing source or facility. 3.5.3 Purchased Material Control and Parts Control. The contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, assure that the parts and and material purchased are in compliance with the requirements of this contract. 3.5.4 Receiving Inspection of Purchased Parts and Material. (1)Purchased items shall be inspected upon receipt at the contractor's facility to assure conformance with all requirements of the applicable drawings and specifications or (2)the contractor shall provide prior to the contract award evidence for Government review and approval of a purchased parts and material system which provides for the inspections to assure conformance with all requirements of the applicable drawings and specifications. Evidence of such inspections of such inspections shall be maintained by the contractor or subcontractor for Government review.The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria such as certifications and actual dimensonal readings. 3.5.5 ^^^NOTE^^^PART CANNIBALIZATION IS NOT AUTHORIZED UNLESS SPECIFICALLY APPROVED BY NAVSUP WSS AND THE BDE. 3.5.6 3.6 SOURCE AND LOCATION OF REPAIR SOURCE: 3.6.1 The contractor shall specify the name of the Source/Division performing the work and the actual location where work will be performed. NRP,FWD RH FITTNG D ;THE BOEING COMPANY; Company Name , ;MAIL STOP 45-24, P O BOX 3707, SEATTLE, WA, 98124-2207 ; Address , ;81205; Cage Code inspection will be accomplished on the contractor's equipment 3.7 5.0 CONTRACTOR QUALITY REQUIREMENTS: 3.7.1 Quality Program. The Contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO 9001/ SAE AS9100. The Contractor's quality management system/program shall be designed to promptly detect, correct and prevent conditions that adversely affect quality. 3.7.2 Calibration System Requirements. Contractor shall maintain a calibration system that meets the requirements of ANSI/NCSL Z540.3, ISO-10012-1 or an equivalent calibration program acceptable to the Government. 3.8 6.0 CONFIGURATION MANAGEMENT (CM): 3.8.1 The contractor shall maintain a configuration management plan in accordance with the provisions of NAVSUP WSS configuration management clause NAVICPIA18. (Refer to contract). 3.9 7.0 MARKINGS. 3.9.1 Marking shall be as indicated in the contract when applicable. 3.10 8.0 STORAGE; 3.10.1 The contractor shall provide a proper enclosed warehouse environment for both material items awaiting repair and assets which have been repaired and are awaiting shipment to ensure the items are not damaged while being stored. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE

Similar Contracts

Same NAICS industry code

NAICS: 811310
New
1089 – Cafeteria freezer #1 & Cooler #4 Replacement
Solicitation # 26-137
This subcontracting opportunity for the Atterbury Job Corps Center in Edinburgh, Indiana, involves the full removal and replacement of Cafeteria Freezer #1 and Cooler #4. Freezer #1 requires replacement due to significant frame and door damage causing freeze-ups and seizing fans, while Cooler #4 must be replaced due to an inoperable unit, a sagging ceiling, and drainage backups. Additionally, the project includes correcting the exit door of the main Electrical Room on the northwest side of the building to ensure it opens toward egress and is equipped with panic hardware to comply with NEC 2020 110.26.C (3) for equipment rated 800A or more. The solicitation is set aside for various small business categories and requires a single lump sum bid with a detailed cost breakdown. A mandatory site visit was scheduled for September 3, 2026, and proposals are due by September 11, 2026. Award will be based on best value rather than the lowest price. The selected contractor must hold a valid Indiana state license, provide proof of specific automobile and workers' compensation insurance, and adhere to Davis-Bacon Act wage determinations and EPA and OSHA regulations. Key deliverables include a sequenced construction schedule within 10 days of the Notice to Proceed, a one-year workmanship guarantee, and the provision of all operating manuals and training. Final acceptance is contingent upon a substantial completion walk-through and the resolution of all punch list items within 14 days.
Adams & Associates, Inc.

POSTED

about 9 hours ago

DEADLINE

in 8 days
View Details
NAICS: 811310
New
Federal
J035--ELEVATOR MAINTENANCE, INSPECTION, & REPAIR SERVICE VA SIERRA NEVADA HEALTH CARE SYSTEM
Solicitation # 36C26126Q1078
This is a sources sought announcement issued by the Department of Veterans Affairs Network Contracting Office 21 for elevator maintenance, inspection, and repair services at the VA Sierra Nevada Health Care System in Reno, Nevada. The announcement is not a solicitation and does not obligate the government to award a contract; it is purely for informational purposes to gather market research and inform future procurement decisions. The anticipated base period of performance is October 1, 2026, through September 30, 2027, with four optional one-year extension periods extending through September 30, 2031. The scope involves servicing 17 elevators and one cartlift in accordance with the draft Performance Work Statement, which requires weekly routine maintenance, monthly fire fighter recall testing, compliance with ASME and NFPA standards, and immediate response within one hour for passenger entrapments and two hours for all other service calls. All work must adhere to federal, state, and local regulations, including the International Building Code and VHA directives, with strict requirements for storage of parts and materials in enclosed metal or fire-rated cabinets and prohibition of obstructions in stairwells or hallways. Contractors are expected to provide a full-time journeyman mechanic on-site during standard hours and a designated contract manager, along with qualified personnel holding Nevada licenses, NEIEP or IUEC certifications, and documented experience. Respondents must submit a complete response by email to Angela.Gerlitzki1@va.gov no later than 10:00 A.M. EST on August 10, 2026, and failure to provide all requested information will render the response non-responsive. Required submissions include the company’s socioeconomic status with verification of SAM registration and Unique Entity Identifier, evidence of Nevada state licensure, a capabilities statement and list of similar past projects, proof of SBA certification if claiming SDVOSB or VOSB status, confirmation of compliance with subcontracting limitations outlined in FAR 52.219-14 and VAAR 852.219-73/74, a completed estimated price schedule, and the GSA contract number if applicable. Contractors must also comply with VA security protocols including background checks for all personnel, possession of VASNHCS-issued identification badges, and adherence to strict policies regarding substance use and prohibited individuals. Parts and materials are billable at actual cost plus a maximum 10% markup, with detailed invoices required for payment, including
261-NETWORK Contract Office 21 (36C261)

POSTED

about 13 hours ago

DEADLINE

in 8 days
View Details
NAICS: 811310
New
Federal
Electrical maintenance/retrofit for Devlieg Mill Machining Center
Solicitation # W519TC-26-Q-A138
Solicitation W519TC-26-Q-A138, issued by the Army Contracting Command - Rock Island, seeks a firm fixed price purchase order for the electrical maintenance and retrofit of a Devlieg 4W72 Mill Machining Center located at the Rock Island Arsenal Joint Manufacturing and Technology Center in Illinois. The scope of work includes the evaluation, engineering, procurement, manufacturing, and installation of an electrical retrofit package to upgrade the machine to operational status. Key technical requirements involve the installation of new FANUC controls, servo motors, and a spindle motor, as well as the integration of a Renishaw Probe System with Inspection Plus Software. All new components and wiring must meet NEMA standards and be properly labeled. The government has explicitly stated that the machine and all government-furnished equipment must remain on-site at the installation; off-site retrofit is not permitted. The contract is being awarded to the responsible offeror whose proposal is most advantageous to the government, considering price and other factors. Administrative requirements include invoicing via Wide Area Workflow and electronic funds transfer for payments. The primary point of contact for this solicitation is Christine Szalo. The estimated award amount is 26,000 dollars, and the response deadline is September 8, 2026.
W6QK Acc-Ri

POSTED

about 13 hours ago

DEADLINE

in 5 days
View Details

More opportunities from Department Of The Navy → Navsup Weapon Systems Support

Same awarding agency