Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

NS27-138 Smithfield City - Springline Replacement - Phase 2

Open
NS27-138State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Smithfield City is soliciting bids for the Springline Replacement - Phase 2 project, which involves the installation of a new 12 inch HDPE waterline along canyon road. The scope of work extends from the end of phase 1 to the last spring on the system, requiring that all existing springs along the project length be tied into the new line. This procurement is managed by Smithfield City and JUB Engineers, with electronic contract documents available in PDF format via the JUB website starting November 17, 2026. Interested bidders must attend a mandatory pre-bid conference on December 1, 2026, at 1:00 p.m. at the Smithfield City Offices located at 96 S. Main, Smithfield, UT 84335. All written questions must be submitted through the project location at the JUB website by December 10, 2026, at 12:00 p.m. Final bids must be delivered to the Smithfield City Offices by December 16, 2026, at 2:00 p.m. local time. This is a local procurement opportunity, and all responses and inquiries should be directed to the designated city office rather than the Division of Purchasing.

General Info

Bids for Smithfield City's Springline Replacement Phase 2 HDPE waterline installation project.

Agency

Place of Performance

UT, USA

Set-Aside

NONE

Documents

1
DOCX, High priority: read this firstifb
High

Read the document

Due in 31 days

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 31 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 1 solicitation documentRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyUtah
ContactsNo contacts available
OfficeUT, USA
Organization / AgencyUtah
Office AddressUT, USA
ContactsNo contact information available

Interested Companies (33)

Beck Construction & ExcavationSouth Jordan, Utah
Bellwork
BidSparq

See All 33 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
**The Issuing Office for the Bidding Documents is: Smithfield City / JUB Engineers.** Electronic Copies (pdf format) of the Contract Documents will be available on November 17, 2026 and may be obtained at www.jub.com.
**Questions: The deadline for questions is December 10, 2026 at 12:00 p.m. All questions shall be submitted in writing under the project location at www.jub.com.**
**Submission: Bids for the construction of the Project will be received at the Smithfield City Offices located at 96 S. Main, Smithfield, UT 84335, until December 16, 2026, at 2:00 p.m. local time.**
**Mandatory Pre-bid Conference: A mandatory pre-bid conference will be held at 1:00 p.m. prevailing local time December 1, 2026, at Smithfield City Ofices - 96 S. Main, Smithfield, UT 84335.**
Please note that there is a 1GB limit on a single file upload. This courtesy posting is an advertisement of a procurement opportunity for **Smithfield City**, not the Division of Purchasing. Responses should be directed to the designated individual/office as designated in the solicitation document. The contract award for this solicitation will not be posted on this website. Instead, you will need to contact the designated individual/office as identified in the solicitation document. This solicitation posting will be canceled/closed upon the closing date of this solicitation; however, a vendor’s response will still be evaluated by **Smithfield City** as described in the solicitation document. The Division of Purchasing is neither the issuing or conducting procurement unit for this solicitation, as such it is the vendor's responsibility to review the entire solicitation in order to comply with any requirements.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sanitary sewer system improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of PVC and DIP piping ranging from 6 to 30 inches, the construction of standard and doghouse manholes, and the execution of 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional requirements include CSO regulator fit out, outfall construction, maintenance of flows and bypass operations, and the abandonment of existing pipes and manholes. Project execution requires strict adherence to environmental standards through SWPPP implementation and maintenance, as well as the use of geotechnical instrumentation and monitoring. Due to the project location and nature, railroad insurance is a mandatory requirement. General site preparation tasks such as clearing and grubbing of wooded areas and subsequent seeding and fine grading are also included in the bid schedule.
Cleary Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 17 days
View Details

More opportunities from Utah

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS