Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on January 4, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

NSA HTHW Pipe Grouting Abandonment

Closed
C006506State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

Documents

1
PDF, High priority: read this firstsources-sought
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Forging and Fabrication of Angle Brackets (NSN 5340-01-253-6509)Open now, due in 11 days
  • Manufacture and Supply of Metal Tube Assemblies (P/N 349T2220-4589)Open now, due in 11 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Feb 8, 2024 to Feb 1, 2024. NAICS code changed from 238110 to 332410.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCentral Florida Tourism Oversight District
Contacts1 person available
OfficeN/A

Full Description

Show more
The scope of services includes the engineering consultant (Consultant) assisting the Central Florida Tourism OversightDistrict (CFTOD or the District) by providing professional engineering services to provide design, bidding, permittingand construction phase services for the abandonment, through grouting, or removal of a HTHW pipe located in theNSA and within the Magic Kingdom utilidor.The Magic Kingdom receives HTHW utility service from the CFTOD Magic Kingdom Central Energy Plant (CEP)for the purpose of heating domestic hot water, space heating and re-heating. HTHW is delivered at approximately350F to heat exchangers in a mechanical room located near the north entrance to the Magic Kingdom tunnel system.The HTHW is generated at the CEP using a dual fuel (gas and oil) HTHW boiler or from waste steam available at thecombined cycle electric generation plant. The HTHW utility was developed at the time CEP was constructed to servethe Magic Kingdom and hotel complexes located in the resort area. Over time heating demand has been reduced dueto piping failures and modernization efforts. Currently, the Magic Kingdom is the only customer using HTHWservices.As the HTHW distribution piping was decommissioned the piping was abandoned in place without provisions toremove or grout fill. The current 2018 version of the EPCOT Mechanical Code under section 101.5.4 requires that allpiping and/or fittings be removed. If it is technically infeasible to remove the piping and/or fittings, the pipe and/orfittings may be abandoned in place, at the discretion of the Chief Mechanical Inspector. To abandon in place requiresthe pipe and/or fittings to be filled and sealed with grout equal to Class “C” concrete. The grout shall form a solidwaterproof plug completely bonded to the pipe, and the pipe shall be permanently labeled as abandoned.The selected consultant will be expected to generate construction plans and specifications for the execution of theHTHW pipe abandonment or removal that meets or exceeds the requirements of all CFTOD/RCES standards, andstandard drawing templates for the construction. The plans shall be industry standard scale with required plans,elevations and details generated as required. The plans shall depict all known utilities and other conflicts in the vicinityof the proposed work. Location of these features shall be determined via review of existing utility drawings and sitesurvey, as necessary.The designs shall generally adhere to the CFTOD/RCES Utility Specifications and Construction Standards formaterials, means, methods, standard details, testing and other requirements. These standards shall be the boilerplatefor the technical specifications, but the selected consultant will be expected to tailor these documents to the specificproject requirements and add or delete sections as required. Standard details shall be treated likewise. Safety, accessand Maintenance of Traffic (MOT) requirements shall meet or exceed those of CFTOD and RCES.The following tasks will be performed as part of the work:1. Task 200 Construction Documents2. Task 600 Stakeholder Outreach: Stakeholder Meeting/Presentation Development/Town Hall Meetings3. Task 700 Bidding Assistance4. Task 800 Construction Administration Services

More opportunities from Central Florida Tourism Oversight District

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS