Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on January 15, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

NW/NE 53rd Avenue Resurfacing from US Highway 441 to State Road 24 Project #919-7907

Closed
25-488-LCState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract involves a roadway resurfacing project along NW/NE 53rd Avenue from US Highway 441 to State Road 24, with a total project value estimated between two and five million dollars. The scope of work for the base bid includes milling and resurfacing the existing roadway, constructing connections, and paving at specified locations. Additionally, there are three bid options that propose constructing turn lanes at key intersections: NW 15th Street, the GRU water plant, and Waldo Road, respectively, allowing for potential phased enhancements based on funding and project priorities. The project is managed by the California Public Works department under solicitation number ITB 25-488-LC Rebid, with a response deadline of February 19, 2025. The primary point of contact is Leira Cruz Cáliz, reachable via email or phone, and the project is open to qualified contractors under NAICS code 238110, which pertains to highway, street, and bridge construction.

General Info

Documents

4
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstaward
High
PDF, High priority: read this firstitb
High
PDF, High priority: read this firstspecifications
High

Read all 4 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • ASO-0953-00 Construction of standalone DME at Paulding Northwest Atlanta Airport (PUJ), Dallas, GAOpen now, due in 43 days
  • 26_1123 – Hanska-MNOpen now, due in 3 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works
Contacts1 person available
OfficeN/A

Full Description

Show more
The project scope for the base bid includes milling and resurfacing of the existing roadway and connections along with turnout construction and paving at designated locations. Bid options 1, 2, and 3 include additional work to construct turn lanes at NW 15th Street, the GRU water plant, and at Waldo Road, respectively.

More opportunities from California → Public Works

Same awarding agency

NAICS: 237310
New
SLED
El Rancho Drive, La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135)
Solicitation # 40579
The El Rancho Drive and La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135), is a public infrastructure safety initiative managed by the County of Santa Cruz Department of Public Works. The project involves the installation of the Midwest Guardrail System and associated infrastructure repairs across 16 total locations, specifically 6 locations along El Rancho Drive and 10 locations along La Madrona Drive. The scope of work includes the removal of existing guardrails and AC dikes, cold planing AC pavement to a depth of 2 inches, constructing new AC dikes, and building earth retaining structures. The estimated cost of the project is 812,997 USD, with a required completion timeframe of 70 working days. The project is subject to strict federal and state regulations, including Buy America requirements for iron, steel, and manufactured products, and adherence to the Davis-Bacon and Related Act. It is a prevailing wage project governed by the Department of Industrial Relations. Contractors must provide a bid bond or security, as well as faithful performance and payment bonds upon award. Compliance requires rigorous documentation, including mill tags for steel products, certificates of compliance, and a clear chain of custody record verified by the Engineer. Proposals must be submitted electronically via the OpenGov portal and include mandatory certifications regarding debarment, non-collusion, and equal employment opportunity.
Highway, Street, and Bridge Construction

POSTED

about 15 hours ago

DEADLINE

in 23 days
View Details
NAICS: 541330
New
SLED
Citywide Active Transportation Plan RFP
Solicitation # 2026-11 (ATP)
The City of Tustin is seeking a qualified engineering and planning firm to develop a Citywide Active Transportation Plan (CATP). The project focuses on technical analysis, conceptual designs, and the creation of an implementation strategy, with a specific emphasis on public outreach targeting underserved populations, schools, and vulnerable roadway users. Key deliverables include 30 percent engineering concept plans for the top five ranked infrastructure projects, a comprehensive financial plan, and ADA-accessible electronic copies of all deliverables. The project is funded by the Caltrans Sustainable Transportation Planning Grant Program, with a maximum reimbursable amount of $425,000. Selection is based on a qualifications-based ranking process rather than cost, evaluating staffing, technical approach, public outreach experience, resource allocation, and client references. The successful consultant must comply with state funding requirements, maintain a city business license, and provide professional liability insurance, including tail insurance for five years post-completion. All accounting must conform to GAAP and 2 CFR Part 200, with reimbursement based on actual allowable costs. Proposals must be submitted via OpenGov by January 13, 2027, and must include a non-discrimination certification and a non-collusion affidavit.
Engineering Services

POSTED

about 17 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 237310
New
SLED
West Linda Multi-Use Basin Phase II Project
Solicitation # 3260070
The West Linda Multi-Use Basin Phase II Project, solicitation number 3260070, is a public works construction project for Yuba County, California, with an estimated cost of $1,121,293.00. The scope of work involves improvements at the West Linda Detention Basin, including the construction of parking lot improvements, a multi-use path, a ramp to the basin, workout and bench areas, and various landscape enhancements. The project is governed by 2025 Caltrans Standard Specifications and Yuba County standards. Performance is divided into three timelines: general work must be completed within 60 working days, plant establishment within 90 working days, and the total project including plant establishment within 150 working days. The County anticipates issuing the Notice to Proceed in April or May 2027, with an estimated start date in May or June 2027. The contract will be awarded to the lowest responsive and responsible bidder possessing a valid Class A General Engineering contractor's license. Bids must be submitted as sealed proposals by November 19, 2026, and must include a bid bond or certified cashier's check for 10 percent of the total bid price. Successful bidders are required to provide payment and performance bonds, as well as insurance certificates, prior to agreement execution. Key compliance requirements include adherence to the Buy America provisions of the Surface Transportation Assistance Act of 1982, California General Prevailing Wage Rates, and the implementation of a Worker Environmental Awareness Program regarding tribal cultural resources. Payment is subject to retention per the special provisions, and quality assurance will be managed through a certified private consultant materials laboratory.
Highway, Street, and Bridge Construction

POSTED

about 19 hours ago

DEADLINE

in 2 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS