Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on June 12, 2017. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

NWD MEGA Phase B 8(a) AE Services MATOC

Awarded
W912DQ-16-R-3003Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
2026 AC Water Main Replacement
Solicitation # 2026-RFQ-042
Solicitation 2026-RFQ-042 is a request for qualifications from the City of Mercer Island Public Works department for professional engineering services to design water system upgrades. The project focuses on replacing approximately 5,000 linear feet of aging asbestos cement water mains with ductile iron mains along SE 40th St and E Mercer Way. The scope is divided into two phases: Phase 1 involves water system and PRV vault replacement on SE 40th St from Greenbrier Ln to 97th Ave SE, and Phase 2 extends the replacement to 97th Ave SE and the 3700 and 3800 blocks of East Mercer Way. Additional components for replacement include fire hydrants and water services. The design must comply with the Reduction of Lead in Drinking Water Act and the City of Mercer Island Standard Details Water. The project follows a goal-based timeline with bid-ready plans for Phase 1 due by Q2 2027 and Phase 2 by Q3 2027, with overall construction completion targeted for Q2 2028. Qualified firms must be licensed in the State of Washington and submit a Statement of Qualifications limited to 12 pages, including a proposed timeline and three references from the last five years. Selection is at the sole discretion of the City, and the awarded firm will negotiate a scope and fee schedule using the City's standard professional services agreement. Administration is managed by the City Manager, with payments issued via City warrant within 45 days of receiving a proper monthly invoice.
Public Works

POSTED

about 8 hours ago

DEADLINE

in 14 days

AI Contract Overview

Show more

The U.S. Army Corps of Engineers Northwestern Division is acquiring Architect-Engineer Hazardous, Toxic, and Radioactive Waste and Environmental Indefinite Delivery Contracts as part of the Multiple Environmental Government Acquisition Phase B. This procurement is set aside for 8(a) Small Businesses with average annual gross receipts of 15 million dollars or less. The government intends to award contracts to three firms sharing a total capacity of 6 million dollars. Each contract consists of a three year base period with one two year option period. Work is primarily located within the Kansas City, Omaha, and Seattle Districts and covers a broad range of services including site investigations, remedial designs, chemical sampling, and habitat restoration. Task orders may be firm fixed-price or cost reimbursable and are awarded based on a firm's specialized experience, technical competence, professional qualifications, past performance, capacity, and knowledge of the locality. Selection is conducted in accordance with the Brooks Act, meaning price competition is prohibited. Primary evaluation criteria focus on the firm's five year history of HTRW work, adherence to environmental regulations such as CERCLA and RCRA, quality management processes, and the professional qualifications of key staff in disciplines like hydrogeology and civil engineering. A secondary criterion regarding the volume of Department of Defense awards in the previous 12 months serves as a tie-breaker.

General Info

Contract Value

$0

NAICS

541330 - Engineering Services

Place of Performance

USACE NWD (including Kansas City, Omaha, and Seattle Districts)., MO, USA

Set-Aside

NONE

Award Issued Date

Documents

1

Synopsis Q&A for NWD MEGA Phase B A/E Services MATOC

PDF, High priority: read this firstq-and-a
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline changed from May 20, 2016 to May 27, 2016. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Kansas City
Contacts2 people available
OfficeKANSAS CITY, MO, 64106-2896, USA
Office AddressKANSAS CITY, MO, 64106-2896, USA
Contacts
Kori HamesContract Specialist
William J. HillContracting Officer

Full Description

Show more
Contract Information: The Northwestern Division (NWD) of the U.S. Army Corps of Engineers has a requirement to acquire Architect-Engineer (A-E) Hazardous, Toxic, and Radioactive Waste (HTRW)/Environmental Indefinite Delivery Contracts (IDC) for execution of its environmental mission. This contract acquisition is part of NWD's Phase B of the Multiple Environmental Government Acquisition (MEGA). These regional A-E contract acquisitions will be conducted in accordance with Public Law 92-582, the Brooks Act, and Federal Acquisition Regulation (FAR) Subpart 36.6 and Defense Federal Acquisition Regulation Supplement (DFARS) 236.6. The majority of the work will be located in NWD (including Kansas City, Omaha, and Seattle Districts). In support of this effort, the Government intends to award contracts to three (3) 8(a) Small Business firms sharing $6 million in total contract capacity. However, if the Contracting Officer determines during the selection process that fewer or more than three (3) contracts should be awarded, based on the selection criteria, the Contracting Officer has the discretion of adjusting that number, or awarding none at all. This announcement is open to all 8(a) Small Businesses. The period of performance for each contract will included a base period of three (3) years and one option period of two (2) years. It is anticipated that the contracts will be awarded not earlier than October 2016. Task orders will be issued as the need arises during the contract ordering period. Task order assignments will be determined with consideration of each firm's specialized experience and technical competence, professional qualifications, past performance, capacity, and knowledge of locality. These task orders may be either firm fixed-price or cost reimbursable type orders. There is no limit on the value of individual task orders. The NAICS Code for this procurement is 541330 -- Engineering Services. For the purposes of this procurement a concern is considered a small business if its average annual gross receipts are $15million or less. More than one contract may be awarded for the same scope of work. Under the Brooks Act, price competition is not allowed for A-E contracts. Due to the nature of the requirements, projects are completed in phases such as preliminary assessment, remedial investigation, feasibility study, and then design. The project scope will be reviewed to determine whether the requirement can be accomplished using a firm fixed-price task order or whether uncertainties will require the use of a cost reimbursable task order. When the requirement is identified, the government will notify all contractors in the pool that an evaluation will be conducted. The notification will state that the contractor's SF 330 will be used, and/or may request unique experience or qualifications to be submitted and evaluated with the SF 330 for task order evaluation. Specialized experience and technical competence, professional qualifications, past performance, capacity, and knowledge of locality will be considered for task orders to determine which firm is most highly qualified to accomplish the work. The ordering period for the IDC will begin on the date of contract award and the ordering period will be in effect for the three (3) year base period; in addition there is a provision for one two (2) year option period; if the option period is exercised, the length of the ordering period will be five (5) years. The period of performance for task orders awarded under the IDCs will be determined based upon the work requirement and will be included in the task order solicitation and negotiated award documents. An RFP will be issued to the selected firm for each task order. The Service Contract Act of 1965, as Amended, is applicable to this solicitation and resulting contracts and will be incorporated into same. Service wage rates will be determined relative to both the employee's office location and the location of the work. To be eligible for contract award, a firm must have a D-U-N-S number from Dun & Bradstreet (D&B) and be registered in the System for Award Management (SAM). For information in regard to opening an SAM account, see the following link for instructions: https://www.sam.gov/sam/tra nscript/Quick_Guide_for_Contract_ Registrations_v1.7.pdf. Contractors may obtain information on registration and annual confirmation requirements via the Internet at http://www.sam.gov or by calling (866) 606-8220. Additionally, in accordance with FAR Part 22.1303, all firms must complete their VETS- 100 report. Information can be found at the Department of Labor website http://www.dol.gov/vets/programs/fcp/main.htm, or call the service center at 1-866-237-0275; you will be asked to provide your company name, employer identification number (EIN), and DUNs number. 1. Project Information: Firms must be capable of performing work on a wide variety of HTRW/environmental sites in a manner that complies with federal, state, and local regulations and laws, and within time frames required. At least 50 percent of the cost of contract performance incurred for personnel shall be expended for employees of the concern. A majority of the work to be performed is expected to be for HTRW/environmental sites in the USACE NWD. Specific needs will be determined based upon project requirements as described in each task order. Project assignments will typically require performance on-site and in an office setting. Selected firms will work on a variety of hazardous waste and other environmental projects, including, but not limited to contaminated soil and groundwater, contaminated sediments, radioactive and mixed wastes, underground storage tanks and fueling systems, and habitat restoration and mitigation. Assignments will include site investigations, subsurface exploration, chemical sampling, testing and analyses, hazard evaluations, feasibility and other engineering studies and reports, groundwater and other modeling, contaminant fate and transport analysis, human health and ecological risk assessments, HTRW remedial designs, preparation of plans and specifications, cost estimating, value engineering screenings and studies, field inspections, verification of existing conditions, pilot studies, surveying and mapping, community relations, construction-phase services (engineering design during construction, checking design drawings), archaeological investigations and mitigation, wetlands determination and mitigation studies, storm water design (including drainage studies and hydraulic modeling), evaluations of green technologies and energy conservation measures, and other related services. 2. Primary Selection Criteria: Selection of the firms will be based on the following primary criteria, listed in descending order of importance, first by major criterion and then by each sub-criterion. Additional consideration will be given for experience and qualifications by the prime or Joint Venture. Criteria A through E are primary criteria and will be evaluated for all offerors. (A) Specialized experience and technical competence of the firm demonstrated during the past five (5) years in the broad range of HTRW/environmental work required for this contract. Firms will be evaluated for experience and competence in areas 1 through 4, below. The most highly qualified firms will have extensive experience in all of the following areas: 1. Investigation, groundwater modeling, design, construction phase services, and preparation of CERCLA/RCRA documents for a variety of hazardous, toxic, and radioactive waste and other environmental projects. Experience must demonstrate wide-ranging capabilities, complex and diverse projects, and differing contaminants in various media. Firms should demonstrate the extent of their capabilities to serve projects located in the USAGE NWD. The basis of the evaluation will be the information in Section F of the SF 330. 2. Knowledge of and adherence to regulations and practices pertaining to studies, investigations and remediation including Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), Resource Conservation and Recovery Act (RCRA), Toxic Substance Control Act (TSCA), Clean Water Act (CWA), and National Environmental Policy Act (NEPA). The basis of the evaluation will be the information in Sections F and H of the SF 330. 3. Demonstrated quality management processes and procedures that result in quality end products. Include a narrative description of quality management procedures and implementation to include internal quality control, responsibilities, and a proposed organization chart. The basis of the evaluation will be the information in Sections F and H of the SF 330. 4. Capability in managing cost-reimbursable contracts. The Prime/JV A-E firm should demonstrate experience with a cost accounting system for cost reimbursable contracts with the government. The basis of the evaluation will be the information in Section H of the SF 330. (B) Professional qualifications of a firm's staff and team consultants to be assigned to this contract. The education, training, professional registration, proposed job title, overall and relevant HTRW and environmental experience, longevity with the firm, and experience of key personnel will be considered. This criterion is primarily concerned with the qualifications of the key personnel and not the number of personnel. The number of personnel is addressed under the capacity criterion below. Responding firms should demonstrate the professional qualifications of their staff in these key disciplines, which are listed in descending order of importance. List professional registrations, if applicable, for the key disciplines: (1) Project Management; (2) Hydrogeology I Geology; (3) Civil/Geotechnical Engineering; (4) Chemistry; (5) Chemical I Process Engineering; (6) Risk Assessment; (7) Cost Engineering; (8) Environmental Engineering; and (9) Industrial Hygiene. The basis of the evaluation will be the information in Sections E, G, and H of the SF 330. (C) Past performance on DoD and other contracts with respect to cost control, quality of work, management/business relations, and compliance with performance schedules. Architect-Engineer Contract Administration Support System (ACASS) merged into a single application under the Contractor Performance Assessment Reports System (CPARS). CPARS is the primary source of information on past performance. CPARS will be queried for all firms submitting a SF 330. Each project in Section F of the SF 330 shall include owner's contact information. If deemed appropriate by the evaluation board, performance evaluations for any significant team subcontractors may also be considered. The board may seek information on past performance from other sources, but is not required to seek other information on the past performance of a firm, if none is available from CPARS. When evaluating past performance, the board will consider the relevancy of performance evaluations on A-E services contracts to the proposed contract, including the type of work, performing office, age of the evaluation, and whether subsequent evaluations indicate a change in a firm's performance. (D) Capacity: The board will consider available capacity of key disciplines identified above from the Prime/JV and its team consultants to perform work in the required time. The basis of the evaluation will be the information in Section H and Part II of the SF330. (E) Knowledge of the Locality: The board will evaluate a Prime/JV's familiarity with local conditions. Examples include knowledge and experience dealing with geological features and the state/ local regulatory agencies. Work under these contracts may be in a widely dispersed geographic area, therefore, responding firms should demonstrate the extent of their capabilities to serve projects located throughout the USAGE NWD. The basis of the evaluation will be the information in Sections E, F, and H of the SF 330. 3. Secondary Selection Criteria: The following secondary criterion will only be used as a tie-breaker among technically equal firms. The secondary criterion will not be co mingled with the primary criteria in the evaluation. The secondary criterion is the Volume of DoD A-E Contract Awards in the last 12 months. Responding firms should cite all contract numbers, task orders and modifications, award dates and total negotiated fees for any DoD A-E contract awarded within the past twelve (12) months. This information will assist in effecting an equitable distribution of DoD A-E contracts among qualified firms. The basis of the evaluation will be the information in Section H of the SF 330. 4. Submittal Requirements: Interested firms having the capabilities to perform this work must submit one (1) original plus five (5) copies and one (1) CD or DVD with searchable Adobe PDF files of one SF 330 (03/2013 edition) for the prime firm that includes all team consultants. Include the firm's DUNS number and CAGE codes in the SF 330, Part I, Sections B and C. A maximum of ten (10) projects for the proposed team, including joint ventures and teaming partners, shall be shown in Section F. For the ten (10) projects submitted in Section F of the SF 330, a "project" is defined as work performed at one site or at a single installation. An IDC contract is not a project. A project may contain multiple task orders or contracts if they are for multiple phases of the project at the same site or installation. Project descriptions shall clearly state extent of work performed by the team, extent of work completed, and dates of completion. If the offeror provides a specific task order as its "project," it shall provide the base contract number(s) and the task order number(s) for reference purposes. If the offeror provides a site-specific contract as its "project," it shall provide the contract number for reference purposes. Firms should include information regarding the Secondary Selection Criteria in Section H of the SF 330. The SF 330 shall have a total page limitation of 80 printed pages with Section H limited to fifteen (15) pages, and Part II is excluded from the 80 printed page limit. Double-sided sheets will count as two pages. Page sheets of 11 inches X 17 inches will be counted as two (2) pages if printed on one side, and four (4) pages if printed on both sides. For all SF 330 sections, use no smaller than 10 pt. font. Solicitation packages are not provided. This is not a request for proposal. Submittals must be mailed or delivered to the following address not later than 27 May 2016, 2:00 pm Central Time (no faxed or other electronic submittals will be accepted): U.S. Army Corps of Engineers, Kansas City District Attn: CECT-NWK-H (Robert Johnson) 601 East 12th Street Kansas City, MO 64106-2896 (816) 389-2281 Submit questions, in writing only, to Robert Johnson at Robert.F.Johnson@usace.army.mil and William (Josh) Hill at William.J.Hill@usace.army.mil. Questions must be submitted in no later than 2 May 2016 and must contain the solicitation number in the subject line of the e-mail. Contracting Office Address: U.S. Army Corps of Engineers, Kansas City District 601 East 12th Street (Room 647) Kansas City, MO 64106-2896

More opportunities from Department Of Defense → W071 Endist Kansas City

Same awarding agency

NAICS: 237990
New
Federal
Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)
Solicitation # W912DQ26RA065
The U.S. Army Corps of Engineers, Kansas City District, is soliciting design-build construction services for the installation of access manholes at the Fairfax-Jersey Creek Levee Unit on the Missouri River in Kansas City, Kansas. The project scope involves designing and constructing manholes, with estimated depths between 10 and 25 feet, to facilitate the video inspection of approximately 27,000 feet of existing perforated corrugated metal seepage collector pipe. To maintain levee integrity, the government strictly prohibits invasive mass excavation methods such as trenching, requiring the use of minimally invasive excavation techniques. Key deliverables include a Drilling and Invasive Program Plan approved by a licensed professional engineer or geologist, temporary flood protection plans, and final as-built drawings. This is a firm-fixed-price contract with an estimated magnitude between $1,000,000 and $5,000,000, though the total award amount shall not exceed $3,400,000. The acquisition is categorized under NAICS code 237990 with a small business size standard of $45 million. The selection process is conducted in two phases; Phase 1 focuses on qualifications and technical approach without pricing, from which up to three qualified offerors will be selected for Phase 2. Evaluation factors include design concepts, performance confidence, technical approach and qualifications, and small business participation, with non-price factors being significantly more important than price. Proposals must be submitted via the PIEE Solicitation Portal and adhere to strict documentation requirements, including the use of specific government templates for vendor information, experience, and technical qualifications.
Other Heavy and Civil Engineering Construction

POSTED

about 11 hours ago

DEADLINE

in 6 days
View Details
NAICS: 237110
New
Federal
Atchison Storm Sewer Separation Improvements, Atchison, Kansas
Solicitation # W912DQ27BA002
The U.S. Army Corps of Engineers, Kansas City District, is soliciting bids for the Atchison Storm Sewer Separation Improvements project in Atchison, Kansas. This small business set-aside construction project, identified by solicitation number W912DQ27BA002, has an estimated value between 1 million and 5 million dollars. The scope of work involves the construction of new and improved storm sewers, the removal of existing storm and sanitary sewers, and the installation of reinforced concrete pipe, reinforced concrete box culverts, and storm water inlets or junction boxes. The contractor is responsible for providing all necessary labor, equipment, and supervision, as well as performing incidental restoration of pavements, sidewalks, driveways, and parkways. The project is structured as a firm-fixed-price contract with two primary line items: the 16th Street Alignment and an optional 15th Street Alignment. Performance requires adherence to City of Atchison Public Works Specifications and ASTM standards, with all testing laboratories validated by the USACE Material Testing Center. Key administrative requirements include the submission of an initial project schedule within 42 calendar days of the notice to proceed and the hosting of a partnering session within 45 calendar days of award. Bids must be submitted by November 13, 2026, and must include a completed Standard Form 1442 and required bid bonds. This heavy construction project is subject to the Davis-Bacon Act and EM 385-1-1 safety and health information.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 24 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS