Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Pennsylvania was posted on November 14, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Oak Alley ADA Trail Improvements

Closed
PennBid: 161553State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Borough of Topton is inviting sealed bids through the PennBid Program for the Oak Alley ADA Trail Improvements project, with submissions due by 3:00 PM on December 5, 2024. The scope of work encompasses all necessary labor, materials, and permits to remove existing vegetation, site furnishings, and signage incompatible with the final design, as well as sawcutting and removing asphalt pavement, concrete curb, and sidewalk for replacement. The project includes relocating utilities, constructing new concrete curb and sidewalk, installing ADA curb ramps, restoring pavement and disturbed areas, and adding signage, drainage, and landscaping. An alternate bid is also solicited for additional ADA curb ramps, speed humps, pavement markings, and traffic signage on S. Callowhill Street. Bidding documents are available at no cost online starting November 14, 2024, and bids must be accompanied by a 10% bid bond. The successful bidder will need to provide a performance and payment bond equal to 100% of the contract amount. A pre-bid meeting is scheduled for November 21, 2024, at the project site, with questions due by November 22, 2024. The Borough retains the right to accept or reject any bids and to waive informalities, with final award decisions subject to a sixty-day review period. The project is estimated to be within a contract size range of $500,000 to $1,500,000, and prevailing wage rates will apply throughout the project.

General Info

Place of Performance

PA, USA

Set-Aside

NONE

Documents

4
PDF, High priority: read this firstamendment
High
XLSX, High priority: read this firstbid-tabulation
High
PDF, High priority: read this firstitb
High
PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyPennsylvania → Borough of Topton, Berks County
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Notice is hereby given that the Borough of Topton will receive sealed bids online via the PennBid Program (http://pennbid.bonfirehub.com) until 3:00 PM prevailing time on Thursday, December 5, 2024, for the Oak Alley ADA Trail Improvements. The work includes but is not limited to all labor, materials, tools, oversight and permits required to remove existing vegetation, site furnishings and signage not conducive to the final design, sawcut and remove asphalt pavement, concrete curb and sidewalk for replacement, remove existing utilities for relocation and adjustment; and construct or install new concrete curb and sidewalk, ADA curb ramps, full depth pavement restoration, utility relocation and reset existing utilities to finish grade, signage, drainage and landscaping, and restore disturbed areas to lawn; add alternate bid of additional ADA curb ramps, speed humps, pavement markings, and traffic signage on S. Callowhill Street. All bidding documents will be available online at no cost via the PennBid Program (http://pennbid.bonfirehub.com) beginning at 12:00 PM on Thursday, November 14, 2024. Bids must be accompanied by a bid bond with a corporate surety authorized to do business in Pennsylvania, in accordance with the project specifications in the amount of 10% of the total bid amount. A Performance and Payment Bond in the amount of 100% of the contract shall be furnished by the successful bidder as detailed in the Instructions to Bidders. Prevailing Wage Rates shall apply. Immediately following the due date and time, all bids received through PennBid will be opened online at the Engineer’s Office and referred to the Borough for final award. An abstract of the bids received will be available to bidders on PennBid following the date and time that bids are due as indicated above. A pre-bid meeting will be held at 11:00 AM on Thursday, November 21, 2024, at the Project Site located at 205 S. Callowhill Street, Topton, PA 19562. All bidders are encouraged to attend. Questions may be submitted through PennBid’s “Messages/Public Q&A” tab on or before 3:00 PM on Friday, November 22, 2024. Responses will be provided via PennBid to all registered parties. The Borough reserves the right to accept or reject any or all bids or portions or to waive any informalities in bidding and to withhold award for a period of sixty days.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS