Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

OASAS C.K. Post Addiction Treatment Center No. 854 Roof Replacement and Asbestos and HAZMAT Abatement - Project No. 388420

Active
2140035State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Dormitory Authority of the State of New York is seeking Expressions of Interest for the roof replacement and hazardous materials abatement project at the C.K. Post Addiction Treatment Center No. 854 in West Brentwood, New York. The estimated cost for the project ranges from 6.2 million to 6.8 million dollars. The scope of work includes the removal of the existing roof and installation of a fluid-applied polymethyl-methacrylate roofing system with R-33 ci insulation and a 30-year warranty. Additional requirements include replacing the coping and fascia assemblies, updating scuppers and conductor heads, installing stainless steel counter flashing, providing fluid-applied flashing at mechanical equipment curbs, replacing guy wire support anchors, updating hollow metal doors, replacing a ship ladder, installing free-standing guardrails and walkway protection pads, and repairing cracked or spalled concrete decks. This is a two-stage qualification process where firms must submit a comprehensive EOI package to be considered for a shortlist and subsequent invitation to bid. The EOI package must be organized into ten specific tabs covering company profile, five years of relevant experience, sample project schedules, safety programs, team résumés, potential subcontractors, anticipated workload, experience modification rating, bonding capacity, and a certified NYS Vendor Responsibility Questionnaire. The project includes specific socioeconomic goals, including a 45 percent minority and women workforce goal, an 18 percent MBE goal, a 12 percent WBE goal, and a 6 percent SDVOB goal. All submissions must be sent via email to the designated procurement administrator, and firms must ensure they receive a confirmation of receipt to be considered responsive.

General Info

EOI for roof replacement and hazardous materials abatement at C.K. Post Center.

NAICS

N/A

Place of Performance

C.K. Post Treatment Center, Building 1, 998 Crooked Hill Road, West Brentwood, New York 11717, NY, USA

Set-Aside

NONE

Documents

1

OASAS C.K. Post Addiction Treatment Center No. 854 Roof Replacement and Abatement

PDF, High priority: read this firstrfi
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSources Sought
Posted

Sources Sought

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDormitory Authority of the State of New York
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
Dominick DonadioSr. Procurement Administrator
Dominick DonadioSr. Procurement Administrator

Full Description

Show more
THIS SOLICITATION IS FOR EXPRESSIONS OF INTEREST (EOI) ONLY See the Eligibility Requirements further down in this document. 1. Remove existing roof and replace with fluid-applied polymethyl-methacrylate (PMMA) roofing system with R-33 ci insulation and associated fluid-applied PMMA flashing system. The new roof system will have a 30-year warranty. 2. Remove existing coping/fascia assembly and provide aluminum coping system at main roof parapet. Raise the height of the low parapets to accommodate the new roof assembly and meet the minimum flashing height requirements. 3. Remove existing fascia assembly and provide aluminum fascia system at fire stair tower roof edge. 4. Remove and replace scupper and conductor head. 5. Remove and replace stainless steel counter flashing along base of attic walls. 6. Provide fluid applied flashing at mechanical equipment curbs and roof penetrations. Provide additional wood blocking to increase curb height. Provide pipe extensions to meet code requirements. 7. Remove and replace guy wire support anchor. 8. Remove and replace hollow metal doors and raise the door curb. 9. Remove and replace ship ladder in the center attic. 10. Provide free-standing guardrails along roof edge. 11. Provide walkway protection pads. 12. Repair cracked and/or spalled concrete deck. 13. Hazardous materials abatement. Estimated Cost Range: $6,200,000 to $6,800,000 Bidders for the construction of this project will be selected only after the review and evaluation of the qualification packages received in response to this notice. Please note that the project drawings and specifications attached to DASNY’s website associated with this solicitation do not reflect 100% construction / bid documents. The documents provided are for reference only. Finalized construction / bid documents shall be distributed to the qualified contractors invited to bid. Please find links to the specifications and drawings below: Project Manual Drawings General Conditions for Construction dated February 4, 2026, will apply to the Contract Documents. The anticipated goals for EEO and M/WBE participation in the Work of the Contract are as follows: Percent of Total Work Force (EEO): Minority & Women Workforce Goal (for all trades) 45% Percent of Total Contract (M/WBE): Minority Business Enterprise Goal 18% Women's Business Enterprise Goal 12% Service-Disabled Veteran Owned Businesses 6% Please note the Owner will determine the goals for EEO and M/WBE participation when the finalized construction / bid documents are distributed to the qualified contractors invited to bid. Firms shall provide one (1) copy in pdf format of the EOI package via e-mail to ccontracts@dasny.org. Upon receipt, confirmation of delivery will be provided by email for each submission. If a firm does not receive confirmation of receipt, the EOI package shall be deemed not received. Firms are responsible for ensuring that confirmation of receipt is obtained and should follow up promptly if confirmation is not received. Instructions for Submission of the EOI Packages: Each firm responding to this solicitation shall submit an EOI package organized and assembled in a clear, logical and professional manner consistent with the requirements set forth herein. Failure to comply with these instructions may render the submission non-responsive and subject to rejection. Each package shall be submitted with: 1. A Cover Page that clearly identifies: · The Legal Name of the Company submitting the EOI · The Project Name for which the EOI is being submitted · The Date of Submission 2. Immediately following the Cover Page, the contractor shall provide a Table of Contents listing all Tabbed sections, exhibits and attachments contained in the submission with the corresponding page number. 3. The EOI package shall be divided into clearly labeled tabbed sections, each separated by a Cover Sheet identifying the contents that follow. Tabs should correspond to the order of the items specified in the solicitation. 4. All items outlined in each Tab must be provided. The Owner may reject any EOI package not prepared and submitted in accordance with the provisions as stated in this solicitation. Tabs must be in the following sequence: Tab 1 – Company Profile Provide a company profile that includes the following information: · Company Contact – Name, Title, E-mail address, and Phone Number of primary point of contact for this project. · Date Established – When the company was founded. · Company Address – Primary business location. · Ownership Information – Name and resumes of all principal owners. · Client List – Summary of public and private sector clients. · Employee Breakdown – Number of employees by role: Architects, Engineers, Project Managers, Administrative Staff, Superintendents and Foremen, Trade Laborers. · Equipment - Overview of all equipment owned by the company. · Self-Performed Services - Description of all services the company performs directly (not subcontracted). Tab 2 – Experience Provide documentation showing a minimum of five (5) years of experience with projects similar in size, scope, and complexity to the one being proposed. Provide details for the five (5) relevant projects that have been completed- or substantially completed- within the last ten (10) years. For each project, include the following information: · Name of the project designer · Firm name and contact information · Project title and location/facility · Brief description of the project · Total construction cost · Construction start date · Substantial completion date · Indicate role as prime contractor or subcontractor · Percentage of the work that was self-performed If applicable, also include a list of all DASNY projects completed within the last 5 years. Tab 3 – Project Schedules Provide three (3) sample project schedules for the same projects listed in Tab 2. These schedules should reflect projects of similar size, scope, and complexity to the referenced project. Tab 4 – Safety Program Provide the firm’s written safety program or site safety plan. Include the résumé of the person responsible for overseeing project safety. Tab 5 – Résumés Provide names and résumés for the proposed project team. Each résumé should demonstrate experience with at least one project of similar size, scope, and complexity to the referenced project. Team members should include, at minimum: Project Manager, Site Superintendent, Project Engineer, and Quality Control Representative. Tab 6 – Potential Subcontractors Provide a list of potential subcontractors for this project. For each potential subcontractor, identify anticipated M/WBE subcontract participation, the subcontractor’s trade, and brief description of their scope of work. Tab 7 – Anticipated Workload Provide a list other projects you firm will be working on during this project’s construction period. Include a statement explaining how your firm will successfully complete this project within the required timeframe. Tab 8 – Experience Modification Rating Provide a letter from your insurance provider indicating the firm’s Experience Modification Rating (EMR) over the past three (3) years. If your EMR is above 1.00, include a written explanation. Tab 9 – Bonding Capacity Provide a signed letter from a Surety Company attesting to your firm’s single, aggregate and available bonding capacity. If your available bonding capacity does not to meet the bonding requirements of this contract, you must explain how your firm will meet the bonding requirements. Tab 10 – NYS Vendor Responsibility Questionnaire Provide your online or hardcopy NYS Vendor Responsibility Questionnaire For-Profit Construction (CCA-2) certified within the last five (5) months. Firms shall provide the Certification page for the online version or the full questionnaire, if submitting a hardcopy. Eligibility/Qualifications Requirements/Preferences: Tabs 1 through 7 will be scored by a DASNY committee. Firms deemed qualified from this solicitation will be included on a short list and invited to submit a bid in the near future. Firms not following the EOI package requirements as noted shall be considered non-responsive to the advertisement. The construction contract will be held by DASNY. Contract Security, EEO/AA Insurance, NY State Vendor Responsibility Questionnaire (Executive Order 125). See Contract Documents for details. In accordance with State Finance Law § 139-j and § 139-k, this solicitation includes and imposes certain restrictions on communications between Dormitory Authority personnel and an Offerer during the procurement process. Designated staff for this procurement are: The Project Manager and ccontracts@dasny.org. Contacts made to other Dormitory Authority personnel regarding this procurement may disqualify the Offerer and affect future procurements with governmental entities in the State of New York. Please refer to the Authority's website (www.dasny.org) for Authority policy and procedures regarding this law, or the OGS website (www.ogs.state.ny.us/aboutogs/regulations/defaultAdvisoryCouncil) for more information about this law. All proposers, domestic and foreign, must be in compliance with New York State business registration requirements. Contact the NYS Department of State regarding compliance. In addition, business entities proposing to provide professional engineering services must obtain a Certificate of Authorization to Provide Engineering Services in New York State from the State Education Department. Proposals must be submitted in the full legal name of the proposer, or the full legal name plus a registered assumed name of the proposer, if any.

More opportunities from Dormitory Authority of the State of New York

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS