Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Colorado was posted on June 18, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

OC 2024-053M23 Kiva Wheeler Roof Replacement

Closed
IFB1-GJHA-2024000226-3State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
Inland Empire Job Corps-Request for Quote Roof Design & Build
Solicitation # inland-empire-job-corps-request-quote-roof-design-build
Management & Training Corporation is seeking quotes for a fixed-price design-build subcontract to construct an over-build enclosure for the lower roof of Building G at the Inland Empire Job Corps Center in San Bernardino, California. The project involves designing and installing a roof covering approximately 800 gross square feet, featuring a 3% sloped roof with a single ply, EPDM 60 mil roofing system over wood or metal decking. The scope includes structural framing that extends existing bearing walls or utilizes a new post-beam system, the installation of three LED strip light fixtures with one emergency backup, and strict adherence to OSHA safety standards and the Architectural Barriers Act Accessibility Standard of 2007. The total period of performance is 240 days, with a requirement to complete the work within 100 consecutive business days following the Notice to Proceed. Bids are due by November 2, 2026, and will be evaluated based on overall best value. This is a small business set-aside opportunity open to various SBA certifications. For bids equal to or greater than $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. Bidders must conduct a physical site visit and sign an attendance roster to be eligible. The project is subject to Construction Wage Rate Requirements, necessitating compliance with California prevailing wages and the submission of weekly certified payroll reports. Additionally, all inspections and testing must be conducted by an independent, third-party agency registered in California. Required insurance minimums include 1 million dollars per occurrence for general liability, 1 million dollars for auto, and 500,000 dollars for workers compensation.
Inland Empire Job Corps

POSTED

12 minutes ago

DEADLINE

in 4 days
NAICS: 238160
New
SLED
47971 CONSTRUCTION
Solicitation # 47971 - C
Solicitation 47971-C is a construction project issued by the New York State OGS Design and Construction for the replacement of the roof and associated mechanical systems at the Troop F Headquarters in Middletown, New York. The scope of work encompasses comprehensive architectural, electrical, and structural modifications, including the removal of specific skylights and roof framing, the application of various waterproof and general surface finishes, and abatement work related to the first-floor reflected ceiling plan. Electrical requirements include the installation of keyed systems, the relocation of equipment for HVAC engineers, and the installation of permanent conductive fiber optic cables. The contractor is responsible for providing all necessary tools, equipment, and materials, as well as procuring all permits required for the final certificate of occupancy. All work must adhere to applicable building codes, local safety and zone differential regulations, and manufacturer recommendations. Key deliverables include the final inspection of roof trusses, sheathing, tiles, gutters, downspouts, and storm drainage systems, with final acceptance of the fastening system requiring written approval from the Owner and Architect. The solicitation was posted on October 16, 2026, with a response deadline of November 18, 2026.
NYS OGS Design & Construction - Construction Contractors

POSTED

about 3 hours ago

DEADLINE

in 20 days

General Info

Place of Performance

CO, USA

Set-Aside

NONE

Documents

7

01 23 00 Alternates - Otero College Roofing Repair

PDF, High priority: read this firstalternates
High

2024-053M23 Kiva Wheeler Roof Replacement Project Manual Bid Set

PDF, High priority: read this firstrfp
High

Kiva Wheeler Roofs sbp-6.131 Bid Alternates Form

PDF, High priority: read this firstbid-alternates
High

OC Kiva Roof Replacement Drawings Bid Set 4-2-24

PDF, High priority: read this firstcontract-document
High

OC Wheeler Roof Replacement Drawings Bid Set 4-2-24

PDF, High priority: read this firstcontract-document
High

Response To Bid Questions - Replace Roofing Kiva & Wheeler Hall

PDF, High priority: read this firstq-and-a
High

2024-053M23 Kiva Wheeler Roof Replacement Mandatory Pre-Bid Sign-In

PDF, Low prioritypre-bid-sign-in
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyColorado → Otero Junior College
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Jennifer Johnston

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS