This Government Contract opportunity from California was posted on January 2, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Office Space and Classroom Tenant Improvement
Closed
01-0094State & LocalSubmission Closed
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Agency
Purchasing and Procurement Department of University of California College of the Law San FranciscoView Agency
NAICS
N/A
Place of Performance
200 McAllister St. San Francisco, CA 94102 Main Lobby, CA, USSet-Aside
NONE
Documents
(11)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
PhaseClosed
Submission Closed
Organization & Contact Information
Show more
AgencyPurchasing and Procurement Department of University of California College of the Law San Francisco
Contacts1 person available
OfficeCA, US
Organization / Agency
Purchasing and Procurement Department of University of California College of the Law San Francisco
View Agency ProfileOffice AddressCA, US
Contacts
Full Description
Show more
Scope: Project Location
Campus of UC Law SF (formerly UC Hastings) in downtown San Francisco Location on campus: Within second floor of the ‘Academe at 198’ mixed-use academic and housing building, completed in 2023 and actively in use throughout the duration (address: 198 McAllister Street)
Project Scope
Tenant improvement of just over 3,000 square feet across two existing shell spaces on an academic non-residential floor Shell space 1: Divide into two ~30-seat classrooms Shell space 2: Open office suite with conference room and storage room Additional scope: Install new branding signage for San Francisco State University (SFSU), the intended tenant and user the project, in the existing corridors immediately outside the two shell spaces (determine final design in coordination with owner) Scope excludes furniture and AV devices, but includes AV/power/data pathways to serve OFOI furniture and devices Work includes the following disciplines: architectural/interiors, electrical/data, mechanical, and fire protection Major materials/components include: precise demolition of HVAC and sprinkler components, new mechanical ductwork and grilles, sprinklers, electrical conduit/cabling/receptacles/switches and floor raceway, light fixtures and daylight/motion sensors, alarm devices, BAS integration and telecom panel, display mounts and back-box, new partitions with sound attenuation and wall base, doors and door hardware, interior storefront, ACT, carpet tile, gyp floating and painting, countertop, roller shades, marker boards, minor penetrations into existing fire-rated partitions, and surface-applied branding signage
Schedule
Construction anticipated to take three to four months during the spring and summer of 2026, pending state regulatory approval of construction documents. Schedule must respect the building’s residential quiet hours, which end at 8:00 a.m. each day, and avoid loud construction during three-week final exam period from late April 2026 to early May 2026.
Campus of UC Law SF (formerly UC Hastings) in downtown San Francisco Location on campus: Within second floor of the ‘Academe at 198’ mixed-use academic and housing building, completed in 2023 and actively in use throughout the duration (address: 198 McAllister Street)
Project Scope
Tenant improvement of just over 3,000 square feet across two existing shell spaces on an academic non-residential floor Shell space 1: Divide into two ~30-seat classrooms Shell space 2: Open office suite with conference room and storage room Additional scope: Install new branding signage for San Francisco State University (SFSU), the intended tenant and user the project, in the existing corridors immediately outside the two shell spaces (determine final design in coordination with owner) Scope excludes furniture and AV devices, but includes AV/power/data pathways to serve OFOI furniture and devices Work includes the following disciplines: architectural/interiors, electrical/data, mechanical, and fire protection Major materials/components include: precise demolition of HVAC and sprinkler components, new mechanical ductwork and grilles, sprinklers, electrical conduit/cabling/receptacles/switches and floor raceway, light fixtures and daylight/motion sensors, alarm devices, BAS integration and telecom panel, display mounts and back-box, new partitions with sound attenuation and wall base, doors and door hardware, interior storefront, ACT, carpet tile, gyp floating and painting, countertop, roller shades, marker boards, minor penetrations into existing fire-rated partitions, and surface-applied branding signage
Schedule
Construction anticipated to take three to four months during the spring and summer of 2026, pending state regulatory approval of construction documents. Schedule must respect the building’s residential quiet hours, which end at 8:00 a.m. each day, and avoid loud construction during three-week final exam period from late April 2026 to early May 2026.
