Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on April 4, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Official Letter RFP, Sole Source to On-Point Defense

Closed
SPRRA2-24-R-0051Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336415
New
DIBBS
TUMBLER ASSEMBLY
Solicitation # SPE4A6-27-T-7441
Solicitation SPE4A6-27-T-7441 is a federal procurement issued by the Defense Logistics Agency (DLA) Weapons Support ASC Commodities Division for the supply of 75 Tumbler Assemblies (NSN 1440-01-725-5238). The items must be manufactured in accordance with Reference Drawings 98747 201717861 and 98747 201824601, both Revision A. The contract specifies a delivery timeline of 369 days after order, with FOB and inspection/acceptance points set at the origin. A critical requirement includes the delivery of one unit for First Article Testing (FAT) within 90 calendar days of the contract date to Hill AFB, Utah. The government will add a testing cost of 1,774.00 dollars to the offered price during the evaluation process. The procurement is designated as a Total Small Business Set-Aside under NAICS code 336415. Quality standards require the manufacturer's inspection system to comply with SAE AS9003 or ISO 9001 tailored to SAE AS9003, with sampling conducted per MIL-STD-1916 or ASQ H1331. Due to the nature of the technical data, the contract is subject to strict export controls under ITAR and EAR, requiring contractors to have approved US/Canada Joint Certification Program certification. Additionally, the contract mandates compliance with CMMC Level 2 cybersecurity standards and DFARS 252.204-7012 for safeguarding covered defense information. Packaging must adhere to MIL-STD-129 and DLA Master List requirements, with specific standards for hazardous materials under TQ requirement IP025.
DLA WEAPONS SUPPORT ASC COMMODITIES DIVISION

POSTED

about 16 hours ago

DEADLINE

in 7 days
NAICS: 336415
New
Federal
ACTUATOR,ELECTRO-ME
Solicitation # N0010426QXA48
Solicitation N0010426QXA48 is a request for quotation issued by the Navsup Weapon Systems Support Mech for the manufacture and procurement of the Actuator, Electro-Me, identified by NIIN 014850123. The requirement specifies that the item must conform to the design represented by Cage Codes 53711 or 38597, reference number 7104048-19, and utilize Technical Data Package version 008. The government will award a firm-fixed-price contract to a responsible offeror based on best value, evaluating price, past performance, and supplier performance risk. Only authorized sources or distributors providing official OEM authorization will be considered for award. The contract mandates strict adherence to quality and packaging standards, including MIL-STD-129 for marking and MIL-STD-2073 for preservation. All shipments must be processed via the Wide Area Workflow system for payment and receiving reports. Key delivery requirements include a 30-day lead time and compliance with specific packing levels for CONUS and OCONUS shipments. The offer due date has been extended to November 27, 2026, and submissions must be sent electronically to the primary point of contact, Darian M. Holley. Additional requirements include compliance with DFARS cybersecurity standards and the provision of material safety data sheets for any hazardous materials delivered.
Navsup Weapon Systems Support Mech

POSTED

about 21 hours ago

DEADLINE

in 30 days

General Info

NAICS

336415 - Guided Missile and Space Vehicle Propulsion Unit and Propulsion Unit Parts Manufacturing

Place of Performance

Fort Walton Beach, FL, USA

Set-Aside

NONE

Documents

1

PWS - Repair and Return Program (Improved Bradley Acquisition Subsystem)

DOCX, High priority: read this first8 pages · sow
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Al DLA Aviation At Huntsville
Contacts1 person available
OfficeREDSTONE ARSENAL, AL, 35898-7340, USA
Office AddressREDSTONE ARSENAL, AL, 35898-7340, USA
Contacts
Anna Phillips

Full Description

Show more
April 03, 2024 On-Point Defense Technologies 737 Hollywood Boulevard Fort Walton Beach, FL, 32458 RE: Letter Request for Proposal (RFP) SPRRA2-24-R-0051 Mr. John Diesel, The Defense Logistics Agency (DLA) intends to create a new subsumable contract and award it against the On-Point Defense Long Term Contract, SPRRA2-23-D-0004. These parts will support the Improved Bradley Acquisition Subsystem. See ATTACHMENT 0001 - Performance Work Statement DLA Contracting Team Identification: Mallory Medley, DLA Aviation- Huntsville Contracting Officer E-mail: contact@example.gov, Phone: +1 (555) 000-0000 Anna Phillips, DLA Aviation- Huntsville Contract Specialist E-mail: contact@example.gov, Phone: +1 (555) 000-0000 A. Please adhere to the following timelines: 1. Indicate your intention to provide a responsive add-on proposal to this RFP in writing within five (5) business days. It is requested that a negative response be accompanied by an explanation. Responses shall be provided to the contracting team identified above. 2. Your response is requested as soon as possible. If you choose to submit an add-on proposal, it shall be submitted before 4:00 p.m. Central Standard Time (CST), May 03, 2024. B. Instructions: 1. The Umbrella contract (SPRRA2-23-D-0004) shall govern the Contractor's and Government's rights and obligations. 2. Contract clauses are governed by the Umbrella contract, SPRRA2-23-D-0004. 3. This RFP is not an authorization to start work. 4. Please ensure that you read the entire RFP, prior to submitting your proposal. Your proposal shall be in full compliance with the instructions of this RFP. 5. Your proposal shall remain valid for a minimum of one hundred and eighty (180) days from receipt by the government. C. Proposal Content/Cost/Price Supporting Documentation. At a minimum, your proposal shall include the following: 1. The Government contemplates Firm-Fixed-Pricing for this new subsumable effort in accordance with the overarching basic contract, and requests pricing for FY24 & FY25 on only the repair effort at this time. 2. The attached Performance Work Statement provides the outline for the repair effort. a. A FFP price/fee will be established for the tear down, inspect, and evaluation for each part. b. With the evaluation, a report will be provided to the Government detailing the issues identified, along with the cost to repair the item (labor and material). At that time, a FFP will be negotiated to fix the particular part. c. If an item is deemed beyond economical repair, the Contractor will be provided disposition instructions. 3. The offeror shall prepare one summary schedule for the tear down, inspect, and evaluation fee. Along with the summary schedule, the offeror shall provide fully supportable cost data which substantiates the offeror's summary schedule for the P/Ns. a. To comply with this solicitation, the offeror is required to price the tear down, inspect, and evaluation fee at QTY 1 E/A for the parts listed in the SOW. b. Additionally, the offeror is required to propose repair labor wrap rates for FY24 & FY25, for when the evaluation report is provided back to the Government it includes the number of proposed labor hours and material. c. A profit rate shall be agreed upon and established for the repair line. d. The government did not provide separate Subcontract Line-Item Numbers (SLINs) to accommodate items that may require reusable shipping containers. However, if an item requires a reusable shipping container, a SLIN may be added to allow the offeror to price the item with a shipping container. The offeror shall propose the most expeditious delivery schedule for each item. e. An un-sanitized cost breakdown (all cost information, rates/dollars) shall also be provided in a Microsoft Excel File. f. In support of the proposed wrap rates, the contractor(s) shall provide documentation of the most recent Indirect Expense Rates, to include, at least one of the following (A, B, or C): A. Forward Pricing Rate Agreements (FPRAs) with DCAA or DCMA B. Forward Pricing Rate Recommendations (FPRR) from DCAA or DCMA C. Forward Pricing Rate Proposal (FPRP), Approved Provisional Rates Proposal or other statement of current rates including three (3) years of Incurred Cost Submissions to DCAA detailing pools and bases (by expense accounts) information which validates the calculations or Three (3) years historical actual detailing pools and bases (by expense accounts) information which validates the calculations. Note: The rates reflected in the FPRA, FPRR, FPRP, Approved Provisional Rates Proposal or other statement of current rates shall directly match the proposed rates as detailed in the proposal. If the rates do not match, the offeror shall provide sufficient detail explaining how the proposed rates are realistic. g. Identify key business unit personnel related to contracting, technical and pricing questions and known DCMA or DCAA business unit points of contact (POCs) to expedite the question/review process. h. In accordance with FAR clause 52.215-22, Limitation on Pass-Through Charges, if On-Point intends to subcontract more than 70 percent of the total cost of work to be performed under the resulting add-on, On-Point shall identify in its proposal a description of the value-added provided by On-Point as related to the work to be performed by the subcontractor(s) as defined by FAR clause 52.215-22. i. On-Point shall identify and address in its proposal all actual or potential Organizational Conflicts of Interests (OCIs), per FAR 9.5, or state that there are no known potential OCIs. If any actual or potential OCIs are identified, then On-Point shall submit a mitigation plan. j. All communications SHALL be submitted in writing ONLY AND directly to the individual(s)s email address identified on the first page of this RFP. On-Point shall not contact any other Government personnel other than the person(s) identified above. Contacting any Government personnel other than the individual(s) identified above could result in an organizational conflict of interest (OCI). k. No assumptions, terms, conditions, caveats or exceptions submitted within your proposal, in response to this RFP, will be accepted or incorporated into the basic contract. All assumptions shall be addressed and/or resolved through the use of the question-and-answer period. Be advised that this requirement has been advertised in SAM.gov website for viewing by the general public. In the event another supplier indicates interest in responding to the requirement as a result of viewing the synopsis, a formal solicitation will be issued to accommodate that supplier.

More opportunities from Department Of Defense → Al DLA Aviation At Huntsville

Same awarding agency

NAICS: 336412
New
Federal
Noun: LINER AND BEARING A NSN:2840009860444 P/N:2-080-120-01
Solicitation # SPRRA1-27-Q-A006
Solicitation SPRRA1-27-Q-A006 is a formal Request for Proposal issued by the Defense Logistics Agency Aviation at Huntsville under Basic Ordering Agreement SPE4A1-22-G-0014. The agency is seeking pricing and delivery terms for 39 units of Liner and Bearing A, identified by NSN 2840-00-986-0444 and Part Number 2-080-120-01, for use in the CH-47 Turbine Engine weapon system. Due to its classification as a Flight Safety/Critical Safety Item, the requirement mandates strict adherence to QE-STD-1 standards, including the submission of a Manufacturing Plan within 30 calendar days of award, First Article Testing, and engineering source approval by the design control activity. Proposals must be submitted via email to the contracting office by December 04, 2026. Required documentation includes a detailed delivery schedule showing lead times and production capacity, as well as certified cost or pricing data for non-commercial items exceeding 10 million dollars. Additionally, the contractor must comply with DFARS 252.211-7003(c)(1)(i) for Item Unique Identification, mandatory serial number reporting, and military packaging standards. Offerors must maintain an active United States/Canada Joint Certification Program certification to access export-controlled data and provide an explicit affirmation that all RFP terms and conditions have been understood and accounted for.
Aircraft Engine and Engine Parts Manufacturing

POSTED

about 21 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 541715
New
Federal
Sole Source to L3Harris ForceX, Inc | VAMPIRE Spares
Solicitation # SPRRA2-27-R-SP05
The Defense Logistics Agency (DLA) is issuing a sole-source solicitation, SPRRA2-27-R-SP05, to L3Harris ForceX, Inc. for the procurement of spares essential to the production of the U.S. Army's Vehicle Agnostic Modular Palletized ISR Rocket Equipment (VAMPIRE) Stalker Weapon Systems. This requirement will be integrated into the existing Subsumable Contract, SPRRA2-25-D-0007, supporting the Portfolio Acquisition Executive (PAE) FIRES Integrated Fires Mission Command (IFMC) Project Office. The acquisition includes a wide array of components such as pallet assemblies, MX-10 RSTA sensors, COFIN and PDB assemblies, FANG box assemblies, EchoShield radars, and various ruggedized computers and cable harnesses. The government seeks firm-fixed, best price/quantity break range pricing for these items. L3Harris ForceX must submit a comprehensive proposal by November 30, 2026, including a summary schedule, detailed cost data in Microsoft Excel format, and a proposal adequacy checklist for offers exceeding the TINA threshold. Key compliance requirements include JCP Certification for export-controlled items, disclosure of any organizational conflicts of interest per FAR 9.5, and a value-added description if subcontracting exceeds 70 percent of the total cost of work. The contract is subject to FAR and DFARS regulations regarding covered telecommunications equipment and pass-through charges.
Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)

POSTED

2 days ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS