This Solicitation opportunity from Ohio was posted on February 22, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Ohio Dept. of Commerce - FY24 - Switch Gear 5-Year Inspection
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Ohio Department of Commerce, through the Ohio State Fire Marshal, is seeking a qualified contractor to perform a comprehensive five-year inspection of switchgear, transformers, and disconnects at their facility. The scope includes detailed testing and inspection of electrical infrastructure, oil sampling from transformers and switchgear, and a thorough report documenting inspection notes, oil sample results, and recommended actions. Oil sampling is a routine part of the maintenance process, with previous tests conducted in 2014 and 2020, including additional analysis in 2020 to investigate elevated hydrogen levels. The work requires careful coordination to ensure safety, likely necessitating a complete power shutdown, which must be scheduled on a pre-arranged weekend. All work must be completed during weekday hours on a designated Saturday, with the contractor responsible for obtaining necessary permits and covering associated costs. Sub-contractors must be approved by the Department of Commerce, and the contract will be awarded based on the best value, considering both price and quality. The bid must include a rate sheet and an itemized quote, and the process begins with a mandatory walkthrough scheduled for February 27, 2024.
General Info
Agency
Place of Performance
OH, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
LineQuantityUnitStock No.DescriptionUnit PriceTotal Price1.1 De-Energize/Re-Energize Fee: Turning Off & On High Power Electrial System/ Verification/ Safety Grounding as Necessary $ - 2. 1 Test & PM Electrical Infrastructure: Inspect outdoor and indoor transformers and switchgear, test indoor circuit breakers with electronic trip, PM outdoor SF6 switches according to OEM standards, includes all tools, test equipment, safety equipment. $ - $ - 3. 1 Misc 1: Oil to top off transformers as requeste; not to exceed 25 gal. Includes tote and shipping $ - $ - 4.5 Comprehensive Transformer Oil Test Package: NETA 2023 MTS standards in use; Transformer oil is tested for all applicable IEEE parameters, an evaluation of condition and next recommended actions are provided in detailed test report $ - $ - 5. 1 Generator Rental $ - $ - 6. $ - $ - 7. $ - $ - 8. $ - $ - Account / Membership Number :Page 1 Subtotal: $ - Username/Password:Order Total : $ - Line Item Totals $ -
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
