Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Department Of Defense was posted on October 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Oiler Hand Component Supplier

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333914
New
International
Design, Supply and Delivery of a Floating High-Capacity Dewatering Pumping System for Al Sheikh Redwan Stormwater Lagoon, Gaza Strip Ibrahima Ndiaye - [email hidden]
Solicitation # REOI
UNICEF is conducting a market survey via a Request for Expression of Interest (REOI) to identify capable manufacturers, distributors, and system integrators for the design, supply, and delivery of a high-capacity floating dewatering pumping system for the Al Sheikh Redwan Stormwater Lagoon in the Gaza Strip. The system is intended to mitigate flood risks by handling stormwater mixed with sewage, sediment, and debris. Technical requirements include heavy-duty, non-clog, self-priming diesel-driven pumps on floating pontoons connected in series to ground-level pumps, with a containerized arrangement for transport and protection. The supplier must provide wear- and corrosion-resistant wetted parts, O&M manuals, tools, a portable fuel analyzer, and spare parts for approximately 5,000 operating hours. The procurement involves delivery to Ashdod Port, Israel, with a requirement that equipment be available for shipment within two weeks of an order. While a local team will handle installation, the supplier is expected to provide remote supervision for installation, commissioning, operator training, and technical support during the first year of operation. Interested parties must submit their information and feedback on indicative requirements—including preferences between a four-pump or two-pump configuration—via a short online Microsoft Form. This REOI serves as a market survey to finalize specifications and does not constitute a formal solicitation; therefore, no prices, brochures, or formal contract clauses are required at this stage. There is no set-aside status specified for this opportunity.
UNICEF

POSTED

about 21 hours ago

DEADLINE

N/A

AI Contract Overview

Show more

This subcontract, titled Oiler Hand Component Supplier, is issued by Construction & Equipment MRO SVC I under the Department of Defense. The selected supplier is responsible for manufacturing or procuring Oiler Hand items for prime contractors fulfilling DLA supply contracts. All deliverables must adhere to RA001 technical requirements and be produced using metal fabrication and marking equipment. Key compliance mandates include marking items according to MIL-STD-129 and ensuring the removal of government identification as per RQ011. The supplier is tasked with delivering properly marked and packaged physical components to the specified destination in Bremerton, Washington. The solicitation was posted on October 1, 2026, with a response deadline of October 13, 2026, falling under NAICS code 333914.

General Info

Supplier manufactures Oiler Hand components for DoD delivery to Bremerton, Washington.

NAICS

333914 - Measuring, Dispensing, and Other Pumping Equipment Manufacturing

Place of Performance

BREMERTON, WA, 98314-6001, USA

Set-Aside

NONE

Documents

This scope was carved out of SPE8E9-27-T-0007.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

OILER HAND

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Diffuser Cleaning and MaintenanceOpen now, due in 57 days
  • Design, Supply and Delivery of a Floating High-Capacity Dewatering Pumping System for Al Sheikh Redwan Stormwater Lagoon, Gaza Strip Ibrahima Ndiaye - [email hidden]Open now
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → CONSTRUCTION & EQUIPMENT MRO SVC I
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies Oiler Hand items for prime contractors delivering DLA supply contracts. Manufactures or procures items meeting RA001 technical requirements and performs marking in accordance with MIL-STD-129. Utilizes metal fabrication and marking equipment to produce lubrication tools. Complies with RQ011 for government identification removal. Delivers physical Oiler Hand items, properly marked and packaged, to the specified destination.

More opportunities from Department Of Defense → CONSTRUCTION & EQUIPMENT MRO SVC I

Same awarding agency

NAICS: 331110
New
DIBBS
PLATE, METAL
Solicitation # SPE8E9-27-T-0479
This HUBZone Set-Aside solicitation, issued by DLA Troop Support Construction & Equipment MRO SVC I, seeks the procurement of 8 units of metal plate (NSN 9535-01-379-9673). The required material is an aluminum alloy with a width of 48 inches, a length of 12 feet, and a cross-sectional thickness of 3.0000 inches, conforming to Alloy 7075, Temper T7351. The procurement is governed by several technical standards, including SAE AMS4078, ASTM B660-23, and ASTM B666/B666M-20. Only suppliers listed on the Qualified Suppliers List for Distributors (QSLD) are eligible for award, and those quoting in compliance with the QSL program are granted a waiver for source inspection. Key delivery requirements include a need ship date of April 26, 2027, and a final delivery date of May 16, 2027, with the destination and acceptance point located at the DLA Distribution Depot Oklahoma at Tinker AFB. The contractor must provide a Certificate of Quality Compliance with every shipment. Packaging must adhere to MIL-STD-2073-1E and ASTM B660 Level A requirements, while marking must comply with MIL-STD-129 and ASTM B666. Specific identification markings, including the DLA contract delivery order number, NSN, and manufacturer details, are required on each unit of issue. Payment and receiving reports must be processed electronically via the Wide Area WorkFlow (WAWF) system.
Iron and Steel Mills and Ferroalloy Manufacturing

POSTED

3 days ago

DEADLINE

in 2 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS