Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from North Carolina was posted on July 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Old Mill Road Sewer Pump Station Force Main

Closed
320-320-140726FDState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes installing a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and a performance period of 560 calendar days for substantial completion. The contract is administered by the City of Belmont with Willis Engineers serving as the project engineer. Award will be granted to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on the submission of required MWBE documentation, including the Good Faith Efforts Form and Table A. Bidders must adhere to strict material standards, specifically using Class 250 ductile iron pipe with Protecto 401 lining. Contractual requirements include the provision of performance and payment bonds, proof of insurance, and compliance with EJCDC standard general and supplementary conditions. Payment is processed via Applications for Payment, with funds becoming due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 5 hours ago

DEADLINE

in 12 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including resurfacing, restoration, and the installation of FRP reinforcing systems and access hatches. Mechanical and infrastructure requirements include the relining, modification, or replacement of steel and ductile iron pipes, installation of valves and piping appurtenances, modifications to sluice gates, and the installation of new slide gates and access platforms. Additionally, the project requires the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, and extensive electrical and instrumentation upgrades, including motor control center component replacement. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of bid. Requested quotes for services and supplies, including lead abatement, metals fabrication, painting, and trucking, are due by November 17, 2026, ahead of the project bid date on November 18, 2026. Any exceptions to standard subcontract documents must be submitted as redlines along with the quote.
Garney Pacific, Inc.

POSTED

about 5 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The Old Mill Road Sewer Pump Station Force Main project, managed by the City of Rocky Mount, North Carolina, involves the construction of a complete and operational force main system. The scope of work requires the contractor to provide all labor, materials, equipment, and supervision to install approximately 3,110 linear feet of 14-inch force main piping using a combination of PVC and ductile iron. Key technical components include directional drilling, steel casing installation, the installation of sewer air release valves, rock excavation as needed, and erosion control. The project is expected to have a duration of approximately 150 days, with work commencing upon the issuance of a Notice to Proceed. The contract is structured as a construction solicitation where the award will be made to the lowest responsive and responsible bidder. Bidders must demonstrate technical and financial capability and comply with strict minority business participation goals under North Carolina General Statute GS 143-128.2. Specifically, contractors must meet a 10% Historically Underutilized Business (HUB) participation goal or submit an affidavit documenting good faith efforts to meet this requirement. Technical compliance is paramount, with specific standards cited for materials, including ASTM and AWWA requirements for pipe integrity and performance. The evaluation process focuses on bid responsiveness, bidder responsibility, and unit pricing accuracy, with no formal trade-off analysis conducted between price and non-price factors.

General Info

Construct 3,110 ft of 14-inch PVC and ductile iron force main with directional drilling and erosion control in Rocky Mount, NC by August 27, 2026.

Documents

1

RFP 320140726FD Old Mill Road Sewer Pump Station Force Main Contract Documents

PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNorth Carolina → City of Rocky Mount
Contacts1 person available
OfficeNC, USA
Office AddressNC, USA
Contacts
Tracy Winfield

Full Description

Show more
The contractor shall provide all labor, materials, equipment, and supervision necessary to construct the Old Mill Road Sewer Pump Station Force Main, including installation of approximately 3,110 linear feet of 14-inch force main piping using PVC and ductile iron, directional drilling, steel casing installation, sewer air release valves, rock excavation (as needed), erosion control, and all related work required for a complete and operational force main system in accordance with the contract documents.

More opportunities from North Carolina → City of Rocky Mount

Same awarding agency

NAICS: 541618
SLED
Three-Year Consolidated Plan for FY 2027-2029 and 2027 Annual Action Plan
Solicitation # 320-081026TW
The City of Rocky Mount is soliciting proposals from qualified firms or individual consultants to develop the 2027-2029 Consolidated Plan and the 2027 One-Year Annual Action Plan. This project is essential for meeting U.S. Department of Housing and Urban Development regulatory requirements, specifically 24 CFR Part 91 and HUD guidance for the eCon Planning Suite. The selected consultant will be responsible for data collection and analysis of demographic and economic conditions, coordinating community engagement and public hearings, and establishing a strategic vision for funding resource allocation. The contract is a fixed-firm price with a maximum budget of 30,000 dollars and an initial term of 12 months, with final draft plans due on or about April 1, 2027. Proposals must be submitted by November 3, 2026, and require both a physical sealed package in a binder no thicker than one inch and an electronic copy via email. Required documentation includes a cover letter, title page, and specific attachments for pricing, acceptance of general terms, and supplemental vendor information. Awards will be based on the highest and best final evaluation, with a local preference policy allowing eligible local bidders to match the price of non-local bidders within five percent or 25,000 dollars. Vendors must certify compliance with North Carolina General Statutes, including E-Verify requirements for employers with more than 25 employees, and adhere to a NET 30-day payment cycle based on monthly invoicing.
Other Management Consulting Services

POSTED

14 days ago

DEADLINE

in 6 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS