Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Minnesota was posted on July 19, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Old Mill State Park Bridge Replacement

Closed
9185005State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center in Glynco, Georgia, is a single firm fixed price contract for the comprehensive interior modernization of Building 262, as well as associated buildings 261 and 263. The scope of work includes replacing corridor and classroom flooring with composite modular materials, fully renovating restrooms by replacing vanities and lavatories, and updating interior surfaces with new paint. Technical upgrades involve installing raised flooring and electrical distribution to support classroom needs, implementing simple dimming controls, replacing lamps, ballasts, and ceiling fans, and replacing variable air volume systems and lighting controls. The project also requires the installation of new signage and the correction of plumbing deficiencies. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the Notice to Proceed. Award will be determined using a best suited negotiate methodology, evaluating price alongside non-cost factors such as past performance and corporate relevant experience. The contractor must provide performance and payment bonds equal to 100 percent of the contract price and adhere to strict quality control standards, including the submission of a Construction Quality Control Plan and the employment of an on-site QC Manager and Project Superintendent until final acceptance. All work must comply with ADA accessibility guidelines and prevailing wage rates as specified in the applicable wage determinations.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 15 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project scope is comprehensive, involving selective demolition, building envelope and roofing repairs, interior reconfiguration, and the installation of new finishes. Critical infrastructure upgrades include new HVAC systems, exhaust extraction, compressed air systems, a full NFPA-compliant fire suppression system, and updated electrical distribution, lighting, and building automation controls. Additionally, the project requires hazardous materials abatement and site improvements, specifically paving, drainage upgrades, and repairs to water, sanitary, and storm systems. The contract is estimated between 10 million and 25 million dollars with a performance period of 730 days after award. Bidders must provide pricing for two primary exhibit line items: building renovation and paving removal and replacement. Award is based on the lowest price. The project is subject to the Davis-Bacon Act and Buy American requirements, with bonding requirements tiered by proposal value, including bid, payment, and performance bonds for projects exceeding 150 thousand dollars. Quality control is managed through a three-phase process requiring a government-approved QC plan, and invoicing is processed monthly via Wide Area Work Flow.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 29 days
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project of the Inland Empire Utilities Agency. This opportunity is specifically set aside for Disadvantaged Business Enterprise (DBE) subcontractors under NAICS code 236220, with the place of performance located in California, specifically within the Riverside or Los Angeles project areas. The solicitation was posted on October 25, 2026, with a response deadline of November 4, 2026. To ensure project financing and avoid being deemed non-responsive, bidders must strictly adhere to mandatory Good Faith Effort (GFE) requirements. Essential documentation that must be included in the bid package includes proof of online solicitation postings for at least 30 consecutive calendar days, evidence of a print newspaper posting for at least one day, and verification that the Small Business Administration (SBA) and Minority Business Development Agency (MBDA) were utilized. While outreach documentation such as call logs or emails may be submitted up to three business days after the bid closing date, failure to meet the other GFE requirements prior to the opening date will result in the bid being rejected.
RT CONTRACTOR CORP

POSTED

about 2 hours ago

DEADLINE

in 9 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, standing-seam roofing, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide range of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid invitations and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 2 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that impacted the first, second, and third floors, including dormitories, offices, and medical areas. The scope of work requires the contractor to restore affected areas to their original condition through architectural repairs, including drywall replacement, painting, ceiling tile and flooring installation, rubber wall base installation, electrical repairs, and the replacement of vanities and cabinets. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within 15 days thereafter. Award will be based on best value, with evaluation weighted toward price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Required submissions include a detailed cost breakdown, a timeline for substantial completion, a 90-day bid guarantee, a valid Massachusetts Contractor's License, and wage rate certification. Contractors must comply with OSHA, EPA, NFPA-101 Life Safety Code, and ADA standards, as well as all applicable local and state laws. The contract is subject to the Davis-Bacon Act, requiring a minimum wage of 13.65 per hour and specific paid sick leave accruals. Insurance requirements include automobile liability coverage of 200,000 per person and 500,000 per occurrence, with Adams and Associates, Inc. named as an additional insured. Workmanship is guaranteed for one year, and payment terms are Net 30.
Grafton Job Corps

POSTED

about 2 hours ago

DEADLINE

in 22 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
The P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut, is a comprehensive construction effort managed by J & J Contractors, Inc. The scope of work involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine, along with a new Ordnance Operations building, Truck Inspection area, and Sentry building. Key technical requirements include the installation of overhead cranes, intrusion detection systems, grounding and lightning protection, and specialized foundation work utilizing rigid inclusions and load transfer mats. The project also necessitates the demolition of 18 existing magazines and two buildings, as well as extensive sitework involving rock excavation, grading, and wetland mitigation. The contract spans a duration of 1828 calendar days and covers a wide array of trades, including demolition, abatement, structural steel, electrical utilities, and mechanical systems. Infrastructure improvements include the development of access roads, paved loading areas, and telecommunications systems. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Interested parties must coordinate with the primary point of contact, Rahul Maheshwari, to obtain bid invitations and access necessary documentation before the response deadline of October 31, 2026.
J & J Contractors, Inc

POSTED

about 2 hours ago

DEADLINE

in 5 days

AI Contract Overview

Show more

This contract pertains to the replacement of the Old Mill State Park Bridge, with a focus on projects that favor Targeted Groups, including economically disadvantaged and veteran-owned businesses. The scope involves demolishing the existing 72-foot suspension bridge, constructing new concrete abutments and footings, and installing 180 linear feet of H-piling. Additionally, the contractor will install an owner-provided 100-foot steel truss bridge and complete related earthwork and trail construction leading to the bridge. The project is scheduled with key milestones: abutment and earthwork construction should be substantially completed by October 24, 2024, with final completion by October 31, 2024. The bridge setting work is to be substantially finished by July 11, 2025, and fully completed by July 18, 2025. The plans and specifications are provided by the Minnesota Department of Natural Resources. The contract, managed by the Minnesota Department of Administration, has an estimated value between $500,000 and $1.5 million, and the project response deadline is August 1, 2024. The primary contact for the project is Jeff Erickson, reachable via email or phone.

General Info

Agency

Minnesota Department of Administration

Place of Performance

MN, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMinnesota Department of Administration
Contacts1 person available
OfficeN/A
Organization / Agency
Minnesota Department of Administration
Office AddressN/A

Full Description

Show more
State Project No. 2024-954-8P480 This Project is Targeted Group (TG) Economically Disadvantaged (ED) Veteran-Owned preference. A. The work will be completed under one prime contract. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Demolish and remove existing 72' suspension bridge 2. Construct new concrete abutments and footings. 3. Furnish and Install H-Piling (180 LF) 4. Install owner provided 100' Steel Truss Bridge 5. Complete earthwork and construction of trails to bridge. The abutment and earthwork construction shall be substantially complete no later than October 24,2024. Final completion of the work for the abutment and earthwork construction shall be no later than October 31,2024 The work for setting the bridge shall be substantially complete no later than July 11 ,2025 Final completion of the work for setting the bridge will be on or before July 18, 2025. Plans and Specifications were prepared by the Minnesota Department of Natural Resources, Contact: Jeff Erickson 218-308-2639

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS