Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Old State Highway Pipeline Replacement project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Old State Highway Pipeline Replacement project, managed by the Placer County Water Agency in California, involves the replacement of approximately 1,650 linear feet of 8-inch water main and 1,700 linear feet of 6-inch sewer main. The scope of work includes the replacement of services and appurtenances, with construction primarily occurring within a 20-foot corridor of paved roadway and designated staging areas. The project is located within existing County and PCWA utility right-of-way, specifically along Old State Highway from the Taylor Road intersection heading east, as well as within Threlkel Street and Buena Vista Avenue in unincorporated Newcastle, Placer County. The project is classified as a forecast under NAICS code 237110 and is exempt from certain environmental reviews under Class 2, Section 15302, as it replaces existing public facilities with substantially the same purpose and capacity. Site activities will involve minimal ground disturbance but will require some vegetation removal, tree trimming, and potential tree removal. Administrative oversight is provided by the Placer County Water Agency, with Steven Millett serving as the Associate Engineer and Heather Trejo as the Environmental Scientist.

General Info

Replace 1,650 ft water main and 1,700 ft sewer main in Newcastle, CA, under CEQA Class 2 exemption.

Agency

California → Placer County Water Agency

Place of Performance

Pipeline will be replaced within Old State Highway newcastle, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Placer County Water Agency
Contacts1 person available
OfficeN/A
Organization / Agency
California → Placer County Water Agency
Office AddressN/A

Full Description

Show more
The project will replace approximately 1,650 linear feet of water main with a new 8-inch water main and 1,700 linear feet of sewer main with a new 6-inch sewer main. Work will occur within existing County and PCWA utility right-of-way and will include replacement of services and appurtenances. There will be minimal amount of ground disturbance and construction will occur mainly with in 20-foot corridor of paved roadway with staging areas. Some vegetation removal, tree trimming and possibly tree removal will be required.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sanitary sewer system improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of PVC and DIP piping ranging from 6 to 30 inches, the construction of standard and doghouse manholes, and the execution of 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional requirements include CSO regulator fit out, outfall construction, maintenance of flows and bypass operations, and the abandonment of existing pipes and manholes. Project execution requires strict adherence to environmental standards through SWPPP implementation and maintenance, as well as the use of geotechnical instrumentation and monitoring. Due to the project location and nature, railroad insurance is a mandatory requirement. General site preparation tasks such as clearing and grubbing of wooded areas and subsequent seeding and fine grading are also included in the bid schedule.
Cleary Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in 17 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS