Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Old State Highway Pipeline Replacement project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Old State Highway Pipeline Replacement project, managed by the Placer County Water Agency in California, involves the replacement of approximately 1,650 linear feet of 8-inch water main and 1,700 linear feet of 6-inch sewer main. The scope of work includes the replacement of services and appurtenances, with construction primarily occurring within a 20-foot corridor of paved roadway and designated staging areas. The project is located within existing County and PCWA utility right-of-way, specifically along Old State Highway from the Taylor Road intersection heading east, as well as within Threlkel Street and Buena Vista Avenue in unincorporated Newcastle, Placer County. The project is classified as a forecast under NAICS code 237110 and is exempt from certain environmental reviews under Class 2, Section 15302, as it replaces existing public facilities with substantially the same purpose and capacity. Site activities will involve minimal ground disturbance but will require some vegetation removal, tree trimming, and potential tree removal. Administrative oversight is provided by the Placer County Water Agency, with Steven Millett serving as the Associate Engineer and Heather Trejo as the Environmental Scientist.

General Info

Replace 1,650 ft water main and 1,700 ft sewer main in Newcastle, CA, under CEQA Class 2 exemption.

Agency

California → Placer County Water Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Pipeline will be replaced within Old State Highway newcastle, CA

Set-Aside

NONE

Documents

(1)

Old State Highway Pipeline Replacement Project NOE

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Placer County Water Agency
Contacts1 person available
OfficeN/A
Organization / Agency
California → Placer County Water Agency
Office AddressN/A
Contacts
Heather TrejoEnvironmental Scientist

Full Description

Show more
The project will replace approximately 1,650 linear feet of water main with a new 8-inch water main and 1,700 linear feet of sewer main with a new 6-inch sewer main. Work will occur within existing County and PCWA utility right-of-way and will include replacement of services and appurtenances. There will be minimal amount of ground disturbance and construction will occur mainly with in 20-foot corridor of paved roadway with staging areas. Some vegetation removal, tree trimming and possibly tree removal will be required.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project, solicitation number PN C155003, involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. Managed by Filanc, the project has an engineer's estimate of 36,000,000 dollars and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is comprehensive, encompassing pipeline infrastructure such as valves, welding, cathodic protection, jack and bore, and precast vaults, as well as civil works including paving, striping, flatwork, fencing, and potholing. Technical services required include videography, testing and inspections, settlement monitoring, survey, and E&IC, alongside compliance tasks such as SWPPP, traffic control, and asbestos pipe demolition and removal. The solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, and Veteran-owned businesses, with a strong emphasis on the participation of SBE, MBE, and WBE firms. Filanc has committed to providing assistance to qualified small businesses regarding bonding, insurance, credit lines, and equipment to encourage diverse subcontracting. Bids for the various project scopes are due by September 23, 2026. Interested parties can obtain plans and specifications through the primary point of contact, Julia Masaitis.
Filanc

POSTED

about 6 hours ago

DEADLINE

in about 14 hours
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished valves and Metropolitan-furnished 54-inch and 132-inch valves, along with 54-inch and 145.5-inch diameter tie-ins and associated fittings. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The project encompasses electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a response deadline of September 29, 2026. The prime contractor encourages M/W/DBE participation and the use of apprentices, offering assistance with bonding, insurance, and materials to qualified subcontractors.
James W. Fowler Co.

POSTED

about 6 hours ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS