Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity was posted on May 4, 2015. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

On Site Destruction of Secure Metal Plating

Closed
35246Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 562920
New
International
Gwelliannau i / Improvement works to the ‘Materials Recovery Facility’ (MRF) Ystâd Ddiwydiannol Cibyn, Caernarfon, Gwynedd, LL55 2BD
Solicitation # Project No 61550 - ITT122009
Cyngor Gwynedd is seeking a qualified contractor for the design, supply, installation, commissioning, and testing of a redesigned materials recycling line at the Materials Recovery Facility (MRF) located at Cibyn Industrial Estate, Caernarfon. The project leverages newly available floor space to optimize the facility's layout, with the goals of increasing operational throughput, enhancing health and safety standards, reducing manual handling through automation, and improving the quality of recovered materials. The scope of work encompasses a full end-to-end delivery, including the initial assessment of site constraints, the removal or relocation of existing equipment, the integration of new machinery, operator training, and the provision of warranties and ongoing preventative maintenance services. The contract is estimated to be valued at 1,200,000 GBP excluding VAT, with an estimated performance period running from February 25, 2027, to February 26, 2029. Award decisions will be based on a Most Economically Advantageous Tender (MEAT) approach, utilizing a weighted scoring system of 80% for technical quality, 15% for price, and 5% for social value commitments. Tenders must be submitted via the Eteinderwales portal by December 10, 2026, and must include a detailed pricing schedule and a social value assessment outlining specific monetary or time contributions.
Cyngor Gwynedd

POSTED

6 days ago

DEADLINE

in about 2 months

General Info

Agency

N/A

NAICS

562920 - Materials Recovery Facilities

Place of Performance

U.S. Government Publishing Office 732 North Capitol Street, NW Washington, DC., WASHINGTON, DC, 20401, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

2 updates
PhaseClosed
Posted

special-notice

Notice updated

Notice type changed from Special Notice to Sources Sought. Response deadline added: May 11, 2015. The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts1 person available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
James C. SissonContract Specialist

Full Description

Show more
Questions regard the description and quantity of these plates: What are the dimensions of the plates, and specifically the gauge or thickness i.e. 6, 8, 12 gauge?40 - X 31inches ------.3millileters thick Are these the typical photosensitive plates used in offset printing?--Yes Do these plates have any wet ink residue which may come off when in contact with the shredding equipment?---No What is the approximate weight of one of the drums referenced in the description?---250lbs Are all of the plates the same size?---No, the plates in the drums have been cut into 2X8 inch strips Iis there a place to perform the work?-Work will be performed on site at the U.S. Government Publsihing Office 732 North Capitol Street, NW Washington, DC in the loading dock area is there a standard 115 volt outlet near the work area?----Yes How far from the loading dock area to the material?---Material shall be brought to the loading dock area 1. All destruction must be completed on-site, in one business day, and witnessed by GPO Personnel security group along with SID employees. 2. Shredder machine used, must use a screen size no bigger than 30mm. 3. Residual pieces will be removed from GPO property by the contractor. 4. All resulting materials should be melted down or "smelted" according to local, state, and federal guidelines with complete accountability. 5. A certificate of destruction will be given to GPO, certifying the material has been rendered un-recoverable. This certificate should suffice for all compliance purposes.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS