Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Opportunity for DBE - R156-R02 Upgrade of Main Sewage Pump and Power Distribution Systems

Open
2140634State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

NAICS

N/A

Place of Performance

Rockaway Park, NY, NY, USA

Set-Aside

NONE

Documents

1
PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyNew York
Contacts2 people available
OfficeN/A
Organization / AgencyNew York
Office AddressN/A
Contacts
Patricia SalmonProcurement Coordinator
Patricia SalmonProcurement Coordinator

Full Description

Show more
Jett Industries, Inc. (Jett - Contractor) is assembling a bid for the R156-R02 MSP Power Dist Upgrades with NYCDEP (Owner) and extends this request for Quotes (RFQ) to all firms (Bidders) to provide labor, materials, and/or equipment for the Project as described in these bid packages. The Rockaway Wastewater Resource Recovery Facility (WRRF) is owned and operated by DEP. This Project's objective is to improve the continued operational reliability of the Rockaway WRRF in compliance with updated code requirements and operational optimization by upgrading and replacing its main sewage pump (MSP) and power distribution systems, both of which have reached the end of their useful life. The Project shall also provide odor control to specific areas to reduce potential complaints. The major elements of work are as follows: • Replacement and upgrade of the MSP System: ➢ Five West Drywell MSPs in service. ➢ The 48-inch force main header for the existing MSPs, that discharges into the WRRF’s four primary sedimentation tanks (PST). ➢ Six submersible pumps in service. ➢ The 42-inch force main header for the submersible pumps that discharges into the PSTs. ➢ Permanent demolition of two out-of-service East Drywell MSPs. ➢ Upgrades to the drywell MSP and ancillary support systems, including leveling metering. ➢ Flow metering equipment, remote monitoring and control for the new MSP system. ➢ Power sub-metering of the MSPs. ➢ Related ancillary systems, including motor control centers (MCC), lighting panels and systems, and heating, ventilation, and air-conditioning (HVAC). • Replacement and upgrade of the Power Distribution System: ➢ Standby Generator System. ➢ Main Incoming Feeders. ➢ Main Power Distribution Systems, including replacement of the 5 kilovolt (kV) and 13.2 kV substation and switchgear (SWGR) systems. ➢ 12 MCCs. ➢ HVAC and Lightning Systems. ➢ Temporary Interim Systems. ➢ Related ancillary systems. ➢ Interconnection and excess distribution costs coordination with the Long Island Power Energy and Gas (LIPSEG), the local power distribution utility, to accommodate the Project. The Project also includes necessary work to meet the NYC and DEP’s resiliency guidelines and requirements, as well as applicable NYC Local Laws for Sustainability per GPR Section 01 36 63 - Sustainability Requirements. The Design-Builder (DB) is responsible for identifying any applicable updates and including them in the scope of work. All components of the Project shall have a useful life expectancy as outlined in Useful Life of Capital Projects section of the NYC Mayor’s Office of Climate & Environmental Justice Climate Resiliency Design Guidelines. The Work will occur in an active WRRF requiring continuous uninterrupted operation per GPR Section 01 72 12 – Maintenance of Operation and Construction Staging and requirements in this Volume. Additional Project requirements: Project Labor Agreement Davis-Bacon Prevailing Wages Build America, Buy America American Iron and Steel Access to Bid Documents Project documents and Scope details will be posted to the Files tab of Building Connected. Issuance of Addenda by Owner Jett will upload to the FILES tab on Building Connected all addenda as received by the Owner. A notification through Building Connected will be sent to Bidders. Bidders are required to acknowledge receipt of addenda in writing on the Bid Proposal form or their quote. Requests for Clarification Any Bidder, no later than the date posted on the Project Information Page, may submit questions for interpretation or clarification of, or addenda to, this Bid. All requests must be submitted in writing and sent by email or as a message through Building Connected The Project includes the following Work: General scope of work includes Additional Project requirements: xBE requirements: This project has a 20% DBE participation goal. Jett Industries, Inc. / KIC encourages DBE Business Enterprise firms to quote our projects, as well as subcontractors and materials supplier who contract with our firm and utilize XBE subcontractors and vendors for work to be performed. Link to Directory:https://nysucp.newnycontracts.com/ https://nysucp.newnycontracts.com/ Scopes of Work Needed: **All quotes should be submitted through the Building Connected platform. Contact the scope lead if there are any questions or issues with submissions.* Please reach out to contact@example.gov for access troubleshooting. Link to Files: https://app.buildingconnected.com/projects/691b69ddd4c257139cee3a9a/files Service-Disabled Veteran-Owned Business (SDVOB) SDVOB Goal: 0.00% Minority / Women Business Enterprise contracting goals (MWBE) MBE Goal: 0.00% WBE Goal: 0.00% Disadvantaged Business Enterprise contracting goals (DBE) DBE Goal: 20.00%

More opportunities from New York

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS