This Solicitation opportunity from Pennsylvania was posted on May 30, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
OPS - 150 Elevators
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Collegium Charter School in Chester County, Pennsylvania, is soliciting bids for the installation of new door operators and power units for elevators 1 and 2 in the 150 Building. The project requires the installation of non-proprietary GAL MOVFR closed-loop door operators and upgraded power motors. The comprehensive scope of work includes removing original equipment, building steel supports, replacing damaged door rollers, installing a new power unit with a soft start, and performing all necessary wiring, oiling, and testing to return the cars to service. All materials and workmanship must carry a minimum one-year guarantee. The solicitation was released on May 30, 2025, with a mandatory site visit on June 5 and a response deadline of June 13, 2025. Work must begin immediately upon acceptance and be completed by August 8, 2025. Because the school is publicly funded, the project is subject to the Pennsylvania Prevailing Wage Act. Payment terms consist of a 25 percent deposit upon contract acceptance and the remaining balance on Net 30 terms following completion. Bidders are required to submit a notarized Non-Collusion Affidavit to ensure competitive and independent pricing.
General Info
Contract Value
$84,455.56NAICS
Place of Performance
Chester County, PA, USASet-Aside
Awardee
Ascent ElevatorsAward Issued Date
Documents
2AI Contract Breakdown
Uniform Contract FormatContract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Interested Companies (21)
See All 21 Interested Companies
Get full access to view all interested companies, their contact details, and full contractor profiles.
Full Description
Release Date: Friday, May 30, 2025 @ 9:00am Required Site Visit: Thursday, June 5, 2025 @ 4:00pm Response Date: Friday, June 13, 2025 @ 3:00pm Project start date: ASAP upon contract acceptance; must be completed no later than Friday, August 8, 2025.
New Door Operator and Power Unit – 150 Building Elevators #1 & #2
Contractor will provide all necessary labor, materials and equipment to perform the following: 1. Install a new, non-propriety GAL MOVFR closed-loop door operator. o The equipment will consist of a motor with heavy duty sprocket, chain, belt and sheaves. o This operator will regulate speed via motor performance feedback and automatically adjust for external conditions including debris in the track. 2. Replace the power motor with new, upgraded equipment.
Scope of work will include: Remove old and original style door operator Build steel supports for new door operator Install new GAL MOVFR closed-loop door operator Replace the door rollers that are bad Adjust torque on new door operator Adjust and ensure optimal door operation Drain the oil on the existing power unit Remove the old power unit Install new power unit Mount the controller Make the proper connections and wire the new power unit in Install new soft start Fill hydraulic tank with oil Adjust valve for proper operation Test and return unit to service Test operation and return car(s) to service
All materials and workmanship should have a minimum of a one (1) year guarantee; unless damage is due to equipment exposure to water or other weather-related conditions.
The Pennsylvania Prevailing Wage Act (PA PWA) requires that contractors and subcontractors on public works projects in Pennsylvania pay their workers at least the prevailing wage rates for their respective crafts or classifications. Collegium Charter School is publicly funded and therefore falls under the Pennsylvania Prevailing Wage Act.
Contract Terms: > 25% deposit upon contract acceptance. > Net 30 days after project completion.
All documents and solicitation details are available at no cost on PennBid – (https://pennbid.bonfirehub.com)
Collegium Charter School reserves the right to reject any and all bids and to accept the bid which is in the best interest of Collegium Charter School.
More opportunities from Pennsylvania → Chester County
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
