This Solicitation opportunity from Pennsylvania was posted on May 30, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
OPS - 500 Generator
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Collegium Charter School in Chester County, Pennsylvania, is soliciting bids for the supply and installation of a new 80kW natural gas generator and a 400amp ASCO Automatic Transfer Switch (ATS). The project scope includes providing all labor, materials, and equipment to install the generator with a sound attenuated enclosure and Deep Sea controller, as well as mounting the ATS on the building exterior. Technical requirements involve intercepting existing circuits for panels KP-1 and KP-2, installing new conduits and cables, extending gas piping, and providing necessary crane and rigging services. The contractor is responsible for the final start-up and commissioning of the equipment, which includes a two-year base warranty. The solicitation was released on May 30, 2025, with responses due by June 13, 2025, at 3:00pm. Site visits were scheduled for June 5th and 6th, and the project is intended to start immediately upon contract acceptance. Payment terms are structured as a 25% deposit upon acceptance and the remaining balance Net 30 days after completion. As a publicly funded institution, this project is subject to the Pennsylvania Prevailing Wage Act. Bidders are required to submit a notarized Non-Collusion Affidavit to ensure competitive and independent pricing.
General Info
Contract Value
$92,145Place of Performance
Chester County, PA, USASet-Aside
Awardee
Cook Service Company IncAward Issued Date
Documents
7AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- 26-140 Installation of Emergency Shut Off SwitchesOpen now, due in 3 days
- Emergency/Exit Lighting – Mechanical/Electrical Rooms ProjectOpen now, due in 18 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Interested Companies (60)
See All 60 Interested Companies
Get full access to view all interested companies, their contact details, and full contractor profiles.
Full Description
Release Date: Friday, May 30, 2025 @ 9:00am Response Date: Friday, June 13, 2025 @ 3:00pm Project start date: ASAP upon contract acceptance Appointments available for site visit on June 5th & 6th after 2:00pm.
Contractor will provide all necessary labor, materials and equipment to perform the following: 1. Supply and install one (1) new 80kw natural gas generator with the following options: > standby 80kW natural gas generator, 208/120 volts, three-phase, 4-wire 60Hz, 1800 RPM > one (1) 300amp Circuit Breaker, 3-pole, 600-volt AC, 80% UL > 1" flexible fuel line and strainer > Aluminum sound attenuated enclosure > Deep Sea controller > Battery charger w/rack and cables > 2-year Base Warranty > Operation & maintenance manuals 2. Supply and install one (1) new ASCO 400amp, 208/120-volt, 3-phase, 4-wire,3-pole, open-transition, Automatic Transfer Switch in a NEMA 3R enclosure with the following options: > Source available lights > Manual by-pass of transfer > Automatic engine exerciser > ATS position indicating contacts > Heater w/ thermostat 3. Install the new ATS on the exterior of the building near the generator location. 4. Intercept the existing circuit feeding panels KP-1 and KP-2 and extend to the new ATS. 5. Supply and install new line and load conduits and cables from the KP-1 panel to the new ATS. 6. Supply and install new conduits and cables from the ATS to the generator as required. 7. Supply and install one (1) new conduit and cables from panel KP-1 to the generator for the block heater and battery charger circuits. 8. Supply and install new gas piping, valves and pressure regulator as required to extend the existing gas line to the new generator. 9. Provide the necessary crane and rigging to install the new generator. 10. Perform start up and commissioning on he newly installed equipment.
The Pennsylvania Prevailing Wage Act (PA PWA) requires that contractors and subcontractors on public works projects in Pennsylvania pay their workers at least the prevailing wage rates for their respective crafts or classifications. Collegium Charter School is publicly funded and therefore falls under the Pennsylvania Prevailing Wage Act.
Contract Terms: > 25% deposit upon contract acceptance. > Net 30 days after project completion.
All documents and solicitation details are available at no cost on PennBid – (https://pennbid.bonfirehub.com) Collegium Charter School reserves the right to reject any and all bids and to accept the bid which is in the best interest of Collegium Charter School.
More opportunities from Pennsylvania → Chester County
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
