Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on March 11, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Orange County Convention Center (OCCC) North / South Exterior Canopy Ceiling Replacement

Closed
Y24-772State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
CP25014
Solicitation # CP25014
Solicitation CP25014 is a unit price contract issued by the Port of Lake Charles (Lake Charles Harbor & Terminal District) for the Industrial Park East Rail Extension and Trans-loading Yard project located in Calcasieu Parish, Louisiana. The scope of work requires the contractor to provide all labor, materials, equipment, and supplies necessary to complete the project according to best industry practices and contract specifications. Key deliverables include mobilization, clearing and grubbing of 10 acres, drainage excavation, structural fill embankment, lime treatment of 37,000 square yards, and the installation of 602 linear feet of barbed wire fencing and double swinging driveway gates. The contract will be awarded to the lowest qualified bidder who complies with all requirements. Bidders must submit proposals by November 19, 2026, using the Louisiana Uniform Public Work Bid Form, ensuring every requested item has a unit price. The successful bidder must provide performance and payment bonds from an approved or A-rated Louisiana domiciled insurance company. Project administration includes a bi-monthly schedule update requirement and a retainage policy of 10 percent for contracts up to 500,000 dollars and 5 percent for those exceeding that amount. Compliance with the Clean Air Act, Federal Water Pollution Control Act, and Equal Opportunity clauses is required, with specific attention to FEMA assistance for subcontracts exceeding 150,000 dollars. Inspection and acceptance are managed by the Department, utilizing DOTD standards for earthwork and the International Roughness Index for concrete pavement.
Port of Lake Charles

POSTED

about 2 hours ago

DEADLINE

in 21 days
NAICS: 237990
New
SLED
Vernon Street Town Square Fountain Renovations
Solicitation # 13-201
The City of Roseville is soliciting lump sum bids for the renovation of the Vernon Street Town Square fountain and spray ground located in Roseville, California. The project scope includes limited demolition, the construction of a new balance tank, and the removal and replacement of below-grade piping. The contractor will be responsible for installing spray ground structures, surface finishes, and comprehensive mechanical and electrical systems. The base bid may be supplemented by two additive alternates: the installation of granite pavers instead of broom finished concrete and the use of specific colored concrete. Because the site will remain open to the public during construction, the contractor must coordinate site security and minimize impacts to public access. The contract will be awarded based on the Grand Total Bid Price, which includes the base bid and any selected alternates. Bidders must demonstrate a prerequisite experience with park projects of similar size and scope completed within the last three years. The work must be completed within 50 business days of the Notice to Proceed, with a detailed preliminary progress schedule due within 20 days and a Critical Path Method schedule due within 30 days. Payment is processed monthly with a five percent retention held by the City. Technical requirements include strict adherence to ASTM, NECA, NEMA, and UL standards, with specific labeling and marking requirements for electrical components. All materials must be delivered in original unopened containers and stored under cover. The contractor is required to provide a Public Works Faithful Performance Bond and a Labor and Materials Payment Bond, and must comply with California prevailing wage rates and OSHA safety regulations. Bids must be submitted under sealed cover, including all required proposal forms and a Project Qualifications/Experience Sheet, to be considered responsive.
City of Roseville

POSTED

about 4 hours ago

DEADLINE

in 5 days
NAICS: 237990
New
SLED
Agricultural INNOVATION Farm Project for San Marcos Unified SD
Solicitation # 2026-21
The San Marcos Unified School District is soliciting bids for the Agricultural INNOVATION Farm Project (Solicitation 2026-21) located at 99 Cassou Rd, San Marcos, California. The project scope involves the demolition of an abandoned electrical pole, water pump, and fencing, followed by the installation of underground water and electrical utilities, irrigation lines, a gravel service road, shade structures, storage containers, arbors, and designated planting areas. Work must be performed in strict accordance with the technical specifications, project drawings, and soil report. The estimated period of performance begins December 1, 2026, with a required completion date of April 1, 2027. The contract will be awarded to the lowest responsible bidder. Qualified bidders must hold a valid California Contractor's License and be registered with the California Department of Industrial Relations (DIR), as the project is subject to prevailing wage requirements. Submission requirements include a bid bond for 10 percent of the contract amount, a non-collusion declaration, and references, all submitted via the OpenGov e-procurement portal by November 2, 2026. The successful contractor must provide performance and payment bonds equal to 100 percent of the contract value and adhere to a 3 percent Disabled Veteran Business Enterprise (DVBE) participation goal. All materials must be delivered in original packaging and comply with UL 969 marking and labeling standards.
Curriculum and Instruction

POSTED

about 16 hours ago

DEADLINE

in 4 days

Documents

12

A6010 Enlrgd Section Details

PDF, High priority: read this firstspecifications
High

AD2100 Overall Demolition Architectural Plan

PDF, High priority: read this first1 page · specifications
High

Drawings AD2101 Enlrgd Arch Demo Plan RCP

PDF, High priority: read this firstspecifications
High

Drawings S001 - General Notes

PDF, High priority: read this first1 page · specifications
High

Drawings S101 Struct Wind Press Calcs

PDF, High priority: read this firstspecifications
High

OCCC Capital Planning Supplemental Conditions (CP 401B Form)

PDF, High priority: read this firstspecifications
High

OCCC North-South Exterior Canopy Ceiling Replacement - Technical Specifications

PDF, High priority: read this firstspecifications
High

OCCC North/South Exterior Canopy Ceiling Replacement (Y24-772)

PDF, High priority: read this firstifb
High

OCCC North/South Exterior Canopy Ceiling Replacement (Y24-772)

PDF, High priority: read this firstifb
High

Orange County Convention Center Canopy Ceiling Replacement - G001 Legends Symbols & Notes

PDF, High priority: read this first1 page · specifications
High

Orange County Convention Center - N-S Exterior Canopy Ceiling Replacement Title Sheet

PDF, High priority: read this first1 page · specifications
High

Orange County Convention Center - Plans Life Safety Overall Existing (G002)

PDF, High priority: read this first1 page · specifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Apr 18, 2024 to Apr 11, 2024. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Orange County Administrative Service, Procurement Division
Contacts1 person available
OfficeN/A

Full Description

Show more
NOTICE IS HEREBY GIVEN that Orange County, Florida, henceforth referred to as the County is accepting sealed bids for Orange County Convention Center (OCCC) North / South Exterior Canopy Ceiling Replacement (Y24-772)Sealed offers for furnishing the above will be accepted up to 4:00 pm EST on Thursday, April 11, 2024.The Estimated Cost for this project is $1,630,394.00NOTE: Respondents are required to submit responses electronically via the ProcureNow OpenGov e-Procurement Platform. Respondents shall not be permitted to hand-deliver, mail, telephone, fax or email offers.Responses received after the submission deadline and/or transmitted outside of the designated ProcureNow OpenGov e-Procurement Platform shall be rejected.Important Instructions for Electronic SubmittalThe County is ONLY accepting electronic bid submissions using the ProcureNow OpenGov e-Procurement Platform. Respondents shall create a FREE account with ProcureNow OpenGov by signing up at https://secure.procurenow.com/signup. Once you have completed account registration, browse back to this page, click on Submit Response, and follow the instructions to submit the electronic bid.It is the respondent's responsibility to ensure they commence their upload efforts timely to meet the submission deadline. The County shall not be responsible for delays caused by any occurrence, including the respondent's network delays, bandwidth issues, internet outages, or technical difficulties.ProcureNow Technical SupportFor Technical Support, respondent's can reach the ProcureNow OpenGov Service Desk:Chat (preferred): Click the button in the lower right hand corner of the portal Email: [email protected]Phone: +1 (555) 000-0000 Hours: Mon-Fri 8am - 8pm ESTTimely Questions Regarding this SolicitationThe question and answer module of ProcureNow OpenGov IS being utilized for this solicitation. Timely questions concerning this solicitation shall be submitted in accordance with the deadline for questions: Wednesday, March 27, 2024 at 5:00 pm EST. Respondents are instructed not to contact the initiating division directly.Consideration for modification or alteration of the documents contained in this solicitation shall be requested during the specified question period, before the applicable deadline. No oral interpretation of the meaning of the plans, specifications, or other Contract documents shall be considered binding. The County shall be bound by information and statements only when such statements are written and executed under the authority of the Manager, Procurement Division.Answers for timely questions will be addressed in the ProcureNow OpenGov question and answer module or as an addenda to this solicitation depending on volume, participants are encouraged to subscribe as a follower and monitor all notifications. Beyond questions and answers, any and all modifications, clarifications, interpretations and supplemental instructions will be in the form of a written addendum which, if issued, will be available for download. All addenda and questions/answers so issued shall become part of the Contract Documents and receipt shall be acknowledged as specified herein.This provision exists solely for the convenience and administrative efficiency of Orange County. No respondent or other third party gains any rights by virtue of this provision or the application thereof, nor shall any respondent or third party have any standing to sue or cause of action arising there from.Untimely questions are unable to be submitted in the question and answer module, thereafter respondents raising critical concerns must email [email protected]. Critical clarifications may be made via addenda, however, untimely questions may not be considered.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS