Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Oswego Breakwater

Awarded
W912P426BA004Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The U.S. Army Engineer District, Buffalo, issued award notice W912P426BA004 for the repair and rehabilitation of the Oswego Breakwater, with a total estimated contract value ranging between $11,178,252.99 and $15,075,975.00 based on competing bids from small business offerors. The procurement is a Total Small Business Set-Aside under FAR 19.5 and falls under NAICS code 237990 for other heavy and civil engineering construction. Work involves the supply and placement of Bedding Stone, Underlayer Stone, and Armor Stone across five distinct project segments labeled Option A through E, each defined by station ranges along the breakwater from STA 17+50 to 24+50. The scope includes mobilization and demobilization, material delivery and installation, and mandatory closeout submittals for each segment, with pricing structured on a unit basis per ton of stone and fixed fee per submittal. The contract requires performance at the project site in Oswego Harbor, New York, with inspection and acceptance conducted on-site by the Government. The contracting officer is Tyrone Palaganas, and payment will be processed through the Buffalo office at 478 Main Street, but no remittance details, invoicing method, or accounting data such as TAS or ACRN are specified. While the offer abstract provides detailed quantities and extended costs from three bidders—Great Lakes Docks and Materials, Dean Marine, and Agate Construction—critical elements such as evaluation factors, contract type (e.g., FFP), delivery terms like FOB, packaging requirements, and specific technical standards are not stated in the available documentation. No representations, certifications, or socioeconomic disclosures from offerors are included, nor are any clauses, special requirements, or submission instructions provided. The solicitation was opened on April 6, 2026, with an issue date of February 25, 2026, and is being managed by Walter Kamad as the primary point of contact.

General Info

Oswego Breakwater project presolicitation by Army, heavy civil construction, bidding soon.

Contract Value

$14,947,133.92

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Oswego Breakwater Harbors in Oswego, NY., NY

Set-Aside

SBA

Award Issued Date

Documents

1

W912P426BA004 - Oswego Breakwater Repairs Abstract of Offers

PDF, High priority: read this firstaward
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Deadline changed

Response deadline changed from Mar 30, 2026 to Apr 6, 2026.

Notice updated

Notice details unchanged. Attachments may have changed.

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Buffalo
Contacts1 person available
OfficeBUFFALO, NY, 14202-0000, USA
Office AddressBUFFALO, NY, 14202-0000, USA

Full Description

Show more
This is a solicitation notice for Oswego West/East Breakwater Harbors. The solicitation details are attached in the solicitation package.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
International
Lytton First Nation – Berm Construction
Solicitation # 24-3028C
Solicitation 24-3028C is for the construction of the Nohomeen Recovery Berm located at the Stein Subdivision in Stryen, Lytton, British Columbia, for the Lytton First Nation. The project involves significant earthworks and the installation of a retaining wall using lock block facing units with a minimum 28-day concrete strength of 20 MPa and a specific batter of 5 degrees. Key technical requirements include the use of Type I Engineered Fill and retained backfill, both compacted to 100 percent of the maximum density per ASTM D698 standards. The scope also includes the installation of 150mm perforated PVC toe and heel drains, vertical cleanouts, rodent guards, and a clear crush chimney drain, with NILEX 4545 non-woven geotextile required at soil interfaces. The project mandates strict environmental and cultural compliance, requiring adherence to Thompson-NOXLAND Regional District Bylaws and Department of Fisheries and Oceans Land Development Guidelines. Contractors must install silt fencing prior to excavation and ensure all soil removal is conducted by a company employing a qualified cultural assist. Quality assurance is managed through the Geotechnical Engineer of Record, who must approve the subgrade and wall bearing surface before wall construction begins. Additionally, the contractor is responsible for verifying wall batter every block course and limiting the use of heavy equipment to a minimum distance of 0.75 meters from the wall face. Responses to this solicitation are due by October 22, 2026.
Lytton First Nation

POSTED

about 15 hours ago

DEADLINE

in 19 days
View Details
NAICS: 237990
New
SLED
Contract 26-2 Furnace Creek Tank Painting
Solicitation # Contract 26-2
The Womelsdorf-Robesonia Joint Authority is soliciting sealed bids for Contract 26-1, Furnace Creek Tank Metals Rehabilitation, through the PennBid online portal, with bids due by 2:00 PM on August 11, 2026. The project involves comprehensive rehabilitation of a water storage tank, including installation of a 4-inch drilled riser for static mixing, replacement of the tank ladder with safety cables, installation of a new 30-inch manway, replacement of the roof vent, and reconfiguration of the overflow discharge system to include an air gap, duckbill check valve, funnel-style reducer, and flapper valve above a concrete splashpad. All work must comply with applicable industry standards including ASTM, AWWA, OSHA, and SSPC, and materials must be delivered in original manufacturer packaging with bright-machined surfaces protected by heavy grease coatings. The contract is funded by a Penn VEST Drinking Water State Revolving Fund loan and is subject to all associated requirements. Full compliance with the Build America, Buy America Act and the American Iron and Steel provisions is mandatory, requiring all iron, steel, manufactured products, and construction materials to be produced in the United States unless a formal waiver is obtained. Each bid must be accompanied by a 10% bid bond or certified check payable to the Authority, and failure to provide one will result in bid rejection. Bidders are encouraged to contact Chief Operator Dennis Miller to arrange a site visit. The Authority reserves the right to reject any or all bids and will select the most advantageous offer based on price and technical compliance. The work is performed at the project site in Berks County, Pennsylvania, with no specified contract type, line item pricing, or electronic invoicing system outlined. Payment administration, accounting codes, and contracting officer representative details are not defined in the solicitation. Proposal submission is strictly electronic via PennBid, with mandatory attachments including non-collusion affidavits, financial statements, surety documentation, and employment compliance certifications. No small business set-asides, unique entity identifiers, or CAGE codes are required, and no formal evaluation factors or weighted scoring criteria are specified, indicating an emphasis on lowest responsible bidder principles.
Berks County

POSTED

about 22 hours ago

DEADLINE

in 18 days
View Details
NAICS: 237990
New
SLED
2026-0011
Solicitation # 48935
The Cornerstone of Centerville South Phase I Public Improvements project is a civil and electrical construction solicitation issued by the City of Centerville, Ohio, with an engineer's estimate of $4,973,490.39. The scope of work includes the installation of conduits, structures, concrete drive aprons with curbs, seeding, mulching, and a design-build electrical component. The electrical portion requires the contractor to design and build the electrical service and associated conductors, including the installation of 22 decorative light fixtures, light pole bases, and specific connector kits. All work must adhere to the Ohio Building Code, N.E.C., N.F.P.A. Standard 70, and ODOT specifications, with a project completion date set for September 30, 2027. Bids are submitted as unit price proposals via Bid Express, with a final response deadline of October 13, 2026. The selection process evaluates the lowest and best bid based on project history, available resources, financial ability, and compliance with federal, state, and local laws, including Ohio Prevailing Wage and OSHA regulations. Required financial securities include a bid bond for the full amount of the bid or a 10 percent certified check, and a 100 percent performance bond upon award. Insurance requirements specify minimum coverage of $2,000,000 for Commercial General Liability, $1,000,000 for Auto, and $1,000,000 for Workers Compensation. Contract administration is managed by Oberer Construction Managers Ltd. on behalf of the City.
City of Centerville

POSTED

about 22 hours ago

DEADLINE

in 10 days
View Details
NAICS: 237990
New
SLED
Pierpont Nuisance Sand Removal
Solicitation # P-130000901
The City of San Buenaventura is soliciting proposals for solicitation number P-130000901 to perform nuisance sand removal from City-owned portions of Pierpont Beach between San Pedro Lane and Greenock Lane. This recurring project occurs twice annually, once in May and once in November, to satisfy a legal Settlement Agreement. The scope of work involves grading, removing, and hauling excess beach sand from up to 27 beach access lanes and the frontage of up to 17 private properties. Contractors must excavate sand wedges to specified limits, ensuring they remain no deeper than 6 inches above structural footings with a slope no more than 1:1.75, and transport the material to designated deposit sites while avoiding the tidal zone. Proposals are due by October 20, 2026, at 4:00 PM PST, and must be submitted as a sealed hard copy to the Purchasing and Contracts Division in Ventura, California. The City will award the contract based on the perceived best fit and best value, evaluating proposals on a scale of 0.0 to 15.0. Key requirements include compliance with Cal-OSHA safety standards, the California Manual on Uniform Traffic Control Devices, and a Biological Resource Assessment. Additionally, state prevailing wages for Ventura County apply to all workers. While a faithful performance bond is not required, a bid security of at least 10 percent may be requested, and a 5 percent credit is available for qualified Small Local Businesses.
City of San Buenaventura

POSTED

1 day ago

DEADLINE

in 17 days
View Details

More opportunities from Department Of Defense → W072 Endist Buffalo

Same awarding agency

NAICS: 238210
Federal
Black Rock Lock High Mast Lighting Project
Solicitation # W912P426QA015
Solicitation W912P426QA015, issued by the Department of Defense W072 Endist Buffalo, seeks a contractor for the Black Rock Lock High Mast Lighting Project in Buffalo, New York. The project involves the inspection, repair, and replacement of outdated first-generation LED fixtures and internal mechanisms for seven high mast lighting poles, each 100 feet tall, to ensure safe navigation for boat traffic. The estimated contract value is between $1,000,000 and $5,000,000, with a performance period of 180 calendar days following the notice to proceed. Base requirements include mobilization, the replacement of five lowering devices, and the replacement of 48 light fixtures, with an option to replace a high mast light pole. Award will be granted to the responsible offeror providing the lowest evaluated price among those meeting acceptability requirements. Evaluation factors include demonstrated experience with projects of similar scope and size, specifically those valued at $400,000 or more involving 100-foot high mast lighting in industrial or government facilities, as well as the availability of necessary equipment and staffing. The project incorporates a 10% HUBZone price evaluation preference and requires compliance with the Davis-Bacon Act, Buy American construction material standards, and EM 385-1 safety regulations. All proposals must be submitted electronically via the PIEE solicitation module by October 22, 2026.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

11 days ago

DEADLINE

in 19 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS