Otay 2nd Pipeline Phase IV

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Otay 2nd Pipeline Phase IV project, managed by the City of San Diego, involves the replacement and upsizing of a treated water pipeline to serve the Paradise Hills and Paradise Mesa communities. The scope of work includes the abandonment of 16,910 linear feet of 36-inch and 40-inch steel transmission main and the installation of 22,401 linear feet of 48-inch Cement Mortar Lined and Tape Coated transmission main. Additionally, the project requires the installation of 1,041 linear feet of 8-inch PVC distribution pipe to serve 17 private residences and the removal and backfilling of structures abandoned by the Bonita Pipeline. The project area extends from Sweetwater Road in San Diego County to Telegraph Canyon Road in the City of Chula Vista, requiring various replumb agreements, easement vacations, and real estate acquisitions. Construction will primarily utilize standard open trench techniques, with trenchless Underground Directional Drilling employed for jurisdictional channel crossings. The project is subject to rigorous environmental and technical oversight, including a Mitigated Negative Declaration, a Phase I Environmental Site Assessment, and biological and cultural resource surveys to protect sensitive habitats and archaeological sites. Key requirements include the development of a Community Health and Safety Plan, adherence to Cal OSHA excavation safety standards, and the implementation of a Mitigation, Monitoring and Reporting Program. The contractor is solely responsible for the design and operation of construction dewatering and temporary shoring. All construction documents must be approved by the City's Environmental Designee to ensure compliance with environmental permits and mitigation measures.

General Info

San Diego upgrades water pipeline with new 48-inch main, abandons old lines, installs 8-inch PVC for 17 homes, adjusts easements.

Agency

California → City of San Diego

Place of Performance

CA, 91910

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of San Diego
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of San Diego
Office AddressN/A
Contacts
Nancy GrahamProgram Manager
Jamie KennedySenior Planner

Full Description

Show more
Site Development Permit & Contract Award for abandonment of an existing 16,910 linear foot (LF) (3.2 mile) segment of 36-inch and 40-inch steel transmission main and installation of a new 22,401 LF (4.2 mile) 48-inch Cement Mortar Lined and Tape Coated (CML&TC) transmission main and appurtenances. The project would also include the new installation of approximately 1,041 LF (0.20 miles) of parallel 8-inch PVC distribution pipe by The Hill Road in San Diego County to provide service to 17 private residences. The project would also remove and backfill existing structures abandoned by the Bonita Pipeline. The project is located entirely outside the City of San Diego limits within unincorporated areas of San Diego County and within the City of Chula Vista and is generally located along portions of Bonita Road, Terra Nova Dr, East H Street, and Paseo Ladera, extending north to south from Sweetwater Road in San Diego County to Telegraph Canyon Road in the City of Chula Vista. Replumb agreements and real estate actions such as access agreements and easement vacations and acquisition would be required.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont in North Carolina involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station. Key infrastructure work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The scope further encompasses the installation of mechanical and electrical systems, including pumps, a generator, and odor control equipment, along with gravity sewers, manholes, stormwater facilities, and site restoration. The project has an estimated value of 16,690,000 dollars and a substantial completion timeline of 560 calendar days. This solicitation, identified as SRP-W-134-0290, is a unit price contract awarded to the responsible bidder submitting the lowest responsive bid. Bidders must provide a completed EJCDC C-410 Bid Form, a bid bond, and evidence of authority to sign, while also demonstrating good faith efforts toward MWBE goals. The contract requires performance and payment bonds and adherence to strict technical standards, including AWWA Specification C-600 for pipelines and NEMA standards for motors. Payment is processed via monthly applications for payment, with funds becoming due 30 days after presentation to the owner. The project is set aside for small businesses, including certified veteran-owned, women-owned, and HUBZone small businesses.
Don Moorhead Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in 12 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, associated supports, valves, and piping appurtenances. Additionally, the project requires the installation and operation of a temporary 11 MGD pumped bypass, the rehabilitation of reactor mixers and aerators, and the rerouting of sump pump discharge lines. Electrical and instrumentation work includes the installation of new or improved instrumentation, the rehabilitation and replacement of motor control center components, and modifications to existing sluice gates alongside the installation of new slide gates. The project also involves excavation, trench work, and surveying of key points around the reactors. This is a union project, and all subcontractors must utilize union labor. Potential subcontractors must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, providing their bond rate at the time of the bid for reimbursement. Quotes are due by November 17, 2026, with the final bid date set for November 18, 2026. This opportunity is set aside for small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone firms.
Garney Pacific, Inc.

POSTED

about 6 hours ago

DEADLINE

in 20 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS