Otay Second Pipeline Improvements Program

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Otay Second Pipeline Improvements Program, internally referred to as Otay 2nd Pipeline Steel Replacement Phase 3, is a construction project located within the cities of Chula Vista and San Diego in San Diego County. The City of San Diego serves as the lead agency responsible for executing the project, while the State Water Resources Control Board acts as a responsible agency providing the necessary financing. The project is identified by project number 3710020-080C and state clearinghouse number 2003011124. The scope of work involves the replacement of approximately 5,742 linear feet of the Otay 2nd Pipeline with a 48-inch diameter steel pipeline and approximately 1,116 linear feet of 8-inch distribution polyvinyl chloride. Key technical activities include realigning portions of the pipeline to public roads including Willow Street, Alameda Way, Valley Road, and Sweetwater Road, as well as reconnecting the pipeline with a 54-inch reducer south of State Route-54 and a 48-inch flange at Sweetwater Road. The project concludes with the transfer of water service connections back to the operating agency. Environmental compliance has been established through an Environmental Impact Report certified by the City of San Diego, with the State Water Board determining that the project will not have significant environmental or water quality impacts.

General Info

City of San Diego will replace Otay 2nd Pipeline steel and PVC piping.

Agency

California → City of San Diego

Place of Performance

multiple, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of San Diego
Contacts2 people available
OfficeN/A

Full Description

Show more
The State Water Resources Control Board (State Water Board) is a Responsible Agency for the Project. The State Water Board is funding the Project referred to internally as Otay 2nd Pipeline Steel Replacement Phase 3. The Project includes the replacement of approximately 5,742 linear feet (LF) of the Otay 2nd Pipeline to a 48-inch diameter steel pipeline and approximately 1,116 LF of 8-inch distribution polyvinyl chloride. The Project also includes realigning portions of the pipeline to nearby paved public roads (Willow Street, Alameda Way, Valley Road, and Sweetwater Road), reconnecting the pipeline with the 54-inch reducer south of State Route-54, reconnecting the pipeline with the 48-inch flange at Sweetwater Road just east of Willow Street, and transferring water service connections back to the operating agency.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sanitary sewer system improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of PVC and DIP piping ranging from 6 to 30 inches, the construction of standard and doghouse manholes, and the execution of 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional requirements include CSO regulator fit out, outfall construction, maintenance of flows and bypass operations, and the abandonment of existing pipes and manholes. Project execution requires strict adherence to environmental standards through SWPPP implementation and maintenance, as well as the use of geotechnical instrumentation and monitoring. Due to the project location and nature, railroad insurance is a mandatory requirement. General site preparation tasks such as clearing and grubbing of wooded areas and subsequent seeding and fine grading are also included in the bid schedule.
Cleary Construction, Inc.

POSTED

about 5 hours ago

DEADLINE

in 17 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS