Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

OTP-1 Leak Repair Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The OTP-1 Leak Repair Project is an emergency infrastructure initiative managed by the Olivenhain Municipal Water District to address a leak discovered on an analyzer sample line connected to the OMWD 48-inch Treated Potable Water Pipeline. Located on the San Diego Aqueduct Service Road adjacent to Suerte del Este in Escondido, San Diego County, the project is classified as an emergency under California Public Resources Code provisions. This designation is due to the immediate risk that failure to perform these repairs could result in the loss of property and the disruption of essential public services, given the project's proximity to critical Olivenhain Municipal Water District and San Diego County Water Authority infrastructure. The project is categorized under NAICS code 237110 and was officially posted on October 17, 2025. While specific financial details, contract types, and evaluation factors are not provided in the current documentation, the primary objective is the rapid restoration of the analyzer sample line to ensure the continued integrity of the potable water system. Administrative oversight and technical inquiries are managed by Steven Weddle, the Engineering Services Supervisor for the Olivenhain Municipal Water District, who serves as the lead agency contact for the project.

General Info

Emergency repair of OMWD potable water pipeline analyzer sample line in San Diego.

Agency

California → Olivenhain Municipal Water District

Place of Performance

San Diego Aqueduct Service Road adjacent to Suerte del Este, Escondido, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Olivenhain Municipal Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Olivenhain Municipal Water District
Office AddressN/A

Full Description

Show more
Emergency project to repair a leak that surfaced at OTP-1 on an analyzer sample line to OMWD 48" Treated Potable Water Pipeline.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sanitary sewer system improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of PVC and DIP piping ranging from 6 to 30 inches, the construction of standard and doghouse manholes, and the execution of 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional requirements include CSO regulator fit out, outfall construction, maintenance of flows and bypass operations, and the abandonment of existing pipes and manholes. Project execution requires strict adherence to environmental standards through SWPPP implementation and maintenance, as well as the use of geotechnical instrumentation and monitoring. Due to the project location and nature, railroad insurance is a mandatory requirement. General site preparation tasks such as clearing and grubbing of wooded areas and subsequent seeding and fine grading are also included in the bid schedule.
Cleary Construction, Inc.

POSTED

about 7 hours ago

DEADLINE

in 16 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS