Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Wisconsin was posted on December 9, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Outfall Condition Assessment - Phase 1

Closed
9449409State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 334511
New
DIBBS
TRAP, WATER, ANESTHESIA
Solicitation # SPE2DS-27-T-0848
Solicitation SPE2DS-27-T-0848 is a fixed-price procurement issued by the DLA Troop Support Medical Supply Chain for four packages of anesthesia monitor water traps, identified by NSN 6515-01-586-5431. These disposable plastic traps feature two hydrophobic microporous PFE membranes with a 0.2 micrometer pore size, designed to be impermeable to bacteria, germs, and condensed water for use with anesthetic agent monitor NSN 6515-01-502-2117. The items must have a shelf life of 152 months, with no more than 22 months elapsed from the date of manufacture to the date of government delivery. Delivery is required within 20 days ADO to the USS George H W Bush CVN 77 in FPO AE 09513, with FOB and inspection/acceptance points set to destination. Compliance requires adherence to the DLA Master List of Technical and Quality Requirements (RA001) and DLA packaging requirements (RP001). Packaging must follow ASTM D3951, and marking must comply with Medical Marking Standard No.1, which supersedes MIL-STD-129. Offerors must provide source and part number details and are subject to the Buy American Act and Berry Amendment restrictions. Technical acceptability depends on the submission of Safety Data Sheets for hazardous materials and the exclusion of additive manufacturing processes. Invoicing and payment will be processed electronically through the Wide Area WorkFlow system.
MEDICAL SUPPLY CHAIN MD SURG FSF

POSTED

about 15 hours ago

DEADLINE

in 2 days

AI Contract Overview

Show more

The contract involves conducting a comprehensive condition assessment of 21 outfall sewer systems and their associated structures across 17 sites within Wisconsin, managed by the Milwaukee Metropolitan Sewerage District. The sewer systems vary in size, from 36-inch diameter pipes to large box structures measuring 72 inches by 144 inches. Prior to assessment, the contractor will clean ten of these outfalls. The evaluation will utilize multi-sensor inspection technology, including high-definition CCTV and profilometry tools, to thoroughly examine all systems. For five of the outfalls, submersible sonar equipment will also be employed to gather detailed condition data. Additionally, the project encompasses the inspection of 38 manhole structures. The contractor is responsible for managing traffic control and obtaining necessary permits to facilitate the work. The project budget ranges from $500,000 to $1.5 million, with a response deadline of January 21, 2025. The primary point of contact is Nathan Churchill, and further details can be accessed through the provided online link.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWisconsin → Milwaukee Metropolitan Sewerage District
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts

Full Description

Show more
The Contractor will perform a condition assessment of 21 outfall sewer systems and adjacent structures across 17 sites. The outfall pipe sizes range from a 36-inch-diameter circular pipe to a 72-inch by 144-inch box structure. The Contractor will clean ten outfall sewer systems before performing condition assessment. The Contractor will be required to utilize multi-sensor inspection (MSI) to determine the condition of the pipe. The MSI assessment should include HD CCTV and profilometry equipment for comprehensive inspections of all 21 outfall systems. Additionally, submersible sonar equipment will be required for five of these systems. There are 38 manhole structures throughout the 21 sites that require condition assessment investigation. The Contractor is responsible for traffic control and permitting.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS