Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Oxic Basin Egger Valves for Wastewater Reclamation Facility (WRF)

Open
26-062State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Pueblo is soliciting bids for the installation of Oxic Basin Egger Valves at the Wastewater Reclamation Facility in Pueblo, Colorado. The project aims to replace existing 8-inch ABZ butterfly valves with new 6-inch Egger Brand iris combination pressure reducing and pressure sustaining valves to improve airflow control. The current system lacks the precision needed for lower flow rates, and the transition to iris valves is expected to provide more linear, laminar airflow, optimize the activated sludge process, and potentially reduce blower energy consumption by up to 20 percent. The scope of work includes the removal of existing valves and piping and the installation of eight Egger iris valves, eight Auma brand actuators, and Felker Custom Spool Pieces. The contract will be awarded to the responsible bidder who submits the lowest and most responsive bid, with the award at the sole discretion of the City. Bidders must provide a bid security of 5 percent and submit all proposals by December 9, 2026. Key requirements include compliance with OSHA safety standards, the Davis-Bacon Act, and Section 3 business certifications. The successful contractor must furnish payment and performance bonds within ten business days of the award and provide comprehensive documentation, including startup and commissioning reports, O&M manuals, and manufacturer warranties. All work is subject to the inspection and approval of the Engineer, and any defective workmanship must be remedied immediately.

General Info

City of Pueblo seeks bids to install Egger valves at wastewater facility.

Documents

12
PDF, High priority: read this firstproposal
High
PDF, High priority: read this first10 pages · wage-determination
High
PDF, High priority: read this firstifb
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this first8 pages · contract-document
High
PDF, High priority: read this first8 pages · contract-document
High
PDF, Low priority3 pages · required-forms
Low
PDF, Low priority6 pages · other
Low
PDF, Low priority13 pages · policy-guide
Low
PDF, Low priorityspecifications
Low
PDF, Low priority1 page · ffata-reporting-form
Low
JPG

Read all 12 documents

Due in 22 days

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 22 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 12 solicitation documentsRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
  • Buyer contactEmail and phone
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyColorado → Wastewater
Contacts2 people available
OfficePueblo, CO, 81003, USA

Interested Companies (3)

CGRSFort Collins, CO
Industrial Constructors/ManagersPueblo, CO
jhgfytretretr

Full Description

Show more
The project site is located at the City of Pueblo Wastewater Reclamation Facility (WRF), 1300 S. Queens Ave., Pueblo, CO 81001. The City is seeking to improve air-flow control to the Oxidation Reactors. The existing system uses butterfly valves to regulate airflow; however, these valves have an approximately 3:1 turndown capability and provide relatively coarse, turbulent control at lower flow rates. The reactors were originally designed to operate at airflow rates of approximately 500 to 1,000 cubic feet per minute (CFM) to reduce ammonia in the biological process. The facility now uses a control approach that compares ammonia, nitrate, and nitrite readings to establish dissolved oxygen (DO) setpoints for each reactor. This operating approach allows higher ammonia levels to reduce nitrate (NO3) and nitrite (NO2) concentrations while maintaining the DO levels needed for treatment. As a result, current airflow demand has decreased to approximately 100 to 250 CFM. At these lower flow rates, the existing butterfly valves operate near the low end of their control range, limiting their ability to provide stable and precise airflow control. The proposed Iris valves are intended to provide greater turndown capability and more linear, laminar airflow characteristics. This smoother, more repeatable control is expected to improve DO control, support optimization of the activated sludge process, reduce blower discharge pressures, and potentially reduce blower energy use by up to 20 percent. Aeration and DO delivery can account for up to 60 percent of a wastewater treatment plant's energy consumption.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises for labor, materials, and services for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves extensive sewer infrastructure improvements, including the open-cut installation of PVC and Ductile Iron Pipe ranging from 6 to 30 inches in diameter. Key technical requirements include the installation of standard and doghouse manholes, interior drop assemblies, and 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional deliverables include the construction of an outfall and a CSO regulator fit out. Project requirements also encompass critical site management and compliance tasks, such as the implementation and maintenance of a Stormwater Pollution Prevention Plan, geotechnical instrumentation and monitoring, and the maintenance of flows and bypass. General base bid items include mobilization, clearing and grubbing of wooded areas, and seeding and fine grading. Notably, the project requires specific railroad insurance.
Cleary Construction, Inc.

POSTED

43 minutes ago

DEADLINE

in 16 days
View Details
NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is centered on four major components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. To complete these objectives, the project requires a full suite of materials, labor, and equipment, including specialized services such as jack and bore, cold planing, SWPPP, AC paving, welding, potholing, and preconstruction video. This solicitation is specifically targeted toward SBA certified HUBZone Small Businesses and Disadvantaged Business Enterprises, with a strong emphasis on partnering with certified DBE, MBE, SBE, WBE, SBRA, and LSAF firms. Interested subcontractors must submit their responses by the deadline of November 19, 2026, at 2:00 PM. Primary points of contact for this effort are Destiny Plummer and Nathan Plummer. All work must be performed in strict accordance with the project bid documents and specifications provided by the Inland Empire Utilities Agency.
Norstar Plumbing and Engineering, Inc

POSTED

43 minutes ago

DEADLINE

in 1 day
View Details

More opportunities from Colorado → Wastewater

Same awarding agency

NAICS: 238220
New
SLED
New AC Units for DAFT Building and Secondary Building at WRF
Solicitation # 26-050
The City of Pueblo, Colorado, is soliciting bids for the installation of new air conditioning units in the electrical rooms of the DAFT and Secondary Buildings at the Wastewater Reclamation Facility. The project involves conducting a site assessment, removing an inadequate swamp cooler from the Secondary Building, and installing new AC units in two rooms of approximately 600 square feet each. The contractor is responsible for providing new electrical power, mounting the units on the rooftops, and configuring digital thermostats and control systems. Because these rooms house critical electrical equipment that must remain cool and dry, the work must be performed without interfering with daily operations, and the areas must remain accessible to City staff. The contract will be awarded to the responsible bidder who submits the lowest and most responsive bid. To be deemed responsible, the contractor must be licensed, financially capable, and not delinquent in City taxes or under suspension or debarment. Key requirements include a minimum one-year warranty on parts and labor, a detailed commissioning report, and the provision of operation and maintenance training for City personnel. The contractor must also comply with the Davis-Bacon Act, provide workers' compensation and public liability insurance, and furnish payment and performance bonds within ten business days of the award. Bids must be submitted via the OpenGov Procurement portal by December 9, 2026, and must include a bid guarantee of 5 percent of the total bid.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

about 5 hours ago

DEADLINE

in 22 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS