Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Oxygen Distribution Manifold and Delivery System

Open
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract, titled Oxygen Distribution Manifold and Delivery System, involves the supply and integration of oxygen plumbing, valves, and delivery interfaces for prime contractors on Army Contracting Command aviation projects. The scope of work includes the design of distribution lines and RORO quick-connect interfaces specifically engineered to maintain proper breathing flow and mask pressure without requiring permanent modifications to the aircraft. The project requires the use of medical-grade regulators and high-pressure aviation-grade tubing in strict accordance with AMACC and MIL-PRF-27210 standards. The final deliverables consist of the installed distribution manifold and crew interface connections. This Department of Defense effort is managed by agency W6QK Acc-Rsa under NAICS code 336413, with a response deadline of December 16, 2026.

General Info

Subcontract for Army aviation oxygen distribution systems and interfaces due December 16, 2026.

NAICS

336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing

Place of Performance

Unknown, N/A, AX1

Set-Aside

NONE

Documents

This scope was carved out of PANRSA-27-P0000-044177.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Supplementary Oxygen Capability for MV-75 Cheyenne

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 30 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 1 document on the prime contractFrom Supplementary Oxygen Capability for MV-75 Cheyenne
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W6QK Acc-Rsa
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and integrates oxygen plumbing, valves, and delivery interfaces for prime contractors on Army Contracting Command aviation projects. Designs distribution lines and RORO quick-connect interfaces to avoid permanent aircraft modification while ensuring proper breathing flow and mask pressure. Uses high-pressure aviation-grade tubing and medical-grade regulators per MIL-PRF-27210 and AMACC. Delivers installed distribution manifold and crew interface connections.

Similar Contracts

Same NAICS industry code

More opportunities from Department Of Defense → W6QK Acc-Rsa

Same awarding agency

NAICS: 336413
New
Federal
Supplementary Oxygen Capability for MV-75 Cheyenne
Solicitation # PANRSA-27-P0000-044177
The Department of Defense, through the Army Contracting Command, Redstone Arsenal, is conducting market research via a Sources Sought Notice to identify portable, roll-on/roll-off (RORO) supplementary oxygen system solutions for MV-75 Cheyenne aircrew. The goal is to find self-generating oxygen systems that support at least two pilots and one nonrated crewmember for approximately seven hours at altitudes up to 18,000 feet. These systems must minimize reliance on fixed-base infrastructure or stored cylinders, be installable without significant permanent aircraft modification, and fit within a preferred installation envelope of 2.5 cubic feet. Technical considerations include adherence to MIL-STD-3050, MIL-PRF-27210, and Army Military Airworthiness Certification Criteria to ensure proper breathing flow, oxygen concentration, and contaminant control without impeding aircrew movement or emergency egress. Interested respondents must submit a PDF narrative of no more than eight pages by December 16, 2026. The submission must include a company overview with CAGE and UEI codes, a detailed description of capabilities and relevant experience, and any feedback on alternative operational approaches. The government is specifically seeking information from various business sizes and socio-economic categories, including small businesses and non-traditional defense contractors as defined by DFARS 202.101. This notice is for market research purposes only and does not constitute a formal request for proposal or a commitment to award a contract.
Other Aircraft Parts and Auxiliary Equipment Manufacturing

POSTED

about 13 hours ago

DEADLINE

in 30 days
View Details
NAICS: 236220
New
Federal
Multi-Site Indirect Fire (IDF) Concrete Bunker Construction & Installation
Solicitation # ASGOCS-JXXF1113
The Department of Defense, via the United States Army Central and Area Support Group Jordan, is seeking a contractor to deliver, assemble, backfill, and commission seventeen standardized precast reinforced concrete Indirect Fire (IDF) bunkers across five distinct sites. The project is distributed across three countries: ten bunkers in the State of Israel, five in the Kingdom of Saudi Arabia, and two in the Republic of Lebanon. The anticipated contract is a Firm-Fixed-Price or agreement that requires the contractor to provide all engineering, licensed technical oversight, labor, materials, and heavy equipment, including the connection of facilities to base electrical, water, and sewer systems. The period of performance is strictly 45 calendar days per country/site task order, with the first 15 days dedicated to site surveys, security vetting, and design submittals (60%, 90%, and 100%), followed by 30 days for construction and final inspection. All work must comply with the International Building Code and specific USG quality standards, ensuring facilities remain durable with minimal maintenance for 10 years. Contractors must adhere to rigorous security protocols, including NCIC-III and TSDB background checks, and follow strict environmental guidelines prohibiting materials such as asbestos and lead. Interested firms must submit an 8-page capabilities package by November 25, 2026, detailing their technical sourcing, past performance in CENTCOM locations, and mobilization feasibility.
Commercial and Institutional Building Construction

POSTED

4 days ago

DEADLINE

in 9 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS