Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on November 11, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Oyster Point Sanitary Sewer Pump Station Relocation

Closed
SS2202State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
SLED
Bonniebrook Water Service Lateral Reconnection
Solicitation # UH21004
The City of Stockton is soliciting bids for the Bonniebrook Water Service Lateral Reconnection project (UH21004), which involves the installation of approximately 300 linear feet of 1-inch potable water service lines using Horizontal Directional Drilling (HDD). The scope of work covers six residential homes along Bonniebrook Drive, between Woodside Drive and Fernvale Drive, in Stockton, California. The contractor is responsible for all labor, materials, and equipment required to extend service lines from new water meter boxes in residential front yards to existing potable water systems. Key deliverables include HDD installation, residential service transfer, capping and abandoning existing services, testing, flushing, disinfection, commissioning, and final surface restoration and cleanup. The contract will be awarded to the lowest responsive and responsible bidder based on the total price of the base bid and any selected alternates. Bidders must submit sealed envelopes containing official bid documents, a non-collusion declaration, and bid security. The successful contractor must provide both a Faithful Performance Bond and a Labor and Materials Bond, each for 100 percent of the contract bid price, issued by a company authorized in the State of California. Additionally, the contractor must adhere to prevailing wage rates and Title VI non-discrimination requirements. All work and materials are subject to inspection by the Construction Manager, and no work may be concealed without prior approval. Materials must be stored according to manufacturer instructions and hazardous materials must be handled in accordance with Material Safety Data Sheets and federal, state, and local regulations.
City of Stockton

POSTED

about 4 hours ago

DEADLINE

in about 1 month
NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sanitary sewer system improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of PVC and DIP piping ranging from 6 to 30 inches, the construction of standard and doghouse manholes, and the execution of 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional requirements include CSO regulator fit out, outfall construction, maintenance of flows and bypass operations, and the abandonment of existing pipes and manholes. Project execution requires strict adherence to environmental standards through SWPPP implementation and maintenance, as well as the use of geotechnical instrumentation and monitoring. Due to the project location and nature, railroad insurance is a mandatory requirement. General site preparation tasks such as clearing and grubbing of wooded areas and subsequent seeding and fine grading are also included in the bid schedule.
Cleary Construction, Inc.

POSTED

about 5 hours ago

DEADLINE

in 17 days

AI Contract Overview

Show more

The Oyster Point Sanitary Sewer Pump Station Relocation project (Project No. SS2202, Bid No. 2723) is a public works initiative by the City of South San Francisco located at the Oyster Point Marina. The scope of work involves relocating and upgrading the existing vacuum and ejector pump station to a traditional pump station, relocating electrical switchgear serving the eastern marina, installing new ejector pumps at each marina facility, and implementing a new collection force main system. Additionally, the project requires installing a new pump ahead on the public dock, decommissioning the existing pump station, and abandoning the current vacuum main system. The Engineer's Estimate for the project is 5.16 million dollars, and a Class A Contractor's license is required for performance. The contract is structured as a two-stage work order with a total completion time of 300 working days. Stage 1 focuses on pre-construction and submittals within 50 working days, while Stage 2 covers four construction phases over 250 working days. Liquidated damages for delays are set at 3,600 dollars per calendar day. Award is based on the lowest responsible bidder. The project includes specialized requirements for asbestos abatement of pipe flange gaskets, adherence to a Construction and Demolition Waste Management Plan requiring 65 percent non-inert waste diversion, and compliance with groundwater discharge permits. Bidders must provide a comprehensive suite of bonds, including payment, faithful performance, and guaranty bonds, and must adhere to prevailing wage standards.

General Info

South San Francisco pump station relocation project costing 5.16 million over 300 days.

Documents

27
PDF, High priority: read this firstamendment
High
PDF, High priority: read this first5 pages · specifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this first50 pages · specifications
High
PDF, High priority: read this first8 pages · specifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this first7 pages · specifications
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this first6 pages · ifb
High
PDF, High priority: read this first15 pages · contract-document
High
PDF, High priority: read this first72 pages · specifications
High
PDF, High priority: read this first78 pages · specifications
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this first25 pages · ifb
High
PDF, High priority: read this first36 pages · special-conditions
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this first873 pages · specifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, Low priority198 pages · report
Low
PDF, Low priority2 pages · industry-day
Low

Read all 27 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Bonniebrook Water Service Lateral ReconnectionOpen now, due in 31 days
  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 17 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

5 updates
PhaseClosed
Posted

Solicitation

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Nov 5, 2026 to Nov 12, 2026. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Nov 12, 2026 to Nov 13, 2026. The notice description changed.

Notice updated

Response deadline changed from Nov 13, 2026 to Nov 16, 2026. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works/Engineering Division
Contacts1 person available
OfficeSouth San Francisco, CA, 94080, USA

Interested Companies (74)

A&B ConstructionOakland, CA
AAA FenceSanta Clara, CA
Anderson Pacific Engineering ConstructionSanta Clara, California

See All 74 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
General work description: The work consists of relocating and upgrading the existing vacuum and ejector pump station to a traditional pump station, relocating the electrical switchgear cabinet that serves the eastern half of the marina, installing new ejector pumps at each marina facility, installing new collection force main system, installing a new pump ahead on the public dock, decommissioning the existing pump station, and abandoning the existing vacuum main system. The project is located at the Oyster Point Marina in South San Francisco, CA. The Engineer's Estimate for the project is $5.16M. A detailed scope of work is included in the bid documents.
Official Notice #1: Pre-Bid Meeting Sign-in Sheet: Please see the attached sign-in sheet from the October 20 pre-bid meeting. Attachments: SS2202_Pre-bid_Sign-in_Sheet.pdf
Addendum #1: Please use the See What Changed link to view all the changes made by this addendum. And review, sign and upload the addendum notice. Attachments: Addendum_No._1_Notice_-_2026.10.29.pdf
Addendum #2: Please use the See What Changed link to view all the changes made by this addendum. And review, sign and upload the addendum notice. Attachments: Addendum_No._2_Notice_-_2026.10.30.pdf
Addendum #3: Please use the See What Changed link to view all the changes made by this addendum. And review, sign and upload the addendum notice. Attachments: Addendum_No._3_Notice_-_2026.11.06.pdf
Addendum #4: Please use the See What Changed link to view all the changes made by this addendum. And review, sign and upload the addendum notice. Attachments: Addendum_No._4_Notice_-_2026.11.10.pdf

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS