This Solicitation opportunity from California was posted on November 11, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The Oyster Point Sanitary Sewer Pump Station Relocation project (Project No. SS2202, Bid No. 2723) is a public works initiative by the City of South San Francisco located at the Oyster Point Marina. The scope of work involves relocating and upgrading the existing vacuum and ejector pump station to a traditional pump station, relocating electrical switchgear serving the eastern marina, installing new ejector pumps at each marina facility, and implementing a new collection force main system. Additionally, the project requires installing a new pump ahead on the public dock, decommissioning the existing pump station, and abandoning the current vacuum main system. The Engineer's Estimate for the project is 5.16 million dollars, and a Class A Contractor's license is required for performance.
The contract is structured as a two-stage work order with a total completion time of 300 working days. Stage 1 focuses on pre-construction and submittals within 50 working days, while Stage 2 covers four construction phases over 250 working days. Liquidated damages for delays are set at 3,600 dollars per calendar day. Award is based on the lowest responsible bidder. The project includes specialized requirements for asbestos abatement of pipe flange gaskets, adherence to a Construction and Demolition Waste Management Plan requiring 65 percent non-inert waste diversion, and compliance with groundwater discharge permits. Bidders must provide a comprehensive suite of bonds, including payment, faithful performance, and guaranty bonds, and must adhere to prevailing wage standards.
General Info
South San Francisco pump station relocation project costing 5.16 million over 300 days.
HighAI Summary for Addendum No. 1 Notice - 2026.10.29: Addendum No. 1 issued by the City of San Francisco, approved by Senior Engineer Jeffrey Chou. The document modifies the bid documents by updating timelines and deadlines, directing bidders to the e-Procurement Portal for the latest information.
PDF
PDF, High priority: read this first5 pages · specifications
HighAI Summary for Appendix B: Groundwater Discharge Permit Requirements: This document outlines the requirements and application process for obtaining a Groundwater/Pit Water Discharge Permit from the City of South San Francisco. It includes mandatory sampling parameters (COD, TSS, pH, VOCs, Metals, Flashpoint, TPH), flow rate restrictions, billing rates ($0.10/gallon), and a detailed list of local discharge limits. The file also contains the official Wastewater Discharge Application form and certification requirements. Revised 11/27/18.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Appendix G: Existing Pump Station Record Drawings (SS2202): Technical record drawings and as-built specifications for the Oyster Point Marina/Park pump station, prepared by Daniel, Mann, Johnson & Menenhall for the San Mateo County Harbor District. The document includes elevation diagrams, structural details, general notes, and a detailed equipment list for the vacuum central piping system, including a 2500-gallon vapor generator tank and suction pumps.
PDF
PDF, High priority: read this first50 pages · specifications
HighAI Summary for Asbestos Abatement Specification - Oyster Point Pump Station: Technical specifications dated November 18, 2024, for the removal of twenty asbestos-containing pipe flange gaskets at the Oyster Point Pump Station in South San Francisco, CA. The document outlines the glove bag removal method, applicable federal (OSHA, EPA) and state (Cal/OSHA) regulations, contractor qualification requirements, and PPE standards.
PDF
PDF, High priority: read this first8 pages · specifications
HighAI Summary for City of South San Francisco Construction and Demolition Waste Management Plan: This document outlines the requirements for the Construction and Demolition Waste Management Plan (WMP) for the City of South San Francisco. It mandates a 65% diversion of non-inert waste and 100% of inert materials from landfills. The file includes the application process, deposit requirements ($50/ton), waste estimation guidelines, and the Diversion Assessment Form required for deposit refunds.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for City of South San Francisco - Project Plans (Add No. 2): Technical project plans and specifications for the City of South San Francisco, San Mateo County. The document includes horizontal and vertical control points, requirements for record drawings, structural inspection and testing schedules, and a civil sheet index for force main layouts. Dated October 30, 2026.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Oyster Point Marina Pump Station Technical Specifications: Technical specifications for the Oyster Point Marina Pump Station project (100% PS&E), including sections on the issuance of drawings, mandatory provisions, project scheduling, and work restrictions. It outlines requirements for the installation of E-One grinder pump stations, wet well construction, and wastewater discharge constraints.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Oyster Point Marina Pump Station Technical Specifications: Technical specifications for the Oyster Point Marina Pump Station project (100% PS&E), prepared by Schaaf & Wheeler. The document includes sections on the issuance of drawings and specifications (01 11 40), mandatory provisions (01 11 50), project scheduling and milestones (01 13 00), and work restrictions (01 14 00), including site access and operational constraints for wastewater collection.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Oyster Point Marina Pump Station Technical Specifications: Technical specifications for the Oyster Point Marina Pump Station project, including sections on the issuance of drawings, mandatory provisions, project scheduling, and work restrictions. The document outlines requirements for the installation of E-One grinder pump stations, wet wells, and electrical equipment, while establishing operational constraints and project milestones.
PDF
PDF, High priority: read this first7 pages · specifications
HighAI Summary for Oyster Point Marina - Short Circuit Electrical Report: A comprehensive short circuit electrical study report for the Oyster Point Marina project, utilizing DAPPER software. The document provides detailed technical data on fault contributions, including initial symmetrical and asymmetrical amperes for three-phase, single line-to-ground, and line-to-line faults across various buses, transformers, and cables.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Oyster Point Sanitary Sewer Pump Station Relocation - Addendum No. 2: Addendum No. 2 dated October 30, 2026, for Project No. SS2202 (Bid No. 2723). It modifies the pricing table for Item No. 42 (Pump Station Concrete Slab) from LS to SF, updates Special Conditions regarding shutdown requirements and building items, revises Technical Specifications section references, and provides numerous updates to Project Plans, including drawing revisions and the inclusion of missing sheets.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Oyster Point Sanitary Sewer Pump Station Relocation - Addendum No. 2: Addendum No. 2 dated October 30, 2026, for the Oyster Point Sanitary Sewer Pump Station Relocation Project (Project No. SS2202, Bid No. 2723). This document modifies the pricing table for Item No. 42, updates Special Conditions regarding shutdown requirements and gravel walks, corrects technical specification references, and provides numerous revisions to project plans and drawings, including the addition of Appendix G.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Oyster Point Sanitary Sewer Pump Station Relocation - Addendum No. 3: Addendum No. 3 dated November 6, 2026, for the Oyster Point Sanitary Sewer Pump Station Relocation Project (No. SS2202, Bid No. 2723). This document modifies the bid documents by updating timeline deadlines, increasing the quantity of Base Bid Item No. 33 (Storm Drain Inlets) from 2 to 4, revising the Prime Contractor's work percentage to 30%, and updating technical specifications regarding hazardous waste and contamination references.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Oyster Point Sanitary Sewer Pump Station Relocation - Addendum No. 3: Addendum No. 3 dated 11/6/2026 for the Oyster Point Sanitary Sewer Pump Station Relocation (Project No. SS2202, Bid No. 2723) for the City of South San Francisco. The document provides the proposal forms required for bid submission, including company profile, certifications, and bond requirements, and outlines the bidding instructions and submission criteria.
PDF
PDF, High priority: read this first6 pages · ifb
HighAI Summary for Oyster Point Sanitary Sewer Pump Station Relocation (Bid No. 2723): Notice Inviting Bids issued by the City of South San Francisco on 10/1/2026 for Project No. SS2202. The project involves relocating and upgrading the Oyster Point Sanitary Sewer Pump Station, including electrical switchgear relocation and installation of new ejector pumps and force main systems. Bids are due by 2:00 P.M. on 11/5/2026 via the eProcurement Portal. The Engineer's Estimate is $5.16M, and a Class A Contractor's license is required.
PDF
PDF, High priority: read this first15 pages · contract-document
HighAI Summary for Oyster Point Sanitary Sewer Pump Station Relocation - Form of Agreement: This document is a Form of Agreement for public improvements between the City of South San Francisco and a contractor for the Oyster Point Sanitary Sewer Pump Station Relocation (Project No. SS2202, Bid No. 2723). Issued for bid on October 1, 2026, it outlines the scope of work, contract documents, payment terms, and legal provisions regarding performance, termination, and insurance.
PDF
PDF, High priority: read this first72 pages · specifications
HighAI Summary for Oyster Point Sanitary Sewer Pump Station Relocation - General Conditions (Bid No. 2723): General Conditions document for the Oyster Point Sanitary Sewer Pump Station Relocation project (Project No. SS2202, Bid No. 2723) for the City of South San Francisco. Issued for bid on 10/1/2026, the document outlines proposal requirements, award and execution processes, scope of work, control of materials, legal responsibilities, prosecution and progress, and measurement and payment terms.
PDF
PDF, High priority: read this first78 pages · specifications
HighAI Summary for Oyster Point Sanitary Sewer Pump Station Relocation Geotechnical Study: Geotechnical study report dated December 1, 2023, prepared by Langan Engineering and Environmental Services, Inc. for the relocation of a sanitary sewer pump station in South San Francisco, California. The document provides critical technical data on subsurface conditions, seismic hazards, foundation recommendations, and construction considerations for the pump station footprint.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Oyster Point Sanitary Sewer Pump Station Relocation Project - Addendum No. 4: Addendum No. 4 dated November 10, 2026, for Project No. SS2202 (Bid No. 2723). This document modifies the bid proposals by updating timeline and deadlines via the City of San Francisco e-Procurement Portal and revising Technical Specifications Section 27 15 00 – 5, Item 2.03 regarding radio equipment.
PDF
PDF, High priority: read this first25 pages · ifb
HighAI Summary for Oyster Point Sanitary Sewer Pump Station Relocation Proposal Forms (Project SS2202, Bid 2723): This document contains the proposal forms and submission requirements for the City of South San Francisco's Oyster Point Sanitary Sewer Pump Station Relocation project (Project No. SS2202, Bid No. 2723). Issued for bid on 10/1/2026, it includes the formal bid proposal, company profile requirements, and a list of mandatory submission documents such as the bid bond, non-collusion declaration, and certifications. It specifies that the award will be based on the lowest responsible bidder.
PDF
PDF, High priority: read this first36 pages · special-conditions
HighAI Summary for Oyster Point Sanitary Sewer Pump Station Relocation - Special Conditions: Issued for bid on 10/01/2026, this document outlines the Special Conditions for Project No. SS2202 (Bid No. 2723) regarding the relocation of the Oyster Point Sanitary Sewer Pump Station in South San Francisco, CA. It details a two-stage work order: Stage 1 (Limited NTP) focusing on submittals and permits within 50 working days, and Stage 2 (NTP) divided into four construction phases within 250 working days. The document specifies a total completion time of 300 working days and establishes liquidated damages at $3,600 per calendar day of delay.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Oyster Point Sanitary Sewer Pump Station Relocation - Special Conditions (Addendum 2): Special Conditions for Project No. SS2202, Bid No. 2723, updated via Addendum No. 2 on 10/30/2026. The document outlines the scope for relocating the Oyster Point Sanitary Sewer Pump Station in South San Francisco, CA. It defines a two-stage work order: Stage 1 (50 working days) for pre-construction and submittals, and Stage 2 (250 working days) divided into four construction phases. Total completion is set for 300 working days. It specifies liquidated damages of $3,600 per calendar day of delay and details requirements for submittals, long-lead items, and site coordination.
PDF
PDF, High priority: read this first873 pages · specifications
HighAI Summary for Oyster Point Sanitary Sewer Pump Station Relocation - Technical Specifications: Technical specifications for the City of South San Francisco Project No. SS2202 (Bid No. 2723) regarding the Oyster Point Sanitary Sewer Pump Station Relocation. Dated September 2026, the document includes project sequencing, mandatory provisions, project milestones, and work restrictions for the construction and demolition of pumping facilities.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Project Plans - Oyster Point Sanitary Sewer Pump Station Relocation (SS2202): Technical project plans and specifications for the construction of the Oyster Point Sanitary Sewer Pump Station Relocation (Project No. SS2202) in South San Francisco. The document includes datum information, horizontal and vertical control points, requirements for record drawings, and a schedule for structural inspection and testing.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Project Plans: Oyster Point Sanitary Sewer Pump Station Relocation (SS2202): Technical project plans and general notes for the construction of the Oyster Point Sanitary Sewer Pump Station Relocation (Project No. SS2202) for the City of South San Francisco. The document includes datum information, control points, a sheet index for civil and electrical plans, and detailed general notes regarding construction responsibilities, special inspections, and geotechnical requirements.
PDF
PDF, Low priority198 pages · report
LowAI Summary for 2025 Annual Report - Former Oyster Point Landfill: Annual monitoring report dated January 30, 2025 (and 2026), prepared by CSS Environmental Services, Inc. for the City of South San Francisco and the Regional Water Quality Control Board. The document details compliance with RWQCB Order No. 00-046, covering groundwater and leachate monitoring, landfill gas perimeter monitoring, stormwater monitoring, and site maintenance activities for the former Oyster Point Landfill.
PDF
PDF, Low priority2 pages · industry-day
LowAI Summary for Oyster Point Sanitary Sewer Pump Station Replacement (SS2202) Pre-Bid Sign-in Sheet: Attendance record for the pre-bid meeting held on October 20, 2026, for the Oyster Point Sanitary Sewer Pump Station Replacement project (SS2202). The document lists participating representatives from various engineering and construction firms and notes an estimated cost of $185,885,875.
General work description: The work consists of relocating and upgrading the existing vacuum and ejector pump station to a traditional pump station, relocating the electrical switchgear cabinet that serves the eastern half of the marina, installing new ejector pumps at each marina facility, installing new collection force main system, installing a new pump ahead on the public dock, decommissioning the existing pump station, and abandoning the existing vacuum main system. The project is located at the Oyster Point Marina in South San Francisco, CA. The Engineer's Estimate for the project is $5.16M. A detailed scope of work is included in the bid documents. Official Notice #1: Pre-Bid Meeting Sign-in Sheet: Please see the attached sign-in sheet from the October 20 pre-bid meeting. Attachments: SS2202_Pre-bid_Sign-in_Sheet.pdf Addendum #1: Please use the See What Changed link to view all the changes made by this addendum. And review, sign and upload the addendum notice. Attachments: Addendum_No._1_Notice_-_2026.10.29.pdf Addendum #2: Please use the See What Changed link to view all the changes made by this addendum. And review, sign and upload the addendum notice. Attachments: Addendum_No._2_Notice_-_2026.10.30.pdf Addendum #3: Please use the See What Changed link to view all the changes made by this addendum. And review, sign and upload the addendum notice. Attachments: Addendum_No._3_Notice_-_2026.11.06.pdf Addendum #4: Please use the See What Changed link to view all the changes made by this addendum. And review, sign and upload the addendum notice. Attachments: Addendum_No._4_Notice_-_2026.11.10.pdf
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award